Topic: Vertical RMC conduit

User: jimej42, Location: sunnyside, washington

Asked on: Monday, October 21, 2024 at 1:36 pm EDT
Answered on: Thursday, March 6, 2025 at 4:13 am EST

Question: On industrial gas facility, crew was told to install conduit from bottom of IJB up 12' to below cable tray. On other projects we normally run conduit up then to tray horizontally. But in this case the conduit is vertical, after cable is installed will be installing duct seal at top, at bottom of conduit there is a low point drain. My question is, is there anything in the code book that would prohibit this vertical run? Thanks

You're essentially asking if a vertical conduit run, sealed at the top with duct seal after cable installation, and having a low-point drain at the bottom, is permissible under the NEC (National Electrical Code).

Generally, no, the NEC doesn't explicitly prohibit this setup if it meets specific requirements and considerations. However, there are many factors to consider to ensure it complies and remains safe. Here's a breakdown

NEC Considerations and Potential Issues:

1. Conduit Fill (NEC Article 344)

The conduit fill requirements must be met. Check Table 1 in Chapter 9 for fill limitations based on the type of conduit and the number/size of conductors. This is independent of the vertical or horizontal orientation of the conduit.2.

Conductor Ampacity (NEC Article 310)

Vertical runs, especially long ones, can affect conductor ampacity. Heat rises, so conductors in a long vertical run might experience slightly higher temperatures than in a horizontal run. While not usually a major concern for short 12-foot runs, it's something to be aware of, especially if the conductors are already operating near their maximum ampacity. Consult NEC 310.15 and associated tables for ampacity derating factors if necessary.
3.


Support (NEC 344.30)

The conduit needs to be adequately supported. Check NEC 344.30 for requirements for horizontal and vertical conduit supports. Vertical runs often require support at more frequent intervals. Given it's only 12 feet, this is unlikely to be a problem if properly installed.
4.


Sealing (NEC 501, 502, 505 for Hazardous Locations; NEC 300.7 for Temperature Differences)

This is the most crucial aspect of your question.

Hazardous Locations (Classified Locations)

If this IJB (Instrumentation Junction Box) and the conduit run are located in a Class I, II, or III Division 1 or 2 (or Zone equivalent) hazardous location (due to the presence of flammable gases, vapors, dust, or fibers), then the sealing requirements of Article 500 and its subsections must be strictly followed. Duct seal alone is highly unlikely to be sufficient for hazardous location sealing. Approved sealing fittings and compounds designed for hazardous locations are required.

Temperature Differential (NEC 300.7)

Even if not in a hazardous location, if there is a significant temperature difference between the IJB and the area where the conduit terminates at the tray (and especially if moisture is expected), sealing is critical to prevent condensation from being drawn into the IJB. NEC 300.7(A) requires measures to prevent the accumulation of moisture. The duct seal helps with this, but it's crucial it's properly applied and maintained.

Duct Seal Effectiveness

Duct seal is good for preventing air and moisture movement, but it is
not a substitute for a listed sealing fitting required by the hazardous location sections of the NEC.5.

Low-Point Drain

The low-point drain is a
good practice in a vertical run, especially if condensation is possible. Ensure the drain is accessible and functioning correctly.6.

Cable Type and Installation

Make sure the cable type is approved for the conduit and the environment. Also, consider how the cable will be pulled into the vertical conduit run. The cable's pulling tension limits should not be exceeded, and the cable should be properly lubricated to reduce friction. Having someone feed the cable from the top while another pulls from the bottom is usually necessary.7.

Access to Junction Box

Ensure that the vertical conduit run doesn't obstruct access to the junction box for maintenance or future modifications.

Why the "Typical" Horizontal Run?


The typical horizontal run from a junction box to a cable tray is often preferred for several reasons:
Easier Cable Pulling

Horizontal runs are generally easier for pulling cable.

Less Condensation Concerns

Vertical runs can accumulate condensation more readily.


Easier Access

Easier access to add/remove/service the conduit run.

Less Strenuous Support

less strenuous conduit support.

In summary, the vertical run
may be code-compliant, but it depends heavily on these factors



Location

If it's in a hazardous location, specific sealing requirements must be met (duct seal likely won't suffice).

Temperature Differential

Sealing is crucial to prevent condensation if there's a temperature difference.


Proper Installation

Conduit and cable are installed per code, including support, fill, and ampacity considerations.

Accessibility

The low-point drain is accessible, and the vertical run doesn't impede access to the IJB.

Recommendations


Review Hazardous Location Classification

Determine if the area is classified as hazardous. If so, consult the relevant sections of NEC Article 500 and related articles for specific sealing requirements. Use
listed sealing fittings and compounds designed for the hazardous location.2.

Consult a Qualified Electrical Engineer

Given the complexities, especially related to hazardous locations and potential condensation issues, it's highly recommended to consult with a qualified electrical engineer who can assess the specific site conditions and ensure compliance with all applicable codes and standards.3.

Thorough Documentation

Document all aspects of the installation, including conduit type, cable type, sealing methods, support details, and any engineering calculations performed.

Therefore, while a vertical run is not inherently
prohibited, you need to carefully* evaluate all the NEC considerations and ensure a safe and compliant installation. If you are in a hazardous location, duct seal is not sufficient. Consult an engineer!
Flag for review