User: mannyb, Location: Florida
Asked on: Wednesday, August 14, 2024 at 4:04 pm EDT
Answered on: Thursday, March 6, 2025 at 1:11 am EST
Question: Customer has a 1.25 conduit that goes under eve of house. The home has a metal bracket for the point of attachment raising the drip loop above 12'. We are installing a new meter loop and service. Does the new meter loop service mast need to be installed? Or could we still use the metal point of attachment at hone?
This is a situation where you need to consider several factors, primarily code compliance and local utility requirements. Here's a breakdown to help you determine the best course of action
Key Considerations:
Local Utility Requirements
This is the most important factor. Your local utility company has specific rules regarding meter loops, point of attachment heights, acceptable attachment methods, and required clearances. You must contact them and get their approval before doing any work. They may require a service mast in this situation, even if the existing setup technically meets code.
National Electrical Code (NEC) Requirements
While the utility has the final say, you still need to adhere to the NEC. Here are some relevant NEC sections:
230.26 Point of Attachment
This section dictates the height requirements for service drops. A key part of this is whether the 12' height is maintainable under all conditions. Consider:
Snow Load
Will accumulated snow on the roof or in the area reduce the clearance below 12 feet?
Sag
How much does the service drop cable sag between the pole and the attachment point? Is there sufficient clearance at the lowest point of sag?
230.28 Service Masts as Supports
If a service mast is required, this section covers installation requirements, including size, bracing, and grounding.
230.9(A) Clearance from Building Openings
Wires must be kept clear of windows, doors, porches, fire escapes, etc.
230.24 (B) Clearances above finished grade, roofs and platforms. Condition of the Existing Attachment
Is the metal bracket in good condition? Is it securely attached to the house? Is it properly grounded/bonded? Any signs of rust, corrosion, or loose connections would be a red flag.
Accessibility
Is the connection point easily accessible for maintenance and future inspections?
Possible Scenarios and Actions
Utility Approves Existing Attachment AND It Meets NEC
If the utility approves the existing attachment and it fully complies with the NEC (height requirements, condition, grounding, clearances), you might be able to reuse it.
But get the approval in writing from the utility.2. Utility Requires Service Mast
The utility may require a service mast regardless of whether the existing setup technically meets code. This is common to ensure standardization, ease of maintenance, and future upgrades. If this is the case, you
must install a service mast. Follow the utility's specifications and the NEC.3. Existing Attachment is Defective/Non-Compliant
If the existing attachment is damaged, not properly grounded, or doesn't meet height/clearance requirements, you
must replace it. In this case, a service mast is often the best solution to ensure compliance and a secure, reliable connection.
Why a Service Mast is Often Preferred
Standardization
Utilities often prefer service masts because they provide a consistent and predictable attachment point.
Security
A properly installed service mast is generally a more robust and reliable support than a bracket attached to the house's siding/eave.
Clearance
Service masts easily achieve the required height clearances.
Easier Maintenance
Masts often provide easier access for utility workers.*
Upgrades
A mast can accommodate larger service conductors for future upgrades more easily.
In summary, the steps to take are
Contact the Local Utility Company
Discuss your project with them, explain the existing setup, and ask for their specific requirements. Get their approval in writing if they allow you to reuse the existing attachment.2.
Thoroughly Inspect the Existing Attachment
If the utility is open to reusing it, carefully inspect it for any signs of damage or corrosion. Make sure it's securely attached and properly grounded.3.
Ensure NEC Compliance
Even with utility approval, make sure the setup meets all relevant NEC requirements (height, clearances, grounding, etc.).4.
Install a Service Mast (If Required)
If the utility requires a service mast or the existing attachment is unsuitable, install a mast according to the utility's specifications and the NEC.5.
Document Everything
Keep records of your communication with the utility, inspection reports, and any code compliance assessments.
Important Disclaimer: I am an AI chatbot and cannot provide professional electrical advice. This information is for general guidance only. Consult with a licensed and qualified electrician to ensure your installation meets all applicable codes and regulations. Failure to do so could result in safety hazards, code violations, and potential liability. Flag for review