Topic: Feeder line from transformer

User: melodynpepper, Location: Maine

Asked on: Friday, August 30, 2024 at 11:26 am EDT
Answered on: Thursday, March 6, 2025 at 1:54 am EST

Question: I bought a 1800 sq.ft. house with a used electrical system from a mobile home. (grrrrrr!) The breaker panel is 100 AMP. I would like to upgrade the whole system to a more proper 200 AMP. Will I need to have the feeder from transformer on hydro pole upsized , or should that be of equal size regardless of wether for a house or mobile home? Thanks for any feedback!

Okay, let's break down upgrading your electrical system to 200 AMP, considering the mobile home electrical system history. Here's a comprehensive look at what you'll likely need to do, and address your feeder question

Understanding the Situation
Mobile Home Electrical Systems

Mobile home electrical systems are often (but not always) designed for lower electrical loads than a standard house of similar size. They may have smaller feeders, panels, and potentially, lower service entrance ratings. The fact that your house is 1800 sq ft makes that 100 amp service seem particularly inadequate.


100 AMP vs. 200 AMP

A 100 AMP service provides less overall power capacity than a 200 AMP service. This can limit the number of appliances you can run simultaneously without tripping breakers, especially with modern electrical demands (central air conditioning, electric vehicles, etc.)

Safety

Upgrading to 200 AMP is generally a good idea for a house that size. It will make the electric system safer.

What Needs to be Done - Step-by-Step
1. Contact a Licensed Electrical Contractor (Absolutely Essential)



Do not attempt this work yourself unless you are a qualified and licensed electrician.
Electrical work is dangerous and can be deadly if done incorrectly. It also requires permits and inspections to ensure it meets local codes. Get multiple quotes from licensed electrical contractors. Explain the situation clearly: the house size, the existing 100 AMP service, the mobile home system history, and your desire to upgrade to 200 AMP. Ask the contractors if they will obtain all necessary permits. Ask if they are familiar with working with your local utility company (hydro company).2. Electrical Load Calculation

The electrician must perform a load calculation based on the actual electrical demands of your house. This takes into account the square footage, appliances, heating/cooling systems, and other electrical loads. This calculation will definitely show a need for 200 amp service.3.

The Service Entrance



Service Entrance Cable (SEC)

This is the cable that runs from your meter to your breaker panel. It
will need to be replaced. 100 AMP service entrance cable is smaller gauge than 200 AMP cable.

Meter Base

The meter base (the box that holds your electric meter) may also need to be replaced to accommodate the larger service entrance cable and potentially a meter rated for higher amperage.

Grounding

The grounding system needs to be properly sized and installed. This is critical for safety.4.

The Breaker Panel

Your existing 100 AMP breaker panel will absolutely need to be replaced with a 200 AMP panel. It's not just about the main breaker; the entire panel and its internal components are designed for a specific amperage rating.5.

The Feeder from the Transformer (Your Question)



This is the most likely part that will need to be upsized.
The wire size from the transformer to the house is based on the amperage rating. A wire suitable for 100 amps is not going to be rated for 200 amps. The electric company (hydro company) determines the size of this wire, and it is their wire. They are the only ones who can touch it. They will evaluate if the existing transformer is adequate to handle the increased load of your upgraded service. If not, they may need to upgrade the transformer as well. The electrician will coordinate with the utility company. They will file the necessary paperwork and schedule the utility company to come out and connect the new service entrance to the transformer. Cost

Be prepared that the utility company may charge a fee for upgrading the feeder and/or transformer. This can vary widely depending on your location and the complexity of the work.6.

Wiring in the House

Most of your existing branch circuits (the wiring running to outlets, lights, and appliances) will likely be fine. However, the electrician will need to ensure that any circuits serving high-demand appliances (electric stoves, water heaters, etc.) are properly sized for their loads. They may need to upgrade some of these circuits with heavier gauge wire. It's a good opportunity to add more circuits for convenience and to distribute the load better.7.

Permits and Inspections

Your electrical contractor must obtain the necessary permits from your local building department before starting any work. Once the work is complete, the electrical inspector will inspect the installation to ensure it meets code. Do not skip this step.
Cost Considerations
Upgrading to 200 AMP service can be a significant expense. Costs vary widely depending on your location, the complexity of the job, and the electrician you choose. Expect to pay several thousand dollars (USD/CAD or equivalent). Get multiple quotes and compare them carefully. Make sure the quotes include all necessary work, permits, and inspections. Factor in potential costs from the utility company for upgrading the feeder or transformer.

In summary:

You absolutely need to consult a licensed electrician for this project. They will determine the correct size of the feeder from the transformer, and handle all the coordination with the utility company. The electrical contractor will be able to assess the situation and give you a clear plan for upgrading your electrical system. Don't attempt this yourself – it's too dangerous and requires specialized knowledge and equipment! Flag for review