Topic: DC Overhead run.

User: msi99, Location: Texas

Asked on: Wednesday, July 31, 2024 at 2:51 pm EDT
Answered on: Thursday, March 6, 2025 at 12:33 am EST

Question: To determine the needed clearance from a Weatherhead to a Weatherhead run between 2 structures on the DC side of a solar installation, we would still have to refer to 225.18, right? 255.18 (3) to be specific.

You're on the right track, but the correct reference is 230.9(A) for service conductors, and Article 690 for solar DC conductors.

Let's break it down: 225.18 pertains to Clearance from Ground. This might be tangentially relevant depending on the physical installation, but it's not the primary consideration for clearances between conductors or from a Weatherhead to another run. 230.9(A) specifically applies to service conductors that are run above the roof. This includes the weatherhead. You would use this article if the conductors are service conductors. Article 690, specifically Part II, Circuit Requirements is where you need to look for clearances related to DC conductors from the solar array, including distances between DC conductors.Here's why:1. Scope of 230

Article 230 covers Services. While the section on clearances from buildings (230.9) is relevant if you are using the weatherhead as your service entrance, it is not for the DC conductors of a solar system.
2.


Scope of Article 690

Article 690 addresses Solar Photovoltaic (PV) Systems. The DC conductors between solar modules, inverters, etc., fall under its purview.3.

Why it matters

Solar DC circuits often operate at higher voltages than typical residential AC services. Therefore, they have different clearance and spacing requirements for safety.

Key Considerations from Article 690



690.31 Methods Permitted

This section dictates how conductors must be run and supported.

690.31(B) Wiring Methods on or Above Roofs

This section addresses the methods of installing PV system wiring on roofs and should be considered.


690.4(B) Ungrounded PV Arrays

This section addresses the PV system's operating voltage based on ambient temperature.*

690.8(A)(1)(a) and (b) and (c) - Maximum Current

These sections discuss calculating maximum current.

In Summary


While 225.18 and 230.9(A) might be relevant in certain very specific scenarios (e.g., if the Weatherhead contains service conductors), for DC runs between structures in a solar installation, focus on Article 690 of the NEC. You will need to carefully review these sections to determine the appropriate spacing based on voltage, wiring method, and location.

Important Note: Always consult the latest edition of the NEC and your local electrical codes and AHJ (Authority Having Jurisdiction) for specific requirements in your area. This information is for general guidance and should not replace professional consultation. Flag for review