Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: 600 amp 1Ph CT mounting base help

User: Tyler55, Location: Glenwood, NM

Asked on: Thursday, September 5, 2024 at 8:00 pm EDT
Answered on: Thursday, March 6, 2025 at 2:06 am EST

Question: Hello,First off, this forum is a great resource, a thank you to all of you for sharing your knowledge.I've been tasked with sourcing a CT cabinet for my power upgrade on my shop and am having trouble finding a buss or mounting base that is rated for 600amp single-phase. I have found one that says it is 401-800 amp. I am looking for an off the shelf option. I believe I can have one made, however the lead time is 47 weeks and I would like to explore any other options before ordering. The catalog number for the specific CT rack is K4795 from MIlbank page 22.https://www.milbankworks.com/getmedia/7feb57a9-d88c-4fdf-8386-6a117f53534a/instrument-rated.pdf

You're welcome! It's great to hear you find the forum helpful. Sourcing CT cabinets and components can definitely be tricky. Here's a breakdown of why you're likely having trouble and potential solutions

Why it's Difficult:
Standardization vs. Customization

600A single-phase CT cabinets are right in that "gray" area. They're large enough that they often don't fall into the readily available residential-type stock, but not quite large enough to be a huge volume item that every supplier carries in abundance. They are kind of a in between size.


Specific Requirements

Your power company likely has very specific requirements for the CT cabinet's construction, certifications, and metering socket. Those requirements are often unique to the utility.

Inventory Levels

Like many things right now, inventory levels are still fluctuating, and lead times can be extended.

What to Consider & Potential Solutions
1. Verify Utility Requirements



Call the Power Company Directly

This is the most important step. Get a detailed list of approved manufacturers and models of CT cabinets for your specific service size and application. Ask if they have a list of "approved vendors" who frequently install these cabinets and might have a line on available stock.

Understand the Specifications

Besides the amperage rating, pay close attention to:
Short Circuit Current Rating (SCCR): This is crucial for safety and compliance. NEMA Rating (Enclosure Type): The enclosure has to be rated for the environmental conditions of your shop. Metering Socket Type: Some utilities require specific socket types. Service Entrance Rating: The CT cabinet must be suitable for use as service entrance equipment if that's how it's being used. Clearances: Ensure sufficient space for wiring and maintenance within the cabinet.2.

Explore Other Manufacturers



Eaton

Eaton offers a wide range of metering equipment, including CT cabinets and sockets. Look at their cutler hammer series.


Siemens

Siemens is another major player in electrical equipment. Search for their metering solutions.

ABB

ABB's metering solutions are generally high-quality.


GE/Schneider Electric

Check with Schneider Electric as well (they acquired GE's Industrial Solutions business).

Local Electrical Suppliers

Talk to your local electrical supply houses (the larger ones). They often have relationships with manufacturers and distributors and might know of available stock or alternative solutions. Even if they don't have it, they're likely more familiar with local utility requirements.3.

The "401-800A" Rated Rack (Milbank K4795)



Careful Evaluation

The Milbank K4795 you found might be acceptable. The range 401-800A doesn't mean it's unsuitable for 600A.

Check the Buss Bar Rating

Look closely at the specifications sheet or contact Milbank directly. The critical question is:

What is the continuous current rating of the buss bars?
If the buss bars within that rack are rated for at least 600A, it could be a viable option. Also, verify it has the correct CT ratio for your metering. Consult an Engineer

I highly recommend having a licensed electrical engineer review the specifications of the Milbank K4795 and your utility's requirements. They can confirm if it's code-compliant and suitable for your application. You do not want to install something that's not compliant, as that could lead to rejection and delays.4.

Modifying an Existing Cabinet (Proceed with extreme caution)



Only as a last resort
modifying a smaller cabinet could allow you to place a larger buss inside of it. This MUST be rated by an electrical engineer and the cabinet will need to be rated again after modifications.

Important Considerations



NEC Compliance

Ensure all equipment and installation methods adhere to the National Electrical Code (NEC) and any local electrical codes.

Qualified Electrician

Hire a licensed and experienced electrician to install the CT cabinet and wiring. They are familiar with local codes and utility requirements and can ensure a safe and compliant installation.


Permitting and Inspection:
Obtain the necessary electrical permits and schedule inspections with your local authorities.Good luck with your search! Let me know if you have any more questions. Flag for review

Previous Question Next Question