Question: Hello everyone,Thank you for having me here. I'm having a power upgrade done on my shop and I have been tasked with finding the meter panel. The POCo has given me their requirements as being a ring-type panel with bypass. It is single phase 600 amp. I cannot find a panel that is 600 amp with ring and bypass. We were originally going to install a "dual 400" but after months of communication with the engineer at the POCo, he emails me to inform that "after speaking with the meter shop, and researching NEC" we cannot install two panels on the building and I cannot have 800 amp without going to 3-phase, which is two miles away.Does this all sound correct?I'm having a hard time taking his word, and my electrician is not available at the moment.Does anyone know of a manufacturer of a 600 amp ring-type panel with bypass?Is it possible to have one custom made by Eaton or Milbank?Any suggestions would be appreciated.Thanks.
Okay, let's break down your situation and address your questions. This is a common problem with power upgrades, and it's good you're doing your research.
Is the POCO's Information Correct? "Cannot install two panels on the building...": This is highly dependent on local regulations and the POCO's (Power Company) specific rules. The NEC (National Electrical Code) does allow for multiple service disconnects under certain conditions (see NEC 230.2), but the POCO has the final say on how they will connect to your service. It's possible their infrastructure simply isn't set up to handle two separate single-phase services on one property. "...cannot have 800 amp without going to 3-phase.": This is also likely a POCO policy. They may not have the single-phase transformer capacity available near your location to provide 800 amps. Upgrading to 3-phase would allow them to balance the load across three phases, making it easier for them to supply the power. The 'Ring-Type Panel with Bypass' Request
This is where things get a little more complex. The "ring-type" refers to how the meter connects to the service conductors. The "bypass" is critical; it allows the POCO to remove and test the meter without interrupting power to your building.
NEC Consideration
You should also consider the NEC requirements for service equipment, especially the requirements for service disconnects and overcurrent protection. Ensure your electrician is familiar with these sections of the NEC and any local amendments.
Finding a 600 Amp Ring-Type Panel with Bypass
This is where your challenge lies. 600A single-phase ringless meter main panels with a built-in bypass switch are uncommon but not impossible to find. They're not "off-the-shelf" items at most electrical supply houses. Here's what to do:1.
Clarify with the POCO
Specifically ask the POCO for a list of pre-approved manufacturers and models. They likely have a specific list of equipment they've already vetted and know will work with their metering system. Ask for a written list, not just a verbal confirmation.2.
Contact Manufacturers Directly
Even without the POCO's list, contact these manufacturers:
Eaton/Cutler-Hammer
They offer custom solutions. Explain your requirements clearly (600A, single-phase, ring-type, with bypass) and ask if they can build a custom meter enclosure for you.
Milbank
They are a major player in meter enclosures. While they may not have a standard 600A single-phase ringless with bypass, they may have options that can be modified or custom-built.
Siemens
Like Eaton and Milbank, they have custom engineering divisions.
Square D
They are another manufacturer of electrical distribution equipment.
GE
They are another option that may be able to manufacture a custom meter enclosure.3.
Look for "Meter Mains" or "All-in-One" Service Entrance Devices
These are often combined panels that contain the meter socket, main breaker, and distribution section in a single enclosure. You might find one close to your requirements that could be adapted.4.
Custom Fabrication
As a last resort, a reputable UL-listed panel shop can custom fabricate a meter enclosure to your specifications. This is usually the most expensive option.
Custom Made by Eaton or Milbank? Yes, it's definitely possible. Both Eaton and Milbank (and other major manufacturers) have engineering departments that specialize in custom-built electrical equipment. Expect a longer lead time and higher cost compared to standard products. Be prepared to provide detailed specifications and drawings.
Important Considerations
Cost
Upgrading electrical service can be very expensive. A 3-phase upgrade will involve the POCO, electricians, permits, and potentially significant trenching costs. Getting a custom-built meter panel will also be expensive. Get multiple quotes from different electricians and manufacturers.
Permits and Inspections
Ensure that your electrician obtains all necessary permits and that the installation is inspected by the local authorities.
Future Needs
Consider your future power needs. Is 600 amps sufficient, or might you need more in the future? If you anticipate growth, it might be worth exploring the 3-phase option, even if it's more expensive upfront.
Consult with a Qualified Electrical Engineer
It's essential to have a qualified electrical engineer review your power requirements and design the appropriate service entrance equipment. They can help you navigate the NEC and POCO regulations.*
Get Everything in Writing
Insist on written communication from the POCO, including detailed specifications for the meter panel and the reasons why they won't allow dual panels or an 800-amp single-phase service.
Summary of Recommendations
Prioritize communication with the POCO
Get a written list of approved meter panel manufacturers and models.2.
Contact manufacturers
Reach out to Eaton, Milbank, Siemens, Square D, and GE and explain your requirements.3.
Explore "All-in-One" solutions
Look for meter mains or service entrance devices that might be adaptable.4.
Consider a custom panel shop
As a last resort, get a quote for a custom-fabricated meter enclosure.5.
Get an electrical engineer involved
Ensure your design meets all codes and regulations.6.
Weigh the costs
Carefully compare the costs of different options, including a 3-phase upgrade.7.
Get it in writing: Document all communications with the POCO.Good luck with your power upgrade! It can be a frustrating process, but with careful planning and communication, you can get the power you need for your shop. Flag for review