Question: This is kind of a poll: what is preferred residential main panel *without meter* when doing higher amp solar installs.Trying to come up with a design scheme for something that I hope to replicate when in need of a main panel replacement or new construction. The goal is to support a solar inverter/battery such as Sol-ark 15k which has 200 amp bypass ability. In this situation the inverter would need to be man-in-the-middle between the meter and the main panel (panel without integrated meter), and the inverter has both an AC input (from meter) and AC output (to panel), it might be configured as grid-tied with back feed, or as "self-consumption only" with no back feed. In this situation I would have a separate meter box that goes in to a manual transfer switch, then to the inverter, and the transfer switch can be set to direct feed the main panel from the grid, or switch over to the inverter for it's main feed.In some installs where the owner does not care so much about battery backup or high PV generation, inverter would simply feed in on a breaker on a 200-225 amp main panel, with 30-40 amps max PV input depending on the consumption needs. In other situations where PV needs are higher (or become higher at a later date), the inverter would become the main feed via transfer switch to the panel and could fully control all power sources whether it be from battery/solar/grid. The goal is to try to keep the option to upgrade in to the 2nd scenario - people's needs change over time ie they buy an EV. By feeding the inverter in to the main breaker connection we are not exceeding the busbar capacity and can more easily deploy/upgrade these higher capacity PV installs.What are preferred panels that might be easier to work with in the situations?

Okay, this is a great question, and one many electricians and homeowners are grappling with as solar + battery adoption increases. You're right to think about future-proofing. Here's a breakdown of preferred panel characteristics and considerations, which should help you narrow down specific models

Key Considerations & Design Philosophy:
Busbar Rating

This is paramount. Think long-term. Even if you start with a smaller PV system, aiming for a panel with a

225A
busbar (or higher) is generally a smart move. It provides more headroom for future expansion.
Main Breaker Rating

200A is a common, and often sufficient, standard. But consider local codes.

Neutral/Ground Busbar Capacity

Make sure there are
plenty of termination points for neutral and ground wires. Solar, batteries, and even just modern electronics increase the number of required connections. Crowded busbars make for sloppy and potentially unsafe work.

Wire Bending Space

Adequate wire bending space is HUGE, especially when dealing with thick conductors from the meter, inverter, and potentially batteries. Cramped panels lead to difficult installs, increased labor costs, and potentially compromised connections.

Ease of Wiring

Look for features that simplify wiring, such as clearly labeled terminals, ample space for wire routing, and good access for screwdrivers/torque drivers.


Physical Size & Mounting

Consider the physical size of the panel. Bigger isn't always better. Make sure it fits in the intended location and is easily accessible for future maintenance.

Panel Characteristics to Prioritize
"Main Lug Only" (MLO) Panels

These are generally preferred
without an integrated main breaker when feeding from an inverter with bypass functionality, because it allows the inverter to act as the main breaker.

Space for Additional Breakers

Even if you don't need many now, having extra spaces for future circuits is always beneficial. Think about EV chargers, heat pumps, or other potential electrical loads.

Enclosure Type

NEMA 3R (outdoor rated) is a common choice for exterior meter + disconnect locations. NEMA 1 (indoor rated) for interior main panels.


Brand Reputation

Stick with reputable brands like Square D, Eaton, Siemens, Leviton, and GE. This ensures quality, availability of parts, and good customer support.

Specific Recommendations (General Categories - Research Specific Models)



Siemens PL Series MLO Panels

Many electricians favor Siemens for their robust construction and ample wiring space. Look for models with a higher busbar rating than your main breaker.


Eaton CH Series MLO Panels

Eaton is another reliable brand with well-designed panels. Their CH series is generally considered high-quality.

Square D QO Series MLO Panels

While often more expensive, Square D QO is known for its quality and reliability.

Important Considerations for Inverter Integration



Load Calculations

Always perform a thorough load calculation to ensure the panel size and service entrance are adequate for the existing and future loads. This is critical for safety and code compliance.

NEC Compliance

The NEC (National Electrical Code) dictates how solar and battery systems must be integrated with the electrical grid. Make sure your design adheres to all applicable codes and regulations.


Rapid Shutdown

Implement a rapid shutdown system as required by code.*

Permitting & Inspection

Obtain all necessary permits and inspections before starting any electrical work.

Example Scenario

Let's say you're planning for a Sol-Ark 15k (which is a great choice!). A possible configuration may include a 200 amp main panel, with 225 amp bus rating, without a breaker. The AC source (grid) comes in to a meter, then to a disconnect/manual transfer switch (a weatherproof box with a breaker and transfer switch is available on the market). Then, from the disconnect switch, the AC source will enter the Sol-Ark. The Sol-Ark's AC output will feed the 200 amp main panel. As long as the AC source is present and the Sol-Ark is configured to, it will allow grid power through. If grid power is not available and the transfer switch is set to the Sol-Ark, the load will be fed by batteries and/or PV.

In Summary:


Focus on a panel with ample busbar capacity (225A+), generous wiring space, and plenty of breaker spaces. Prioritize quality brands and always follow NEC guidelines and local codes. Consult with a qualified electrician to ensure your design is safe, compliant, and meets your specific needs. Flag for review