Question: I am building a 600 amp service. About to install the disconnect. The picture shows a rudimentary sketch of its intended installation. Two 3 inch pvc conduits will run between the CT cabinet and the disconnect housing the feeders that run in and out of the disconnect. (thats the meter in the middle). My question is, after the feeders exit the disconnect can they re_enter the CT cabinet? Then proceed through the back of the CT cabinet to enter the panels??

Okay, let's break this down and make sure you're compliant with the NEC (National Electrical Code) and common utility practices. A picture would be a great help but I understand its a rudimentary sketch.

Understanding Your Setup (Based on Your Description)



CT Cabinet

This is the enclosure housing your current transformers. It's typically installed by or under the supervision of the utility company.


Disconnect

Your main disconnect switch, rated for 600 amps.

Feeders

The large conductors (likely multiple conductors in parallel per phase) carrying the 600 amp service.


PVC Conduits

Two 3-inch PVC conduits connecting the CT cabinet and the disconnect.

Panels

Your distribution panels that will feed individual circuits.

The Core Question: Re-entry into CT Cabinet?


Your question boils down to whether you can run the feeders
out of the disconnect and then back into the CT cabinet before routing them to your panels.

Generally, the answer is a strong
NO, with a few very specific and rare exceptions. Here's why:1. NEC 230.70(A)(1) Location

The service disconnecting means should be readily accessible and located at a readily accessible point nearest the point of entrance of the service conductors. While "nearest" is subject to interpretation, routing conductors in this way is generally not considered the nearest point, and inspectors are likely to push back, especially if a more direct route exists.2.

NEC 230.44 Splices

Generally, service conductors should not be spliced.3.

Utility Ownership and Control

CT cabinets are typically owned and controlled by the utility company. Your access to and work within the CT cabinet is likely to be restricted and require coordination with the utility. Modifying the CT cabinet, adding penetrations, or re-routing conductors within it
without explicit utility approval is almost certainly a violation of their rules and could create safety hazards.4.

Unnecessary Complexity and Potential for Error

Re-routing the feeders in this way adds unnecessary complexity to the installation. This increases the potential for errors during installation and future maintenance.5.

Working Clearance

The CT cabinet may not be designed to accommodate the bending radius and working space required for your large feeders.

Why do you want to re-enter the CT cabinet?
Understanding your motivation is key. There might be alternative solutions that are code-compliant and acceptable to the utility. Some possible reasons and alternative solutions are: Space Constraints

Is your main panel location immediately on the other side of the CT cabinet? Consider relocating the disconnect to a more accessible and code-compliant location.

Ease of Wiring

Are you trying to simplify the run to multiple panels? Consider using a junction box
after the disconnect to split the feeders to the panels.

Appearance

Are you trying to hide the conduits? Explore alternative conduit routing options that are direct and code-compliant.

Alternative Solutions (Assuming Space Constraints)


Dedicated Junction Box

After the disconnect, install a large, properly sized and rated junction box. Run the feeders from the disconnect into the junction box. Then, run separate sets of feeders from the junction box to each of your panels. Be sure to use appropriate splicing methods (e.g., irreversible compression connectors) and torque to the manufacturer's specifications.2.

Trough or Wireway

Similar to a junction box, a trough or wireway can provide a larger space for running and tapping the feeders.3.

Panel Location Adjustment

If possible, shift the location of the panel slightly to allow a more direct run from the disconnect.4.

Meter-Main Combo

Consider a meter-main combination unit that incorporates both the meter socket and the disconnect in a single enclosure. This can streamline the installation and reduce the number of boxes and conduits.

Critical Steps


Consult with the Utility Company

This is the most important step. Discuss your plans with the utility company before you begin any work. Get their approval for the location of the disconnect and the routing of the conductors. They may have specific requirements or preferred methods. They have the final say regarding connections to their equipment and the meter.2.

Contact your Local Electrical Inspector

Discuss your plans with the local electrical inspector to ensure compliance with the NEC and local codes. Get their feedback before you start the installation.3.

Review the NEC

Carefully review Articles 230 (Services), 250 (Grounding and Bonding), and 310 (Conductors for General Wiring) of the National Electrical Code.

In summary: Re-entering the CT cabinet is almost certainly a violation of code and utility rules. Explore alternative solutions that are code-compliant and approved by both the utility and the local electrical inspector.