Question: If you had to cut an interior floor slab 80' to lay in a 3/4" and 1-1/4" EMT what would be the quickest way to do this?Think the GC is saying we HAVE to saw cut it. Would it be saw cut they chop it out? Anything quicker?Thanks.

Okay, cutting a trench in an existing concrete floor slab to bury conduit is a common task, but getting it done quickly and efficiently is key. Let's break down the options and why some are better than others, assuming you must saw cut

The "Must Saw Cut" Scenario - The Best Approach

This is the most likely and generally best approach for a good looking job.1. Saw Cutting



Tools



Concrete Saw

Use a walk-behind concrete saw with a diamond blade designed for concrete. Rent one if you don't own one. Blade size depends on your desired cut depth. Make sure it's suitable for interior use (electric or propane powered, dust control hookups).

Diamond Blades

Choose a blade appropriate for the aggregate hardness in the concrete. Harder aggregates require a different bond in the blade.


Wet/Dry Saw

A wet saw will create a slurry instead of dust. A dry saw requires dust collection.

Dust Collection (Critical)

This is essential for indoor work. Rent a high-efficiency particulate air (HEPA) filter vacuum designed for concrete dust. This protects workers and minimizes cleanup.


Chipping Hammer/Demolition Hammer (Small)

A small electric chipping hammer is better than a sledge hammer

Chisels

A variety of chisels, from wide flat chisels to point chisels.


Sledge Hammer (Optional, for stubborn sections)



Wheelbarrow or Buckets

For removing concrete debris.


Shovels, Picks, Pry Bars

For cleanup and removal.

Marking Tools

Chalk line, measuring tape, markers.


Procedure


Marking

Accurately mark the trench width. Consider the EMT diameter plus a little extra space for bedding the conduit in sand or concrete. A good rule of thumb is to add 1 inch per side of the largest conduit. So for 1-1/4" EMT, aim for a 3-1/4" wide trench.2.

Saw Cuts

Make two parallel saw cuts along your marked lines.

Crucially, control the depth!
Don't cut deeper than necessary. 1.5" to 2" depth is usually sufficient.
3. Multiple Passes (If Needed)

If your concrete is thick and your saw struggles to reach the desired depth in one pass, make multiple shallower passes.4.

Cross Cuts (Optional, but Helpful)

Every few feet (2-4 feet), make perpendicular "relief cuts" between your parallel cuts. These help break up the concrete and make removal easier.5.

Chipping

Use the chipping hammer or sledge hammer and chisels to break up the concrete between the saw cuts. Start at the edges and work your way towards the middle. The saw cuts create a clean break point, making this much easier.6.

Removal

Remove the broken concrete debris.7.

Cleaning

Clean the trench of loose debris and dust.2.

Bedding and Backfilling



Bedding

Place a layer of sand or fine gravel in the bottom of the trench to support the EMT.


Conduit Placement

Lay the EMT in the trench.

Backfilling

Backfill the trench. You have a few options:


Concrete

The strongest option, especially if the slab is load-bearing. Use a concrete mix similar to the existing slab.

Flowable Fill (Grout)

A self-leveling, easy-to-place material. Good for tight spaces and even support.


Sand/Gravel

A less expensive option, but may not provide as much support.3.

Cleanup

Use concrete cleaner or TSP to remove slurry.

Why Saw Cutting and Chipping is Preferred



Controlled Cut

Saw cutting creates a clean, straight edge, which is essential for a professional-looking repair.


Reduced Damage

It minimizes damage to the surrounding concrete slab compared to other methods.

Easier Chipping

The saw cut acts as a break plane, making the concrete easier to remove with hand tools.


Better Backfill Adhesion

The rough surface created by chipping provides a better bond for the backfill material.

Tips for Speed and Efficiency



Plan Ahead

Accurate layout is crucial. Double-check your measurements.


Sharpen Your Tools

Sharp chisels are essential.

Teamwork

If possible, have one person sawing and another removing debris.


Dust Control

Don't skimp on dust control. It slows you down if you're constantly stopping to clean.

Proper Technique

Learn the proper technique for using a concrete saw and chipping hammer. Don't force the tools.


Communication

Communicate with the GC and other trades to coordinate work and avoid conflicts.

Alternatives (If Saw Cutting is NOT Mandatory, or as a Supplement)

These are less likely to be acceptable, but worth mentioning if speed is the only consideration, and the GC is flexible. They are often messier and leave a rougher finish.

Jackhammer (Small)

A small electric jackhammer
could be used instead of the chipping hammer to remove the concrete between the saw cuts. This is faster than hand chipping, but harder to control and creates more vibration.

Concrete Grinder with Diamond Wheel

A diamond grinding wheel, often used for surface preparation, can be used to remove a small amount of concrete. This can be useful for fine-tuning the depth of the trench or smoothing out rough spots.

Important Considerations



Slab Thickness

Know the thickness of the concrete slab before you start. This will help you choose the right saw blade and cutting depth. Drilling a pilot hole is a quick way to assess this.


Reinforcement (Rebar/Mesh)

Be aware of the presence of rebar or wire mesh within the slab. If you encounter it, you'll need to cut it carefully with a grinder or torch. Consult with a structural engineer if you're unsure about the implications of cutting rebar.

Underground Utilities



ALWAYS
check for underground utilities (electrical, plumbing, gas lines) before you start cutting. Call 811 (in the US) or your local equivalent to have utilities marked. This is critical for safety. Building Codes

Ensure your installation complies with all applicable building codes and electrical codes.

Safety:
Wear appropriate personal protective equipment (PPE), including: Safety glasses or face shield Hearing protection Dust mask or respirator (especially if not using dust collection) Gloves Steel-toed boots Be aware of the hazards of working with concrete, including dust exposure, noise, and vibration. Use tools safely and according to the manufacturer's instructions.In summary, while saw cutting and chipping is the "standard" and likely best approach, clear communication with the GC is essential. Understand why they want saw cutting (appearance? structural integrity?). If there's flexibility, a controlled jackhammer or concrete grinder might* offer some time savings, but at the expense of a potentially rougher finish and increased risk of damage. Prioritize safety and thorough planning, and don't cut corners on dust control. Flag for review