User: Coleflo, Location: Albany, GA, USA
Asked on: Sunday, September 15, 2024 at 11:31 pm EDT
Answered on: Thursday, March 6, 2025 at 2:29 am EST
Question: I am sure something similar has been covered here before. Myself and a couple of others recently started a small business. We have mainly been doing service work and are about to start doing residential new construction. The estimating process has fallen on me. I have a general idea of where we need to be when pricing by the sq ft. The main builder we plan to do work for is one of the big builders that is all across the country. They require a Sq ft price that includes most of the bare minimum stuff. After that they require unit pricing on serval different items ranging from the service, to a tv drop, to bath fans, to a fireplace fan blower switch. I am new to estimating and would like some input on how you would calculate your pricing. Thanks for your input
Okay, you've landed a great opportunity, but estimating new residential construction for a big builder can be tricky. Here's a breakdown of how I'd approach it, combining sq ft pricing with detailed unit pricing, and focusing on profitability and accuracy
1. Understanding the Builder's Needs and Expectations:
Detailed Scope of Work
Get absolutely clear on exactly what's included in the base square footage price. This is paramount. Don't make assumptions. Ask for the builder's standard spec sheet, including:
Wiring Specifications
Gauge of wire (e.g., 14/2, 12/2), type of conduit (if any), grounding requirements.
Outlet/Switch Quantity & Placement
How many outlets per room? Location and type of switches (standard, dimmer, etc.). Are there any specific placement codes (e.g., outlets every 12 feet of wall space)?
Lighting Fixture Specifications
Types and locations of recessed lights, ceiling fan boxes (with or without fans), vanity lights, exterior lights. Are they providing the fixtures, or are you?
Panel Size and Location
Main panel amperage, sub-panels (if any).
Grounding System
Specific requirements for grounding electrodes.
Smoke/CO Detectors
Location, type (hardwired, battery backup, interconnected).
Low Voltage
Pre-wiring for phone, data, cable TV. Location and type of jacks.
Appliance Circuits
Dedicated circuits for refrigerator, range, dishwasher, microwave, washer/dryer, etc.
Any Specific Codes or Requirements
Local building codes or builder-specific requirements that go above and beyond.
Review Plans Thoroughly
Even with a spec sheet, carefully review the architectural and electrical plans for each model. Look for discrepancies or anything unusual.
Ask Questions
Don't be afraid to ask questions, especially upfront. It's better to clarify ambiguities before submitting your bid than to deal with costly change orders later.
Warranty Requirements
What are their warranty expectations? How long is the warranty period? This can impact your material choices and labor practices.
Payment Schedule
Understand how they pay and when. This is crucial for your cash flow.
2. Calculating Your Base Square Footage Price
Cost Analysis
This is where you start. Break down every cost associated with the base package.
Materials
Get quotes from your suppliers for all the materials required for a typical house based on the builder's spec sheet. Include wire, boxes, outlets, switches, lighting fixtures (if you're providing them), panel, breakers, conduit, grounding materials, etc. Factor in waste (typically 5-10%).
Labor
Accurately estimate the labor hours required for each task (rough-in, trim, panel installation, etc.). Be realistic. Consider the experience level of your crew. Track your time: Start tracking your time spent on similar jobs to refine your estimates.
Overhead
Calculate your overhead costs (office rent, utilities, insurance, vehicle expenses, salaries for non-billable employees, etc.) on a per-hour or per-job basis.
Profit
Decide on your desired profit margin. This will vary depending on the market and the level of risk involved. A typical profit margin for electrical contractors is 10-20%, but this can vary.
Example
Materials: $3,000 Labor (40 hours @ $60/hour burdened): $2,400 Overhead: $600 Total Cost: $6,000 Desired Profit (15%): $900 Total Price: $6,900
Square Footage Price
Divide the total price by the average square footage of the homes you'll be working on. Example: $6,900 / 2000 sq ft = $3.45 per sq ft
Adjustments
Complexity
Adjust the sq ft price based on the complexity of the electrical system. A house with a lot of custom lighting, smart home features, or unusual wiring requirements will cost more.
Volume
If you're guaranteed a high volume of work, you may be able to offer a slightly lower price.
Market Conditions
Consider the local market. Are there a lot of other electrical contractors bidding for the same work?
3. Calculating Unit Pricing
This is where you price out specific items that are not included in the base square footage price. Be very detailed.
Gather Information
For each unit price item, get specific details:
Product Specifications
Brand, model number, features (e.g., for a ceiling fan, is it remote-controlled? What size?).
Location
Where will the item be installed? This can affect labor time (e.g., installing a TV drop in a finished wall is more difficult than in a new construction wall).
Materials Required
What additional materials will you need to install this item (e.g., wire, connectors, mounting brackets, boxes)?
Cost Analysis
Again, break down all costs:
Materials
Get accurate pricing for the specific product and any associated materials.
Labor
Estimate the labor hours required for installation. Be realistic.
Overhead
Allocate a portion of your overhead to each unit price item.
Profit
Add your desired profit margin.
Example: TV Drop (Including outlet, low-voltage cable, and wall plate) Materials (Outlet, Box, Cable, Plate): $25 Labor (1 hour @ $60/hour burdened): $60 Overhead: $10 Total Cost: $95 Desired Profit (15%): $14.25 Unit Price: $109.25 Tips for Unit Pricing
Be Specific
The more specific you are, the less room there is for misunderstanding and costly change orders.
Document Everything
Keep a record of your unit price calculations and the assumptions you made.
Review Regularly
Review your unit prices regularly to ensure they are accurate and profitable. Material prices can fluctuate.
Consider Upselling
While sticking to the builder's requirements, identify opportunities to upsell to homeowners (e.g., upgraded lighting fixtures, smart home features).
4. Submitting Your Bid
Be Professional
Present your bid in a clear, concise, and professional manner.
Include All Necessary Information
Make sure your bid includes the base square footage price, the unit prices, any exclusions, and your contact information.
Review Carefully
Before submitting your bid, review it carefully to ensure there are no errors or omissions.
Follow Up
Follow up with the builder to answer any questions they may have.
Important Considerations
Change Orders
Establish a clear process for handling change orders. Get all change orders in writing and approved before starting the work. Price them fairly and consistently.
Scheduling
Coordinate your work with the builder's schedule. Delays can be costly.
Communication
Maintain open communication with the builder throughout the project. Address any issues promptly and professionally.
Quality Control
Ensure your work meets the highest standards of quality. This will help you avoid callbacks and maintain a good reputation.
Insurance
Ensure you have adequate insurance coverage, including general liability, workers' compensation, and auto insurance.
Licensing
Make sure you are properly licensed and permitted to perform electrical work in the area.
Bonding
Determine if you need to be bonded.
Tools and Resources
Estimating Software
Consider using estimating software to streamline the estimating process. There are many options available, ranging from simple spreadsheets to sophisticated software packages.
Supplier Catalogs and Websites
Use supplier catalogs and websites to get accurate pricing on materials.
Industry Associations
Join industry associations such as the Independent Electrical Contractors (IEC) or the National Electrical Contractors Association (NECA). These organizations offer training, resources, and networking opportunities.
Cost Data
Consider purchasing cost data from companies like RSMeans. This data can help you estimate the cost of labor and materials in your area.
Key to Success
Accuracy
The more accurate your estimates, the more profitable you will be.
Consistency
Use a consistent estimating process for all projects.
Attention to Detail
Pay attention to detail and don't make assumptions.*
Continuous Improvement: Continuously review your estimating process and look for ways to improve it.By following these steps, you can develop accurate and profitable estimates for new residential construction and build a successful relationship with the builder. Good luck! Flag for review