User: augie47, Location: Tennessee
Asked on: Saturday, August 10, 2024 at 10:13 am EDT
Answered on: Thursday, March 6, 2025 at 1:00 am EST
Question: Often this ole boy has problems with Code languageTwo such examples are in the '23 Code on 680.26 .Clarification would be appreciated.680.26(B)(1)(f) in discussing the perimeter bond states "Be installed only in perimeter surfaces not intended to have access to the swimmers" ????and680.26(B)(2)(d) Discussing interconnection of bonded portions of perimeter surfaces states listed splicing devices must be incorporated.When the perimeter surface consists of rebar or mesh in the concrete is a listed device required to connect overlapping sections.
You're right, those sections of the 2023 NEC (NFPA 70) 680.26 can be tricky. Let's break them down
680.26(B)(1)(f) Perimeter Bonding - "Be installed only in perimeter surfaces not intended to have access to the swimmers"
The Issue
This seems counterintuitive at first. Why not bond the surfaces swimmers touch?
The Reasoning
This section focuses on a specific type of perimeter bonding designed to equalize the potential between the pool water and surfaces around the pool. It's not about bonding everything swimmers might touch. The intention here is to prevent voltage gradients between the water and the surrounding earth/concrete.
Understanding "Perimeter Surfaces Not Intended to Have Access to Swimmers"
Think of this as referring to the outer edges of the pool deck, or the soil/earth immediately adjacent to the pool's structure, or the surface of an attached spa when the two are separated by a raised bond beam that is intended to prevent access to the other. These are areas a swimmer wouldn't normally walk or stand. If swimmers were to stand on these areas, this creates a gradient between the pool water and earth.
In simpler terms
This rule basically states that you only need to worry about bonding the surrounding surface immediately adjacent to the pool.
680.26(B)(2)(d) Interconnection of Bonded Portions of Perimeter Surfaces - Listed Splicing Devices The Issue
Does this mean every rebar overlap in the concrete needs a "listed splicing device"?
The Reasoning
This is where the Code is specific and often debated. The key is the phrase "interconnection of bonded portions." The intent of this section is to ensure solid, reliable electrical continuity between different sections of the conductive grid (rebar or mesh) embedded in the concrete.
When a Listed Device is Required
Purpose Built
Splice devices are required when overlapping sections of wire are run solely for the purpose of bonding, as opposed to structural reinforcement.
Concrete Pour Interruptions
If the concrete is poured in stages, creating a "cold joint" that can compromise electrical continuity between rebar sections, a listed device is mandatory.
Material Dissimilarity
If overlapping sections of wire are dissimilar, such as galvanized to copper, a listed splicing device rated to resist galvanic corrosion is required.
When a Listed Device is NOT Required
Continuous Pour with Adequate Overlap
In a single, continuous concrete pour, if the rebar or mesh has sufficient overlap and is securely tied together (as per standard construction practices for structural integrity), most inspectors will accept that as meeting the bonding requirement without the need for a separate listed splicing device. The key is that the overlap and tying must provide good electrical conductivity.
Structural Reinforcement
If overlapping sections of rebar are run solely as structural reinforcement, as opposed to bonding, these sections may be exempt from the code as it would be redundant to run separate sections of wire to achieve bonding.
Important Considerations and Why This is Tricky
AHJ (Authority Having Jurisdiction)
Local interpretations vary wildly. Always check with your local inspector before starting any work. They have the final say.
"Listed Splicing Device"
Ensure the device is specifically listed for grounding and bonding purposes. A standard mechanical rebar splice connector may not be sufficient.
Documentation
Keep records of your bonding methods and materials. Photos before the concrete is poured are invaluable.
Testing
After completion, a qualified electrician should test the bonding system for continuity and resistance to ensure it meets code requirements.
In summary
680.26(B)(1)(f)
Bond the outer edges of the pool surface to prevent gradients.
680.26(B)(2)(d)
Generally, if you have a solid, continuous concrete pour with good rebar/mesh overlap and proper ties and that is used as a bonding system, you might be okay without a listed splicing device. However, if you're pouring in multiple stages, bonding dissimilar materials, or the rebar is specifically there for bonding (not structural), you almost certainly will* need listed splicing devices.
Always consult with your local electrical inspector and a qualified electrician to ensure your pool bonding meets all applicable codes and safety standards. They can provide definitive answers based on your specific situation and local regulations. Flag for review