User: darekelec, Location: nyc
Asked on: Wednesday, September 4, 2024 at 9:47 pm EDT
Answered on: Thursday, March 6, 2025 at 2:03 am EST
Question: Does service equipment have to be installed on raised concrete pedestal in nyc ?Service 2500 Amps.Perhaps coned requirement or installation manual ?I think it’s nog a nec requirement.
You are correct, the NEC (National Electrical Code) does not explicitly require service equipment (like a 2500A switchgear) to be installed on a raised concrete pedestal in all cases.However, in NYC, for a service of that size, it is highly likely that Con Edison (ConEd) will require a raised concrete pedestal.
Here's a breakdown of why and where to look for the requirement: Con Edison Requirements (Most Likely Source)
ConEd has specific requirements for the installation of service equipment, especially for large services like 2500A. These requirements often exceed the minimum NEC standards.
Con Edison "Green Book" (Electrical Service Requirements)
This is the primary document you need to consult. The specific sections dealing with switchgear and service equipment installation will likely address the pedestal requirement. Look for sections related to: Substation Requirements Service Switchgear Grounding and Bonding Clearance Requirements
Con Edison Inspections and Approvals
Even if not explicitly stated in the Green Book, ConEd inspectors have the authority to require specific installation methods during the approval process. A raised pedestal might be mandated for specific site conditions or to meet their overall safety and reliability standards.
Why a Pedestal Might be Required (Common Reasons)
Flood Zone Protection
NYC has areas prone to flooding. A pedestal raises the equipment above potential flood levels, protecting it from water damage.
Physical Protection
The pedestal protects the equipment from accidental damage from vehicles, equipment, or debris.
Clearance and Access
The pedestal can provide adequate clearance for working space around the equipment as required by NEC 110.26 and facilitate easier maintenance and inspection.
Grounding
The pedestal can provide a stable platform for grounding connections.
ConEd Standard Practice
ConEd might simply have a standard practice of requiring pedestals for large services to ensure consistent and reliable installations throughout their system.
NEC Considerations (Generally Not the Primary Driver Here)
While the NEC doesn't mandate pedestals universally, it does require equipment to be installed in a suitable environment (NEC 110.11), protected from physical damage (NEC 110.27), and to provide adequate working space (NEC 110.26). A pedestal might be one way to meet these requirements.
How to Confirm the Requirement
Consult the Con Edison "Green Book" (Electrical Service Requirements)
Download the latest version from the ConEd website or obtain a copy from your electrical contractor. Carefully* review the sections pertaining to service switchgear and substation requirements.2.
Speak with Your Electrical Contractor
A licensed electrical contractor with experience in NYC and with ConEd projects will be familiar with their requirements and local practices.3.
Contact Con Edison Directly
Contact ConEd's engineering or customer service department. Inquire about the specific requirements for a 2500A service at your location. They may be able to provide guidance or clarify any ambiguities in the Green Book. Have the specific address of the installation when you contact them.4.
Review Approved Plans
If you have already submitted plans for your project, review the approved drawings. The pedestal requirement might be noted on the approved plans.
In Summary
While the NEC alone doesn't mandate a raised concrete pedestal,
Con Edison almost certainly will for a 2500A service in NYC. Your most important step is to consult the ConEd "Green Book" and communicate with ConEd directly or through your electrical contractor to confirm their specific requirements for your project. Flag for review