Question: We are looking to install a transformer fire barrier between two of our main incoming transformers (34.5 KV to 13.8V) at our substation that feed power to our facility. The fire barrier will be of a concrete masonry unit (CMU) type. There is a single containment for these two transformers and there is a cable tray that runs between the two transformers for protective relay controls. As a result of the tight distances between the transformers and the cable tray, the fire barrier (CMU) will be within 4 feet of the high voltage cables (34.5KV,13.8KV). The CMU will be grounded to the ground grid. The concern we have is that there is not enough distance between the barrier and the overhead transformer power lines and could cause an issue with there being a conductive path from the transformer lines through the fire barrier. Does anyone have any experience with this application and insight into if this setup is approved/allowed within NFPA70 and NFPA850 code?

You've identified a complex issue with several layers. Let's break down the relevant code considerations and potential solutions.

Key NFPA Codes



NFPA 70 (National Electrical Code - NEC)

This covers electrical safety in general, focusing on wiring methods, overcurrent protection, grounding, and clearances. While it might not explicitly address transformer fire barriers in this level of detail, its principles regarding clearances and grounding are crucial. Look under Article 110 (Requirements for Electrical Installations), especially sections on Working Space About Electrical Equipment (110.26 and following) and clearances.


NFPA 850 (Recommended Practice for Fire Protection for Electric Generating Plants and High Voltage Direct Current Converter Stations)

This is the most relevant document for your scenario. It provides recommendations for fire protection, including separation distances, fire barriers, and grounding in electrical substations.

Key Considerations and Code Interpretation


Clearances (NFPA 70 & Application)



Working Space

The NEC (NFPA 70) requires sufficient working space around energized equipment for safe operation and maintenance. Your barrier
could infringe upon this required space if it reduces the room needed to safely work on the transformers. Check the required clearances for 34.5kV and 13.8kV equipment (typically dictated by voltage and equipment type).

Insulation Levels

While the wires themselves are insulated, clearances are still critical. Clearance is a function of voltage level, contamination levels, and risk tolerance.

Induced Voltage / Capacitive Coupling

Even with insulation, close proximity to high-voltage conductors can induce voltage in the grounded CMU barrier. This can be a shock hazard. This is a less common concern but one worth considering.2.

Fire Barrier Design and Grounding (NFPA 850)



Fire Resistance Rating

NFPA 850 specifies requirements for the fire resistance rating of fire barriers. This is primarily about containing a fire, but it indirectly relates to safety.

Grounding of the Barrier

Connecting the CMU barrier to the ground grid is

essential
for safety. A properly grounded barrier will minimize the risk of voltage gradients and touch potential hazards. Ensure the grounding connection is robust and has low impedance. Use a grounding bus running along the CMU wall at the base and grounded at multiple points. Material

The concrete itself, especially when cured, is relatively non-conductive. The main concern is any moisture or contaminants that could reduce insulation strength.3.

Cable Tray Proximity



Clearance to Cable Tray

Check for any specific requirements on the distance between the fire barrier and the cable tray. The NEC might have relevant guidance on cable tray support and separation.4.

Specific NFPA 850 Guidance (Check Latest Edition)

Carefully review NFPA 850 for specific guidance on:


Separation distances between transformers.
While a fire barrier reduces this need, NFPA 850 may still have recommendations. Fire barrier construction details in substations. Grounding requirements for fire barriers and enclosures.5. Risk Assessment and Mitigation



Arc Flash Hazard

Consider the potential for arc flash events. A fire barrier, while protecting against fire spread, could potentially exacerbate an arc flash event if it confines the arc. This will be analyzed in an arc flash study, and appropriate arc flash protection will be in place to help mitigate this concern.


Step and Touch Potential

Perform a step and touch potential analysis to ensure that the grounding system effectively mitigates hazards during fault conditions. This analysis is very important for substations.

Moisture and Contamination

Address potential moisture ingress into the CMU barrier. Seal the top and any penetrations to prevent water absorption.

Recommendations and Steps to Take


Consult a Qualified Electrical Engineer

Engage a Professional Engineer (PE) with experience in substation design and NFPA codes. They can perform a detailed analysis, including clearance verification, grounding studies, and code compliance review.2.

Arc Flash and Grounding Study

If not already done, conduct an arc flash study and a grounding study that specifically considers the presence of the new fire barrier.3.

Clearance Verification

Carefully measure and document all clearances between the high-voltage conductors, the fire barrier, and the cable tray. Compare these measurements to the NEC and NFPA 850 requirements.4.

Grounding Design

Review and enhance the grounding design to ensure the CMU barrier is effectively grounded and minimizes step and touch potential hazards. Multiple grounding points and a low-impedance grounding path are crucial.5.

Consider Alternatives



Relocating the Cable Tray

Is it possible to relocate the cable tray to provide more clearance? This might be the simplest solution.

Thinner Fire Barrier Materials

Explore alternative fire barrier materials that offer the required fire resistance rating but have a smaller physical footprint. Consider fire-rated panel systems.


Forced Air Cooling

Consider utilizing a forced air cooling system to help increase the amount of separation between the two transformers.6.

Authority Having Jurisdiction (AHJ)

Consult with the local AHJ (usually the electrical inspector or fire marshal) to review your design and obtain approval. They may have specific requirements or interpretations of the codes.

Example Concerns and Solutions



Concern

Clearance to 34.5kV conductors is less than the NEC requires for working space.


Solution

Relocate the barrier slightly, use a thinner barrier material, or request a variance from the AHJ (with justification and documentation).

Concern

Induced voltage on the CMU barrier during normal operation.


Solution

Ensure robust grounding, consider shielding (though likely impractical), or increase the clearance.

Concern

Water ingress into the CMU barrier, reducing its insulation strength.


Solution

Seal the top and any penetrations of the CMU wall.

Important Note:
This information is for guidance only and should not be considered a substitute for professional engineering advice. The specific requirements will depend on your site conditions, local codes, and the latest editions of the NFPA standards. Always consult with qualified professionals. Flag for review