Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: Elbow

User: Alwayslearningelec, Location: NJ

Asked on: Friday, August 16, 2024 at 10:33 am EDT
Answered on: Thursday, March 6, 2025 at 1:16 am EST

Question: Guys this is a run on the roof. It's threaded RMC with factory elbows. Wouldnt I only need a coupling and cut and thread on the pipe that meets ONLY ON THE ONE END OF THE ELBOW if the conduit run needs to to turn and end not with a full length. The other side of the elbow I could start with a full length of conduit that already has a coupling. Yes?

Okay, let's break this down to make sure we're on the same page. You're dealing with a run of Rigid Metal Conduit (RMC) on a roof, using factory elbows for changes in direction. Your question is about how to efficiently connect sections of conduit together, especially when you need to end a run at an elbow and don't want to waste material.

Here's a confirmation and clarification of your understanding



Yes, you are correct.
If you're ending a conduit run directly at an elbow (meaning there's no more conduit going straight after the elbow), you would typically only need to cut and thread one end of the conduit section that connects to that elbow. Reasoning



Factory Elbows Are Already Threaded

Factory RMC elbows come with threaded hubs on both ends. You can screw directly into them.


Starting Point

If you're starting with a full length of conduit connected to an elbow, you can use a full length that has threads and coupling.

Example Scenario to Illustrate

Imagine you're running conduit across a roof and need to make a 90-degree turn to go down a wall:1.

Starting Run

You start with a full length of RMC, coupling, and a section of threaded pipe. You thread one end of that pipe into the first coupling of your roof run.2.

Coming to the Elbow

You approach the point where you need to turn. You need to connect the conduit to the 90-degree elbow. Cut the RMC to length. Thread one end of the pipe. The threaded pipe can then be screwed into the threaded hub of the elbow.3.

Continuing Down the Wall

You want to connect from the elbow straight into a full length section of conduit. Use a full length section of conduit that already has threads and a coupling.

Important Considerations and Best Practices



Measurements are Critical

Accurate measurements are
absolutely essential when cutting conduit, especially when working with factory elbows. A slight error can throw off the entire run and require you to re-cut or re-thread. It's better to cut slightly long and then trim to the exact length.

Threading Quality

When threading RMC, use a good quality pipe threader and cutting oil. A clean, well-formed thread is crucial for a secure and watertight connection.

Deburr and Ream

After cutting and threading,
always deburr and ream the inside of the conduit. This removes sharp edges that can damage wires when pulling them through.

Tightening

Ensure all threaded connections are properly tightened. Use a pipe wrench, but avoid over-tightening, which can damage the threads.*

Weatherproofing (if needed)

Depending on the location and the type of connectors you are using, you may need to use thread sealant or tape to ensure a weatherproof connection.

In summary, your understanding of how to efficiently use factory elbows with RMC is correct.
You only need to cut and thread the end of the conduit that's directly terminating into the elbow, saving you time and material.Good luck with your conduit run! Flag for review

Previous Question Next Question