User: a larky, Location: Las Vegas
Asked on: Monday, September 16, 2024 at 6:23 pm EDT
Answered on: Thursday, March 6, 2025 at 2:32 am EST
Question: I have a building that was previously two parcels but has since been combined into one single address and tenant. There are (2) existing 200A, 120/240V, 1PH services (1 on each side) and we are currently proposing to add an additional 800A, 480V, 3PH service. This additional service would typically be allowed under NEC 230.2 (D), but the AHJ is stating the already existing 200A services need to be brought into compliance and we cannot have 3 services. How does this work with the code if we have a building that falls under 2 APN's which already have these 200A services existing?
This is a tricky situation that requires careful navigation of the NEC and local AHJ interpretations. Here's a breakdown of how the code applies, how to approach the AHJ, and factors to consider
NEC Relevant Sections:
NEC 230.2(D) (More than One Building or Other Structure)
This is the section you're relying on for allowing multiple services. It states you can have multiple services where "more than one building or other structure is under single management." The AHJ is seemingly overlooking the previous two parcel status.
NEC 230.2(E) (Different Characteristics)
While less directly applicable in this scenario, it allows for an additional service for different voltage, frequency, or phase characteristics. However, the AHJ's objection likely precedes this.
NEC 230.21 (Number of Services)
Generally allows only one service. The exception you're trying to use is 230.2(D).
NEC 230.28 (Service Overcurrent Protection)
This section, and others in Article 230, apply to each service and are relevant if you have multiple services. Your AHJ likely wants to ensure existing services are brought up to current standards of Article 230 if they're adding a new one.
NEC Article 100 (Definitions)
The definitions of "Building" and "Structure" are critical. The AHJ may be arguing the combined building is now one structure.
Understanding the AHJ's Concerns
The AHJ's position likely stems from these concerns:1. Safety/Compliance of Existing Services
The AHJ may fear the existing 200A services are outdated, potentially unsafe, or not code-compliant with current NEC editions. They may be using the new service as an opportunity to address these concerns, even if the existing services are grandfathered.2.
Simplification/Management
They prefer a single, modern service for easier management, maintenance, and potential future upgrades. Having multiple services complicates things.3.
"One Building" Argument
They may be interpreting the combination into a single address and tenant as a single building under the NEC's definition, negating the allowance under 230.2(D).
Recommended Approach1. Documentation is Key
Official Parcel Map/Record
Obtain an official document from the local county/municipality showing the historical parcel lines before the combination. This is the most powerful evidence to support your 230.2(D) argument.
Historical Records
Gather any historical permits, inspections, or approvals related to the original 200A services. This can help demonstrate they were installed legally and up to code at the time.
Written Statement
Prepare a detailed, written explanation outlining: The history of the building and the two parcels. That the 200A services pre-date the building combination. That the existing services were legally installed and compliant at the time. How the new 800A service meets all current code requirements. Why removing/upgrading the 200A services is not feasible or cost-effective (if applicable). Be truthful about the impact on operations. How the two existing services are completely separate and don't require combining with the new service.2.
Meet with the AHJ
Schedule a Meeting
Don't just rely on phone calls or emails. Arrange a face-to-face meeting with the AHJ and the electrical inspector.
Present Your Case Clearly
Present your documentation and argument calmly and respectfully. Focus on the historical context of the two services.
Understand Their Concerns
Actively listen to the AHJ's concerns. Try to address them directly with code references or practical explanations.
Negotiate
Be prepared to compromise. Could you agree to upgrade specific aspects of the existing services (e.g., grounding, overcurrent protection) without completely replacing them?3.
Legal Consultation (If Necessary)
If you cannot reach an agreement with the AHJ, consider consulting with an attorney specializing in construction law or electrical codes. They can provide a legal opinion on the interpretation of the NEC in your situation.
Possible Arguments and Counterarguments Your Argument
The building was two separate parcels, each with its own service, before being combined. NEC 230.2(D) allows for this. You are not adding a service to a building that already has the maximum allowed; you are adding a service to a building that historically had two services and is now adding a third for a new, significant load.
AHJ's Counterargument
The building is now one building/structure, regardless of its history. The code should be applied based on the current state.
Your Rebuttal
The code doesn't explicitly state that previously existing, legal services must be removed when two parcels are combined. Removing or significantly altering existing services can be costly and disruptive, and there is no safety hazard from keeping them. You could argue that the building is operating as intended.
AHJ's Rebuttal
The AHJ may cite their local amendments or policies that supersede the national code or state that their interpretation of the code is that all services need to be compliant.
Specific Actions to Consider Evaluate the Cost
Get quotes for upgrading or replacing the existing 200A services. Understand the financial impact.
Consider a Load Calculation
Perform a load calculation for the entire building, including the existing and proposed loads. This might demonstrate that the existing services are still necessary and within their capacity.
Explore Alternatives
Service Upgrade Only
If the existing services are truly undersized, is it possible to upgrade them instead of adding a new 800A service? This might be more palatable to the AHJ.
Shared Metering/Submetering
Can the tenant handle a single point of service with internal submetering?
Seek a Variance
If you've exhausted all other options, you might need to apply for a variance from the code. This is a formal request for an exception, which requires a compelling justification.
Important Considerations
Local Amendments
Check for any local amendments to the NEC. Some jurisdictions have stricter rules about the number of services allowed.*
AHJ Discretion: Ultimately, the AHJ has significant discretion in interpreting the code. Building a good relationship and presenting a well-reasoned case is crucial.This is a complex issue. While NEC 230.2(D) seems to support your position, the AHJ's interpretation and concerns are valid. A collaborative approach, with strong documentation and a willingness to negotiate, is your best strategy. Good luck! Flag for review