Question: To preface this, i have had an inspection fail before because the ground wires and neutral wires were not separated on isolated terminal bus within a panel before.I have a main panel which is the service entrance of a dwelling unit, with a sub panel wired from it. There is no dedicated ground bus terminal in the main panel, all of the EGC, GEC and Neutral wires are terminated on the same common bus that also has the incoming service Neutral connected to it.I understand that the service entrance needs to have a bonding jumper between the neutral and ground bus terminals;https://www.whittinspections.com/wp-content/uploads/sites/51/2021/05/E15-Service_Panel-445x500-1.jpeg

Okay, let's break down your situation and address the core issues. You're right to be concerned about proper grounding and bonding, as incorrect setups can be dangerous.

Your Understanding is Correct



Main Panel as Service Entrance

You correctly identify that
at the service entrance (your main panel), the neutral and grounding conductors are bonded together. This is crucial for providing a low-impedance fault current path back to the source (the utility transformer).

Bonding Jumper

Yes, the bonding jumper (either a wire, a strap, or a screw depending on the panel design) connects the neutral busbar to the metal enclosure of the panel. This ensures the enclosure is at the same potential as the neutral, minimizing the risk of voltage on the enclosure in the event of a fault.

The Critical Points & Addressing Your Situation


Main Panel Configuration (Your Concern)

You stated "There is no dedicated ground bus terminal in the main panel, all of the EGC, GEC and Neutral wires are terminated on the same common bus that also has the incoming service Neutral connected to it."

This is perfectly acceptable,
and expected, at the service entrance.
The key is that it is the service entrance. All grounding electrode conductors (GEC - to ground rods, water pipes, etc.), equipment grounding conductors (EGC - the ground wires from circuits), and the neutral conductor all terminate on the same bus. This is because this bus is bonded to the panel enclosure.2. Subpanel Wiring (Where Separation is Required)



Neutral and Ground Separation

In your subpanel, the neutral and ground conductors MUST be kept separate. This means: The neutral conductors from the circuits in the subpanel land on an isolated neutral bus bar. This bus bar should not be bonded to the subpanel enclosure. The equipment grounding conductors (EGCs - the ground wires from the circuits) land on a separate ground bus bar. This ground bus bar must be bonded to the subpanel enclosure. The only connection between the subpanel's neutral bus and ground system is through the equipment grounding conductor running back to the main panel.

Four-Wire Feed to Subpanel

The subpanel must be fed by a four-wire system from the main panel (two hots, a neutral, and a ground). The ground wire (EGC) is what carries fault current back to the main panel and ultimately to the utility ground.

Why Separate in the Subpanel?
Preventing Neutral Current on Ground Path

If the neutral and ground are bonded in the subpanel, you create an alternative path for neutral current to flow. This current would then flow through the subpanel enclosure and the EGC, which is undesirable. You want all neutral current to flow back to the source via the dedicated neutral conductor. Current flowing on the EGC can cause nuisance tripping of GFCI breakers and can also create a shock hazard if there's a break in the neutral conductor.

Reviewing for Inspection



Main Panel

Verify it is indeed the service entrance. Ensure all GECs, EGCs, and the service neutral are terminated on the same bus. Confirm the bonding jumper (screw or strap) is in place, bonding the neutral bus to the panel enclosure. Verify the correct size feeder wiring to the sub panel (including 4 wires).

Subpanel

Visually verify that the neutral and ground buses are separate and that the neutral bus is not bonded to the enclosure. Confirm the EGC (ground wire) from the main panel is connected to the ground bus in the subpanel. This provides the bonding between the subpanel enclosure and the service ground. Make sure there is no bonding jumper/screw connecting the neutral bus to the subpanel enclosure.

In summary

The rule of separating neutrals and grounds applies only to subpanels. Your description of the main panel sounds correct, provided it is actually the service entrance.