Question: I have a client who wants many sections of Plugmold throughout a room concealed under a piece of trim. I don't use the stuff much so I am wondering how best to do the rough wiring? Will I be able to fit two pieces of 12-2 into one end of it? Or do I have to go in one end and out the other?The idea is numerous sections of 2-3 foot pieces. Thanks for any insight.
Okay, this is a common request and there are a few ways to approach it, but let's break down the considerations and best practices for your Plugmold installation.
Key Considerations
NEC Code Compliance
This is paramount. You need to ensure your wiring method and box fill are compliant with the National Electrical Code (NEC). Specifically, pay close attention to Article 380 (Multioutlet Assembly).
Box Fill
The number of conductors allowed in the Plugmold raceway is a critical factor.
Ampacity
Make sure your 12 AWG conductors are adequate for the anticipated load on the Plugmold. This is unlikely to be an issue for general-purpose receptacles but be sure to calculate.
Accessibility
Outlets, especially if concealed behind trim, must be accessible for maintenance and testing.
Trim Design & Installation
The trim must be designed and installed to allow access to the Plugmold sections without damaging the trim itself. Consider using removable panels or magnetically attached trim.
Grounding
Proper grounding is essential for safety.
Load Calculation
Determine the total load the Plugmold will serve to ensure your circuit breaker is appropriately sized.
Methods for Wiring Plugmold (Concealed Installation)
Here's a breakdown of some common approaches, with pros and cons:1.
Home Run to Each Section
Description
Run a dedicated 12-2 (or 12-3 for multiwire branch circuits) from a junction box (or panel) to each individual Plugmold section.
Pros
Simple wiring. Easy to troubleshoot. Clearly defined circuit for each section.
Cons
Requires a lot of wire. Lots of connections in the junction box. May not be practical if you have many short Plugmold sections.
Box Fill
The determining factor of how many homeruns you can get into a box will be the cubic inch capacity of the Jbox. Consult the table in the NEC2.
Daisy Chain (Series Wiring) with Feed-Through Connectors
Description
Run 12-2 from a junction box to the first Plugmold section. Use feed-through connectors (if the Plugmold section has them) to continue the wiring to the next section, and so on. The last section will be an end run.
Pros
Uses less wire than individual home runs. Fewer connections in the junction box.
Cons
Box fill can be tight in the Plugmold sections. Troubleshooting can be more complex. Voltage drop becomes more of a concern if the total Plugmold run is long and heavily loaded.
Important Considerations
Number of Wires
The biggest question. Most Plugmold channels are not designed to easily accommodate (4) 12 AWG conductors plus grounds (the wires in and the wires out). Some Plugmold sections might have enough space in the end compartments, but you must check. Measure the internal space. Consult the manufacturer's specifications for wire fill. Overfilling can damage the insulation and create a hazard.
Connectors
Use approved connectors suitable for the wire size and type. Don't use wire nuts inside the Plugmold. Crimp connectors or small lever connectors (like Wago) are generally better.
Splice Location
You may need to use a junction box at some locations to allow enough wiring space. The splice must be accessible.
Voltage Drop
Calculate the voltage drop along the entire run, especially if the load is significant.3.
Multiwire Branch Circuit (MWBC)
Description
Run a 12-3 (plus ground) cable. Share the neutral between two hots. Every other section would be on a different hot leg. This method can reduce wire runs.
Pros
Can reduce wire usage compared to individual home runs. May balance the load across the two legs of the circuit.
Cons
Requires careful wiring and understanding of MWBCs. Neutral must be properly sized to handle the potential imbalance. More complex troubleshooting.
Important Considerations
Handle Tie
The breaker MUST have a handle tie so both hots are turned off at the same time.
Neutral
The neutral is shared. This is only acceptable if the load between the two hot conductors is low, or if the neutral conductor is oversized. If your run is very long, an oversized neutral wire is recommended.
General Best Practices
Consult the Manufacturer's Instructions
Always refer to the specific Plugmold manufacturer's instructions for wiring, installation, and allowable wire fill. These instructions supersede general advice.
Use the Right Tools
Use the appropriate tools for cutting, stripping, and connecting wires.
Secure Connections
Make sure all connections are tight and secure. Loose connections can cause arcing and overheating.
Proper Grounding
Ensure that the Plugmold is properly grounded to the equipment grounding conductor.
Inspection
Thoroughly inspect the wiring and connections before energizing the circuit.
Testing
Test the circuit after installation to verify that it is working properly.
Load Calculation
Calculate the expected load and size the circuit breaker accordingly.
Addressing Your Specific Question
> Will I be able to fit two pieces of 12-2 into one end of it? Or do I have to go in one end and out the other?
The answer is: HIGHLY UNLIKELY without violating NEC. And it's almost certainly going to be very difficult physically. Most standard Plugmold sections simply don't have the internal volume to accommodate (4) 12 AWG conductors plus the ground conductor within a single end compartment. Even if you could physically force the wires in, you risk damaging the insulation, which is a major safety hazard. The NEC requires sufficient space for conductors to be installed without stress or damage.
Instead of trying to cram multiple conductors into a Plugmold end compartment, consider these alternatives
Junction Boxes
Use small junction boxes (accessible!) strategically located near the Plugmold sections. This will give you adequate space for splices and connections.
Two Compartment Plugmold
Some Plugmold has two compartments, one for power and one for communications.
Larger Raceway
Consider using a larger raceway system that is designed for more conductors. This will give you more flexibility and make the wiring easier.
In Summary:
Carefully plan your Plugmold installation. Prioritize safety and code compliance. Don't try to force wires into tight spaces. Use junction boxes or alternative wiring methods as needed. Make sure the trim design allows for easy access to the Plugmold for maintenance. Consult with a qualified electrician if you have any doubts or concerns. Flag for review