Topic: Applicability of 230.85 (Emergency Disconnect) with more than 2 meters.

User: sjdorst, Location: Richmond, CA

Asked on: Friday, August 2, 2024 at 12:26 pm EDT
Answered on: Thursday, March 6, 2025 at 12:39 am EST

Question: I work for an electrical distributor and have received conflicting reports from my customers on what their AHJs are requiring for 230.85 when there is a 3rd meter for a two family dwelling unit!This comes up when there is a 3rd service that serves common area loads (billed to landlord, aka “house” meter), or a 3rd service for a landlord owned and operated solar installation, and sometimes both!Some of our local AHJs consider the addition of a “house” and/or solar meter to cause the overall service to NOT be subject to 230.85. Others are of the opinion that, whether or not there is a “house” or solar service, the underlying building is still a one or two family unit, so 230.85 applies!Would love it if Mike would address as a You Tube - but interested in the thoughts/experiences of members of this forum.

This is a tricky situation, and you're right to seek clarification. Here's a breakdown of the considerations and likely interpretations, based on my understanding of the NEC and common industry practices, followed by suggestions for how to navigate this with your customers and the AHJs

Understanding 230.85 and the Conflict
NEC 230.85 (Emergency Disconnects)

This section of the NEC mandates an outdoor emergency disconnect for one- and two-family dwelling units. This is intended to provide a readily accessible way for first responders to de-energize the building in an emergency.


The Core Question

Does the presence of a third service (house/common area, or solar) negate the applicability of 230.85 to the other services supplying dwelling units within a building clearly designed and used as a one- or two-family dwelling?

Arguments for 230.85 Applying (Even with a 3rd Meter)



The Fundamental Nature of the Building

The dwelling is still physically a one- or two-family dwelling. The presence of a separate service for common areas or solar doesn't change the fundamental design and occupancy.


Safety Intent

The intent of 230.85 is to provide a readily accessible disconnect for emergency responders in a residential setting. This intent remains valid even if there are multiple services. Firefighters aren't going to stop and analyze the wiring diagram to determine which service supplies which part of the building. They want a quick and reliable shutoff.

Focus on the Dwelling Unit

Even if the solar or house meter is
technically a commercial service, the other services are clearly supplying dwelling units. 230.85 should apply to those residential services.

Arguments Against 230.85 Applying (When a 3rd Meter Exists)



Strict Interpretation of "One- and Two-Family Dwelling"

Some AHJs may interpret 230.85 very strictly. They might argue that once you have a third service, the building, as a whole, no longer fits the exact definition of "one- and two-family dwelling unit" as intended by this code section.

"Commercial" Service Considerations

If the house meter serves only common area loads (lighting, laundry, etc.), some AHJs may consider that service a "commercial" service, even if the building is residential. And since commercial services don't typically require 230.85 disconnects, they might extend that logic to the entire service arrangement.

Likely Scenarios and Interpretations


Separate Meter for Common Area Loads (House Meter)

This is the most contentious. Many AHJs will likely require 230.85 disconnects for the dwelling unit services, even with a separate house meter. They'll emphasize the dwelling's fundamental residential nature.
2.


Separate Meter for Landlord-Owned Solar

Here, the interpretation might depend on where the solar power is used.
If the solar solely serves the common areas or is net-metered back to the grid without directly supplying the dwelling units, the AHJ might be less likely to require 230.85 on the dwelling unit services. If the solar can supply power to the dwelling units (even indirectly), the AHJ is more likely to require 230.85 on the dwelling unit services.
3.


Both House Meter and Solar Meter

This adds another layer of complexity. The AHJ's decision will likely hinge on how they interpret the
primary function of the dwelling and the services supplying it.

How to Navigate this as a Distributor


Direct Communication with AHJs is Crucial

This is
the most important step. You need to have direct conversations with the local AHJs in your service area. Document their interpretations in writing if possible (email is often sufficient).

Ask Specific Questions

Don't just ask a general question about 230.85. Present the specific scenarios you're encountering (house meter only, solar meter only, both).

Provide Diagrams

A simple one-line diagram showing the service arrangement can be extremely helpful for the AHJ to understand the setup.


Ask about their Rationale

Understanding why an AHJ is taking a particular position can help you anticipate their requirements in future situations.2.

Inform Your Customers

Transparency is key.

Explain the Conflict

Let your customers know that there are differing interpretations of 230.85 in these multi-service scenarios.


Advise Consultation with the AHJ

Strongly encourage your customers (or their electricians) to contact the local AHJ before starting the project. This can prevent costly rework later.

Document the AHJ's Decision

Tell your customers to get the AHJ's decision in writing (email is fine) and provide a copy to you.3.

Develop Standard Recommendations (Based on AHJ Feedback)

Once you have a clear understanding of the local AHJ requirements, create a set of standard recommendations for your sales team to use when discussing these types of projects with customers. This will help ensure consistency and avoid confusion.4.

Offer Product Solutions for Both Scenarios

Be prepared to supply both the disconnects required by 230.85
and* alternative solutions (e.g., remote shunt trip breakers) that some AHJs might allow if they don't require the 230.85 disconnect.
5.


Consult with a Qualified Electrical Engineer (Optional)

If you're dealing with particularly complex service arrangements or if you're unsure about the proper application of the NEC, consider consulting with a licensed electrical engineer. They can provide a professional opinion and help you ensure compliance with the code.

In summary:


The interpretation of 230.85 in these situations is likely to be inconsistent across jurisdictions. The best approach is to proactively engage with your local AHJs to understand their specific requirements and to communicate those requirements clearly to your customers. Document everything.This information is for general guidance only and should not be considered a substitute for professional advice from a qualified electrician or electrical engineer. Always consult with the local AHJ to ensure compliance with all applicable codes and regulations. Flag for review