User: ISpud, Location: Prudhoe Bay, AK
Asked on: Friday, August 23, 2024 at 8:58 pm EDT
Answered on: Thursday, March 6, 2025 at 1:35 am EST
Question: Where can I find the required or minimum distance between Deltec tie-downs for DLO cable 500MCM in a ladder type cable tray? The manufacture specs aren't very specific and the NEC dosn't mention it at all.
You're right, the NEC doesn't specifically address the spacing of tie-downs for DLO cable in ladder-type cable tray. And, as you've found, manufacturers' specs can be vague. This often puts the onus on the installer and the authority having jurisdiction (AHJ) to determine what's considered "good workmanship" and ensures cable support and protection.Here's a breakdown of how to approach this, combining best practices and considerations
1. Understanding the Goal:
Secure Support
The primary goal is to prevent the cable from sagging excessively between the cable tray rungs. Excessive sag can strain the cable, potentially damaging the insulation or conductors.
Prevent Movement
Tie-downs should minimize cable movement within the tray, preventing chafing or abrasion, especially in areas with vibration.
Prevent Exceeding Bend Radius
The tie-downs shouldn't force the cable to bend beyond its minimum bend radius (provided by the cable manufacturer).
Ease of Installation/Maintenance
The tie-down method shouldn't make future installation or maintenance significantly more difficult.
2. General Guidelines and Best Practices
Rule of Thumb
A common starting point for support intervals, especially in the absence of specific manufacturer guidance, is
every 3 to 5 feet (0.9 to 1.5 meters). This is a good balance between support and cost-effectiveness. However, 5 feet is often pushing it, especially with heavier 500 MCM DLO. Consider Cable Weight
500 MCM DLO is heavy! The heavier the cable, the more support it will require. You might need to reduce the spacing to 2-3 feet for 500 MCM to prevent noticeable sag.
Horizontal vs. Vertical Runs
Vertical cable tray runs generally require more support. Consider closer spacing (e.g., every 1-2 feet) to prevent the weight of the cable from pulling down on the supports and stressing the cable.
Bends and Terminations
Always provide support immediately before and after any bends, terminations, or splices. This reduces stress on these critical areas. Within 12 inches on either side is a good starting point.
Cable Tray Load Rating
Ensure that the cable tray itself is rated to support the weight of the cables, considering the support spacing. Don't overload the tray.
3. Specific Tie-Down Methods and Considerations
Cable Ties (Nylon or UV-Resistant)
These are the most common. Use heavy-duty, UV-resistant cable ties (if exposed to sunlight). Ensure they are rated for the cable's diameter and weight. Use multiple ties side-by-side for extra security, especially for larger cables. Be careful not to overtighten, which can damage the cable insulation.
Cable Cleats/Clamps
These offer a more secure hold than cable ties and are often made of metal or UV-resistant plastic. They're a good choice for heavy cables or environments with vibration. Be sure to select the correct size for the cable.
Cable Saddles
These provide a cradle-like support for the cable and are particularly good for preventing flattening of the cable.
Material Compatibility
Make sure the tie-down material is compatible with the DLO cable's insulation. Some materials can react with the insulation over time.
Rounded Edges
Ensure that any tie-down hardware has rounded edges to prevent abrasion to the cable insulation.
4. Key Questions to Ask Yourself and Considerations for the AHJ
Environmental Factors
Temperature
Extreme temperatures can affect the properties of tie-downs (especially plastic ties).
Sunlight
UV exposure degrades many plastic materials.
Vibration
If the cable tray is subject to vibration, use more robust tie-down methods and closer spacing.
Chemical Exposure
Is the area exposed to chemicals that could degrade the tie-downs or the cable insulation?
Accessibility for Inspection
Are the tie-downs easily visible for inspection?
Future Cable Additions
Consider the potential for adding more cables to the tray in the future. Leave adequate space and plan your tie-down locations accordingly.
5. Working with the AHJ
Communicate
Before you start the installation, discuss your proposed tie-down methods and spacing with the AHJ. This can save you time and money in the long run.
Document
Keep records of the cable type, size, manufacturer, cable tray manufacturer, and the tie-down method and spacing used. This documentation can be helpful during inspections and for future maintenance.
Err on the Side of Caution
When in doubt, it's always better to provide more support than less.
Example Scenario
Let's say you're installing 500 MCM DLO cable in a horizontal ladder-type cable tray in an industrial environment with moderate vibration.1.
Start with 3-foot spacing
This provides good support for the weight of the cable.2.
Use heavy-duty, UV-resistant cable ties
Secure the cable to the tray using multiple ties side-by-side at each support point.3.
Support immediately before and after bends
Place tie-downs within 12 inches of any bends.4.
Check for sag
After installing a section of cable, visually inspect it for excessive sag between the supports. If there's noticeable sag, reduce the spacing to 2 feet.5.
Consult with the AHJ
Discuss your installation plan with the AHJ to ensure it meets their requirements.
In summary, while there's no hard-and-fast rule in the NEC, using a combination of common sense, industry best practices, and communication with the AHJ will result in a safe and reliable cable tray installation. Remember to always prioritize the protection and support of the cable. Flag for review