Question: I have a pole mounted meter/panel combo about 30 feet away from a small utility shed that exists just to house a well pump and pressure tank inside. I need power to to this shed only for the pump motor inside and also would like to bring a branch circuit over for a receptacle and small light for inside. Does this small building need it's own sub panel or can I simply bring 2 circuits over from my panel on the utility pole? Do these branch circuits need a disconnect on or at the building even thought the breaker is within view?Was planning on bringing circuits underground in pvc to the inside of the shed and hitting a junction box. There is another building that will be built in the future that will need it's own sub panel that will also be fed from this meter/panel combo on utility pole, not sure if that's relevant in any way.I mostly do industrial work so this is a little out of my area of expertise but I'm helping a friend out with their project. Any help is appreciated.

Okay, let's break down the requirements for powering your well pump shed and address your questions

1. Do You Need a Subpanel?
No, you don't necessarily need a subpanel if you are only feeding the well pump, a single receptacle, and a single light fixture. The NEC allows you to run multiple circuits from the main panel to a detached structure if the requirements are met.2. Wiring Methods and Grounding Underground Feed

Your plan to run the circuits underground in PVC conduit is a good and standard approach. Make sure to use the appropriate conduit type and fittings for underground burial. You'll need to bury the conduit at the depth specified by your local electrical codes (typically 18" minimum). Use a continuous green or bare copper grounding conductor within the conduit, sized appropriately for the circuit breaker overcurrent protection.

3. Disconnect at the Building
The requirement for a disconnect depends on the number of circuits. If you run only TWO circuits (one for the pump and one for the receptacle/light), a disconnect is NOT required according to NEC 225.31. However, if you were to run a THIRD circuit to the shed for any reason (e.g., dedicated circuit for a heater, second receptacle), then a disconnect would be required at or in the shed. If you plan to have future needs in the shed such as tools with larger motors that need a larger receptacle, then planning for a subpanel would be recommended4. Grounding at the Shed Important

You
do not need to drive a ground rod at the shed

IF
you are providing a grounding conductor from the main panel in the same raceway as the circuit conductors. This is allowed by NEC 250.32(A). This means you run your hot, neutral, and ground wires in the same conduit. The grounding conductor is bonded to the main panel's grounding system, and it will provide the necessary ground fault current path. You should NOT drive a ground rod and connect it to the grounding conductor that runs with the circuit conductors. This creates a parallel ground path, which can lead to circulating currents and potential safety issues.5. GFCI Protection Receptacle

The receptacle in the shed
must be GFCI protected. This can be accomplished either with a GFCI breaker at the main panel or a GFCI receptacle in the shed.

Lighting

GFCI protection is generally not required for permanently installed lighting unless specifically required by local codes.

6. Overcurrent Protection
Size the circuit breakers at the main panel according to the ampacity of the conductors you run to the shed and the requirements of the well pump motor. Remember that motor circuits have specific requirements for overcurrent protection (see NEC Article 430). Ensure your conductors are sized appropriately for the overcurrent protection and the load they will carry, taking into account voltage drop over the 30-foot run.7. Future Building Your plan to build another building in the future does influence the decision about a subpanel. Since you know you will eventually need a subpanel, it might be wise to install one at the well pump shed now, even if it's not strictly required.

Recommendations1. Plan for the Future

Consider installing a small subpanel (e.g., 6-space) in the shed now. This allows you to easily add more circuits later without having to re-run a new feed from the main panel.
If you install a subpanel, it will require a 4-wire feed (two hots, neutral, ground) from the main panel. The neutral and ground must be kept separate in the subpanel. You will need to drive ground rods (at least two, 6 feet apart) at the shed and connect them to the subpanel's grounding bus.2.

If NO subpanel, run two circuits

One circuit for the well pump, and one circuit for a single receptacle and a light fixture. Ensure the receptacle is GFCI protected.3.

Conduit

Use the correct type of conduit (e.g., Schedule 40 or Schedule 80 PVC, depending on local codes and potential for physical damage) and appropriate fittings for underground use. Seal the conduit to prevent water from entering.4.

Wiring

Use THHN/THWN wire inside the conduit.5.

Consult Local Codes

Always check with your local electrical inspector to confirm that your plans comply with all applicable codes and regulations. They may have specific requirements that are not covered by the NEC.