Question: Doing a small residential Remodel + "Service Mod" (replacing old 50' run of SEU with SER and external disco). House was built ~ 1970, split level with garage under and on a well. Original service included a disconnect inside the garage directly behind meter, main panel fed with 4/0 3-wire to panel with a separate GEC from single exterior ground rod to disco, from disco to panel. Directly below the panel is what to me originally appeared to be a copper coated ground rod driven through the pad with a #4 bare up into the panel (i removed the #4). But after installing a new 200A meter/disco combo and two fresh ground rods with a #6 to the meter, that random interior ground rod was nagging at the back of my mind. I started thinking that maybe, that was not a ground rod but a CEE. I have limited experience with CEE's, but I have never seen a copper-coated ground rod used as one and don't see how it could be done correctly and still use that pronoun (**all chuckle**). I took a pair of channels and tried to turn it to see if it could, nope, smashed it with a sledge nothing happened seemed rock solid. SO anyway, short story long, my question to ya'll is this; have you ever seen a CEE terminated by way of a copper-coated ground rod with an acorn and #4 and is that even possible or is this just simply a ground rod that was driven before the pad was poured. Obviously there is no way for me to verify that the installation meets the requirements of an Ufer and yes I could hook it up anyway but I don't want to buy 60' of #4 to run all the way back to the disconnect if it is just a ground rod. Inspection should be tomorrow and i want to be prepared for a discussion with inspector, so any input is good input.- \m/ shocka brah

Okay, this is a good brain-teaser! Let's break down the situation and the possibilities

Understanding the Key Components
Service Entrance Upgrade (SEU to SER)

Replacing older cable with a safer, often 4-wire (including neutral) system.


External Disconnect

Adding a visible, accessible disconnect before the main panel, a common modern practice.

Grounding Electrode System (GES)

The system that connects the electrical system to the earth, crucial for safety. Key components include:


Ground Rods

The traditional method.

Concrete-Encased Electrode (CEE) / Ufer Ground

Grounding conductor encased in concrete.


Grounding Electrode Conductor (GEC)

The wire connecting the grounding electrodes to the service equipment (meter disconnect, panel).

NEC (National Electrical Code)

Your bible, and the inspector's.

Analyzing Your Situation
1. The Mystery "Ground Rod" in the Garage Slab

This is the heart of your question.


Possibility 1: Just a Regular Ground Rod

This is very plausible. It could have been driven before the slab was poured, or even after through a pre-drilled hole. The #4 connection strengthens this theory.

Possibility 2: An Attempt at a CEE (Ufer Ground)

Less likely, but we can't rule it out yet.


The Copper-Coated Rod Issue

You're right to be skeptical. CEEs are supposed to be bare copper conductors (usually #4 or larger), not copper-coated steel. The coating will degrade over time, and the steel may corrode.

Proper Ufer Construction

A true CEE needs to be
at least 20 feet of bare copper conductor at least 1/2" in diameter encased in at least 2" of concrete. A single ground rod is NOT sufficient.2.

Your New Grounding System

You've installed two new ground rods with a #6 GEC to the new meter/disconnect combo. This is good and meets the minimum NEC requirement if the inspector tests the ground resistance to 25 Ohms or less, otherwise additional ground rods will be required.3.

Original Grounding

The 4/0 to the original panel had a separate GEC to a single exterior rod and then from disco to panel.

Key Questions to Ask Yourself
What's the Soil Like? Rocky soil can make ground rod driving difficult, leading to unconventional solutions. Was There Evidence of Other Grounding Connections? Any signs of other conductors connected to this "rod" at the time of construction? How Deep is the Copper Coating? Can you see the underlying metal? If it's just a thin coating, it reinforces the idea of a regular ground rod.

How to Prepare for the Inspection1. Honesty and Transparency

Be upfront with the inspector. Explain what you found, what you suspect, and why you're unsure.2.

Code References

Have the relevant sections of the NEC handy. Key sections will be Article 250 (Grounding and Bonding), specifically: 250.50: Grounding Electrode System 250.52(A)(3): Concrete-Encased Electrode (CEE) requirements 250.53(G): Installation of Rod, Pipe, and Plate Electrodes 250.64(F): Installing grounding electrode conductors3.

Documentation

Take pictures of everything! Before you touched it, the "rod" in the slab, your new grounding system.4.

Your Reasoning

Clearly articulate why you think it might be a ground rod and why it likely isn't a proper CEE. Focus on the copper coating and the lack of 20 feet of encased copper.5.

Alternative Plan

Be prepared to offer solutions:

If the inspector accepts it as a ground rod

You can choose to use it or not. If you use it, you will need to bond it with a #6 to the other ground rods.


If the inspector says it's NOT a proper CEE and doesn't accept it as a ground rod

Disconnect and abandon the #4 wire from the slab. Your new ground rods and the GEC to the meter/disconnect will suffice.

Consider offering to drive another ground rod if the inspector thinks it is still necessary



My Prediction & Recommendation


Based on your description, my
guess is this: It's most likely a ground rod that was driven before the slab was poured. It almost certainly doesn't meet the requirements of a CEE. The inspector may ask you to disconnect it, especially given the copper coating.

Therefore, my recommendation is:1. Be ready to disconnect and abandon that "rod" connection. Your new grounding system is likely sufficient.
2. If the inspector insists on using it, argue that it's not a proper CEE and offer to drive another ground rod instead.3. Don't hook up the 60' of #4 unless the inspector specifically requires it.Good luck with the inspection! Let me know how it goes. And remember, the inspector's interpretation prevails (even if you disagree politely and with code references!). Flag for review

Previous Question Next Question