User: TCG1, Location: PA
Asked on: Thursday, September 26, 2024 at 8:39 pm EDT
Answered on: Thursday, March 6, 2025 at 3:02 am EST
Question: HelloI wanted to ask about different ways / means or methods to temporarily attach a triplex when changing out a service mast that has the triplex attached to it. No power company involved - triplex is hot , I have just laid it on the ground before but if there are any devices out there that keep it easy to reattach / still in the air ? Maybe an attachment to a bucket truck or a recommended tie off method ?Thanks
Okay, I understand. You're looking for safe and efficient methods to temporarily support a hot triplex service drop while replacing a service mast, without involving the power company to de-energize the line. This is a high-risk situation, and safety is paramount. I must emphasize that working on or near energized power lines is extremely dangerous and should only be performed by qualified and experienced personnel with the proper training, equipment, and procedures. If you are not absolutely certain of your ability to do this safely, you should contact the utility company to de-energize the service.
Here are some methods and considerations
General Safety Precautions (Critical):
PPE (Personal Protective Equipment)
This is non-negotiable. You must wear appropriate PPE, including:
Rubber Gloves
Rated for the voltage you're working with (typically Class 2 or higher for residential services, but verify with your utility). These must be inspected for damage before each use.
Leather Protectors
Wear these over the rubber gloves to prevent punctures and abrasion.
Safety Glasses/Face Shield
Protection against arcs and debris.
Flame-Resistant (FR) Clothing
Important in case of an arc flash.
Hard Hat
With chin strap.
Safety Boots
With non-conductive soles.
Insulation
Ensure all tools and equipment you use are properly insulated and rated for the voltage. This includes tools for cutting, stripping, and securing the triplex.
Two-Person Rule
Never work on energized lines alone. Have a qualified observer who can act in case of an emergency. This person should be trained in rescue techniques.
Communication
Establish clear communication signals with your partner.
Weather
Do not work in wet or stormy conditions.
Keep Clearances
Maintain safe distances from other conductive objects, including yourself and your tools.
De-energize if possible Even though you stated "no power company involved", it is often worth the effort to try to coordinate a temporary outage with the utility. Even a brief shutdown is much safer than working hot.
Methods for Supporting the Triplex
The key is to support the triplex without putting undue stress on the conductors or damaging the insulation.1.
Insulated Temporary Support (Preferred)
Purpose-Built Triplex Support Tool
The safest option is to use a commercial triplex support tool designed for this purpose. These tools often clamp onto the service mast and have insulated arms or cradles to hold the triplex while you work. Look for tools specifically designed for supporting energized service drops. These are not commonly available and may need to be rented or special ordered.
Fiberglass Hot Sticks with Insulated Hooks
Hot sticks, typically used by utility workers, can be adapted. You can use one or two hot sticks with appropriate insulated hooks to lift and support the triplex. Secure the hot sticks to a stable structure or use a bucket truck to position them.
Bucket Truck with Insulated Boom
If you have access to a bucket truck with an insulated boom, this is a good option. Carefully position the boom near the triplex and use insulated slings or supports to hold the conductors. The bucket truck must be properly grounded.2.
Rope and Insulators (Less Desirable, Use with Extreme Caution)
Proper Rope
Use a high-strength, low-stretch rope made of synthetic material (e.g., polyester or nylon) that is not conductive when wet. Inspect the rope for any signs of wear or damage before use.
Insulators
Insert appropriately rated insulators (strain insulators or egg insulators) into the rope support system. These insulators are essential to prevent the rope from becoming energized. Attach the rope to the triplex using insulated grips or clamps, being careful not to damage the conductor insulation.
Tie-Off Points
Secure the rope to strong, stable tie-off points away from the work area. Ensure the tie-off points can handle the weight of the triplex, plus a safety factor.3.
Considerations for All Methods
Sag
Maintain the correct sag in the triplex when you reattach it to the new mast. Too much sag can cause the conductors to droop too low, while too little sag can put excessive stress on the conductors and connections.
Attachment Hardware
Use only approved hardware for attaching the triplex to the service mast. Ensure the hardware is compatible with the conductor type and size.
Grounding
Ensure proper grounding of the service mast.
Re-tensioning
After attaching the triplex to the new mast, double-check the sag and tension. If necessary, make adjustments.
Steps (General Outline)
Planning
Thoroughly plan the job before starting. Identify potential hazards and develop a safe work plan.2.
Inspection
Inspect all equipment and tools before use.3.
Support
Carefully install the temporary support system to hold the triplex.4.
Disconnect
Disconnect the triplex from the old service mast. Use insulated tools and techniques.5.
Remove Old Mast
Remove the old service mast.6.
Install New Mast
Install the new service mast.7.
Reconnect
Reconnect the triplex to the new service mast, ensuring proper connections and tension.8.
Remove Temporary Support
Carefully remove the temporary support system.9.
Inspection
Inspect the completed work to ensure everything is safe and secure.
Important Reminders
This is highly dangerous work. If you are not fully qualified and experienced, do not attempt it. Always prioritize safety. Contact your local utility company to discuss your options. They may be willing to de-energize the service temporarily, which is the safest option.* Follow all applicable electrical codes and regulations.
By utilizing the devices listed above and proper technique this job can be made much safer - I hope this response was helpful and informative - proceed cautiously ! Flag for review