User: bajosparky, Location: Chicago
Asked on: Wednesday, July 31, 2024 at 12:48 am EDT
Answered on: Thursday, March 6, 2025 at 12:31 am EST
Question: Hi guys.As I'm flipping page by page,into the NEC I can't find specific article number.I go over 225,but can't find about, running(or) passing home run Emt for feeders that supply a dwelling unit, through another dwelling unit.Since there is not much space in the hallway?.
You are right, there isn't a single, specific article in the NEC that directly addresses running EMT feeders for one dwelling unit through another dwelling unit. Instead, it's a combination of articles and general principles that determine if this is allowed and how to do it safely and legally. Think of it as a jigsaw puzzle, not a single block.Here's how the relevant NEC articles and principles apply
1. 225.30 Number of Supplies (Feeders):
This section generally limits a dwelling unit to one feeder. However, it also provides exceptions. You'll need to carefully examine the exceptions to see if any apply to your situation. For example, Exception No. 4 might apply if the additional feeder is for a separately derived system (like solar).2. 225.39 Sizes of Conductors for Outside Branch Circuits and Feeders
This covers the ampacity of the conductors and proper sizing for the feeder you are installing.
3. 300.3 Wiring Methods
(A) Single Conductors. Single conductors in cable or raceway must be run in the same raceway. (B) Conductors of the Same Circuit. All conductors of the same circuit and, where used, the grounded conductor and all equipment grounding conductors and bonding conductors shall be contained within the same raceway, cable tray, trench, cable, or cord.4. 300.4 Protection Against Physical Damage
(A) Cables and Raceways Through Wood Members. This section and its subsections cover requirements for boring or notching wood for installation of conduit, cables, etc., to avoid compromising the structural integrity. (B) Nonmetallic-Sheathed Cables and Electrical Nonmetallic Tubing Through Metal Framing Members. This is similar to the requirement for wood members. (D) Cables and Raceways Parallel to Framing Members. This subsection requires a minimum distance from the edge of a framing member or the use of a steel plate or sleeve to protect the cable or raceway.5. 300.11 Securing and Supporting
This section dictates how to properly secure and support your EMT run.
6. 300.15 Raceways and Cable Assemblies Entering Boxes, Conduit Bodies, or Fittings
(A) Raceways. Raceways or cable armors shall be continuous between boxes, conduit bodies, fittings, or other enclosures.7. 300.21 Spread of Fire or Products of Combustion
Raceways passing through fire-rated walls or floors must be properly firestopped. This is a critical safety requirement. Use appropriate firestop materials listed for the purpose.
8. Chapter 9: Tables and Examples
This chapter is essential for conduit fill calculations (how many wires you can put in the EMT) and ampacity adjustments.
9. Article 358: Electrical Metallic Tubing (EMT)
This section covers the uses permitted and not permitted for EMT, as well as installation requirements like bending radius and couplings.
Key Considerations & Why There's No Simple Answer
Right of Way/Easement
This is the big one, and the NEC doesn't cover this. The biggest problem is legal right of way, and liability. This is a legal issue, not an electrical one.
You cannot legally run a feeder through another person's property without their explicit, written permission, and usually a legally established easement. Even if the homeowner says it's okay, that's not sufficient. An easement ensures future owners are bound by the agreement. This is not something you can simply decide to do. Liability
Who is responsible if something goes wrong with the feeder and causes damage to the other dwelling unit? Easements and legal agreements will need to address this.
Accessibility
The NEC generally requires electrical equipment to be accessible. A feeder running through another dwelling unit might be considered inaccessible for maintenance and repair. Inspectors may have differing opinions on this.
Aesthetics/Impact
The other dwelling unit owner may not want EMT running through their hallway, regardless of code compliance.
AHJ Interpretation
Your local Authority Having Jurisdiction (AHJ) has the final say. They might have local ordinances or interpretations that further restrict this type of installation. Always consult with your local building department before starting any work.
Dedicated Space
Using a common hallway can violate dedicated space and could present an accessibility problem.
How to Approach the Problem (and Alternatives)
Legal Consultation
The very first step is to consult with a real estate attorney to discuss easements and liability. This is absolutely critical.2.
Talk to the Other Dwelling Unit Owner
If an easement is legally feasible, have a frank discussion with the other homeowner about the proposed installation, its impact on their property, and the legal and financial responsibilities involved. Get everything in writing.3.
Explore Alternatives
Before going this route, exhaust every other possible option:
Reroute the Feeder
Can you find an alternate path for the feeder that doesn't go through the other dwelling unit? Consider going around, under, or above. This is almost always the best option.
Increase Service Size
Can the original dwelling unit's service panel be upgraded to handle the load for both units (if applicable)? (This is very unlikely in most modern dwelling unit buildings)
Reduce the Load
Can you reduce the electrical load on the dwelling unit that needs the additional feeder?
Relocate the Panel
Can the panel be relocated within the dwelling to a location that makes wiring easier?4.
Detailed Planning
If you've determined an easement is possible and there are no other options, create a detailed plan showing the exact route of the EMT, the methods of support, the firestopping details, and the proposed size of the conduit and conductors.5.
Submit Plans to the AHJ
Present your plans to the local building department before starting any work. Get their approval in writing.
In summary, running a feeder through another dwelling unit is highly problematic and should only be considered as a last resort after exploring all other options and consulting with legal and electrical professionals. The NEC provides guidelines for how to install the wiring safely, but it doesn't address the fundamental legal and logistical issues that make this installation so difficult. Flag for review