Question: I understand you need a seal off fitting leaving a c1 d1 area. Do you need another one on the same conduit where it stubs up outside the c1 d1 boundary
Yes, generally speaking, you will need a seal-off fitting where the conduit exits the Class I, Division 1 (C1D1) area.Here's why: Purpose of Seal-offs
Seal-offs are designed to prevent the passage of flammable gases, vapors, or dusts between hazardous and non-hazardous areas through conduit systems.
C1D1 Considerations
In a Class I, Division 1 area, there is a high probability that flammable gases or vapors will be present in ignitable concentrations under normal operating conditions.
Why at the Exit
If you only have a seal-off inside the C1D1 boundary, any flammable gases/vapors that enter the conduit before that seal-off can still travel out of the conduit on the non-hazardous side. The purpose of the seal off is to prevent the propagation of explosion or fire through the conduit.
NEC Requirements
The National Electrical Code (NEC), specifically Article 501.15, outlines the specific requirements for seal-offs in Class I locations. It dictates where and how seal-offs must be installed. While I can't provide specific code interpretations, it is likely a seal-off would be required.
Exception: When dealing with non-threaded conduit that does not provide a path for propagation of gases, vapors or flames. (typically PVC coated conduit. Check the specific product listing)Key Considerations and Recommendations
Consult the NEC
The definitive answer will be found in the NEC, and specifically the applicable sections within Article 501.15.
2.
Engineering Design
Consult with a qualified electrical engineer experienced in hazardous location design. They can assess the specific application, determine the appropriate classification of the area, and specify the necessary seal-off requirements.3.
Local AHJ (Authority Having Jurisdiction)
The AHJ, typically a local building or electrical inspector, has the final say on whether an installation meets code requirements.4.
Manufacturer Instructions
Always follow the manufacturer's instructions for installation of the seal-off fittings and sealing compound.
In summary, while there might* be very specific exceptions depending on the exact installation and AHJ interpretation, you should generally expect to need a seal-off fitting where the conduit exits the Class I, Division 1 area. Consult the NEC and a qualified electrical engineer to ensure compliance. Flag for review