Question: Have a plastic enclosure with a 1.26” dia. hole.Wasn’t aware of the size and planned to use 1” Seal Tite. K.O. for the 1” is slightly larger.Do most supply houses carry what appears to be 32mm flexible conduit and fittings?Thanks
Yes, most electrical supply houses will likely carry 32mm flexible conduit and fittings. Here's why and some things to consider: Standard European/Metric Size
32mm is a standard size for flexible conduit in metric systems. While you're dealing with a discrepancy due to an imperial/metric conversion issue, the supply house should have what you need.
Adaptation
Many enclosures are designed with the flexibility to accommodate both metric and imperial conduit sizes.*
International Manufacturing
A lot of electrical equipment, even if destined for the US market, is manufactured using metric standards.
Recommendations
Go to the Supply House
Visit your local electrical supply house. Tell them you have a 1.26" (or roughly 32mm) hole and need flexible conduit and fittings to fit. Explain you were intending to use 1" Sealtite but the KO size is too large.
2.
Ask About Adapters/Reducers
The supply house might also suggest adapters or reducers that allow you to use the 1" Sealtite. However, using a 1" fitting in an enclosure with a 32mm hole might not be the best solution mechanically, as it could introduce stress or vibration. The 32mm Sealtite is the better route.3.
Check the Hole Carefully
Double-check the exact diameter of the hole with calipers. 1.26" is very close to 32mm. There might be a slight difference.
4.
Alternatives to consider
A reducing washer or bushing, or a Sealtite connector intended for a slightly oversized knockout could be an option, so long as the connector can be properly secured.
Important Safety Note: When working with electrical wiring, always follow local electrical codes and safety practices. If you are unsure about any aspect of the installation, consult with a qualified electrician. Flag for review