Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: Best MSP for 80A PV?

User: Zee, Location: CA

Asked on: Tuesday, October 1, 2024 at 10:36 pm EDT
Answered on: Thursday, March 6, 2025 at 3:17 am EST

Question: What 200A meter/main combo panel would you spec for an 80A PV system, that also has easy access to place CT coils on the line conductors?(80A PV = 2 @ 7.7 kW inverters)

Okay, specifying a meter/main combo panel for an 80A PV system with easy CT access requires considering a few factors: NEC Requirements

The panel must meet the NEC requirements for PV integration, particularly the 120% rule and the 20% rule regarding breaker placement.


Meter Socket Rating

Must be rated for the continuous current of the service and PV system.

Main Breaker Rating

Must accommodate the calculated load of the house plus the PV system output.


Busbar Rating

Must also accommodate the calculated load of the house plus the PV system output.

PV Breaker Space

Need to have physical space for the PV breaker(s).


CT Access

This is key – you need a panel with ample space around the service entrance conductors for CT clamps. Some panels are just too cramped.

Ease of Installation

Look for features that make wiring easier, like generous wire bending space and clear labeling.

Given your requirements, here are my recommendations, focusing on the most important considerations and keeping in mind that local codes may dictate specific brand preferences



Best Bet: Eaton Meter Mains
Why Eaton? Eaton is the leading manufacturer for metering equipment used by utilities in North America. Their equipment is high quality and is widely available. They have a number of options in their product lineup that include 200A meter/main combo panels that include enough space for proper CT placement.

Important Considerations



120% Rule

Make sure that the panel meets the 120% rule: (Main Breaker Rating + PV Breaker Rating) <= (1.2
Busbar Rating). For example, if you have a 200A busbar, (200A + 80A) <= (1.2 200A) which is 280A <= 240A. The busbar rating would need to be increased or the PV breaker size would need to be reduced to satisfy the 120% rule.

20% Rule

Do not place PV breakers such that they occupy more than 20% of the breakers on one side of the panel.

Local Utility Approval

Always check with your local utility company regarding their specific requirements for meter/main combo panels, including approved manufacturers, CT requirements, and disconnect locations. They may have a pre-approved list. This is critical to avoid delays or rejection of your installation.

Disclaimer:
Always consult with a licensed electrician to ensure that any panel meets your specific site requirements, local codes, and NEC regulations.* This information is for general guidance only. Flag for review

Previous Question Next Question