User: Alwayslearningelec, Location: NJ
Asked on: Monday, August 26, 2024 at 1:34 pm EDT
Answered on: Thursday, March 6, 2025 at 1:41 am EST
Question: I understand how 4" box and conduit is run within a block wall but what about if the wall is cast in place concrete. Could the box and conduit be run within the pour or it WOULD HAVE to be surface mounted? If it could be run within the wall how would it be supported so it wouldn't shift during the pour
You're right to ask about the difference between block wall and cast-in-place concrete for electrical installations. Here's the breakdown
Can You Embed Electrical Boxes and Conduit in Cast-in-Place Concrete?
Yes, absolutely. It's common and often preferred to embed electrical boxes and conduit within cast-in-place concrete walls, slabs, and ceilings. This provides a clean, flush finish and protects the wiring.
Challenges and Considerations
Planning is Paramount
Before the pour, you must precisely plan the location of all boxes and conduit runs. Changes after the concrete is poured are extremely difficult and expensive.
Proper Materials
Use materials rated for concrete encasement. This usually means:
PVC Conduit (Schedule 40 or Schedule 80)
PVC is common due to its low cost, ease of bending, and resistance to corrosion. Use concrete-tight fittings and couplings.
Important
Schedule 80 is recommended for runs within concrete that will be heavily trafficked or subject to physical impact.
Rigid Metal Conduit (RMC)
Provides superior protection. This is often required for high-voltage or critical circuits. RMC must be treated for corrosion resistance (galvanized or coated).
Galvanized Steel Boxes
Use boxes specifically designed for concrete encasement. These are typically galvanized to resist corrosion.
Liquidtight Flexible Metal Conduit (LFMC)
Can be embedded, but use it sparingly.
EMT conduit
Should not be embedded due to thin walls.
Sealing
All connections and entries into boxes and conduit must be sealed to prevent concrete slurry from entering. Use duct tape, electrical tape, or specialized sealing compounds.
Support and Securing Methods
This is where the key difference lies compared to block wall installations. You need to prevent movement during the pour. Here are some common methods:1.
Wire Ties/Twist Ties
Secure conduit runs to the rebar grid within the forms. Wrap wire ties tightly around the conduit and rebar at frequent intervals (e.g., every 12-18 inches).2.
Concrete Screws
Securely attach boxes to the inside of the formwork. Make sure you will be able to access and remove the screws from the back side after the form is removed.3.
Plastic Saddles/Clips
Plastic saddles that clip onto the rebar can be used to support conduit runs. Some are designed to be embedded within the concrete.4.
Homemade Spacers
Use short pieces of rebar or PVC pipe as spacers to maintain the proper distance between the conduit and the formwork. Wire these spacers in place.5.
Strategic Box Placement
Try to place boxes in areas where the rebar provides natural support.6.
Careful Pouring Technique
Communicate with the concrete crew to request slow and deliberate pouring around electrical installations. Avoid direct impacts from the concrete flow.7.
Form Vibrations
Inform the crew to be careful when vibrating the forms, as this can cause shifting.
Best Practices Coordination
Close communication between the electrical contractor, the concrete contractor, and the structural engineer is essential.
Drawings
Create detailed drawings showing the precise locations of all embedded electrical components.
Inspection
Have the electrical installation inspected before the concrete pour to ensure compliance with codes and specifications.
Overfill Boxes
Temporarily fill the box with something to keep it's form, like crumpled newspaper and then cover with duct tape to keep out the slurry.
Marking
Clearly mark the location of boxes on the formwork's exterior.
When to Surface Mount
While embedding is often desirable, there are times when surface mounting is a better option:
Design Changes
If the design is still evolving or there's a high likelihood of future changes, surface mounting provides more flexibility.
Complex Runs
Extremely complicated conduit runs might be easier to surface mount, especially if they involve numerous bends and offsets.*
Retrofitting
When adding electrical to an existing cast-in-place concrete wall, surface mounting is usually the only practical option.
In summary: Embedding electrical boxes and conduit in cast-in-place concrete is a common and acceptable practice, but it requires careful planning, proper materials, robust support methods, and close coordination with the construction team. Surface mounting is an alternative, especially when flexibility or retrofitting is needed. Always consult with local building codes and a qualified electrical engineer or contractor. Flag for review