Question: Should large electric boilers be considered a general load or a heating load for service size calculations?The way that I interpret the code right now is that section 220.82 allows you to take the boiler load at the demand factor for general loads of 100% for the first 10kVA and at 40% for the rest of the loads. Does having a 40% demand factor on a large restrictive electrical element that can have a large peak usage make sense? Im not to familiar with the heating cycle of these boilers, but it feels wrong to have say a 100A boiler have a 40% demand factor.

You've highlighted a critical point regarding the application of demand factors to large electrical loads, specifically electric boilers. Your instincts are correct: applying a general load demand factor to a large, potentially high-draw heating appliance like an electric boiler often doesn't accurately reflect real-world usage and can lead to undersized service equipment.Here's a breakdown of why and how to approach this situation

Why Treating it as a General Load with Standard Demand Factors Can Be Problematic:
Heating Cycle Dynamics

Unlike typical general loads (like outlets used intermittently), electric boilers, especially larger ones, are designed for continuous or near-continuous operation during the heating season or when hot water is needed. Their "on" time can be substantial, approaching 100% during peak demand periods. A 40% demand factor simply doesn't reflect this duty cycle.


Sequential Operation of Elements

Many large electric boilers use multiple heating elements that operate in sequence to modulate output. While they may not all run simultaneously at 100% capacity all the time, the boiler's control system is designed to bring them online as needed to maintain temperature/pressure. A single element's duty cycle may be high.

Peak Demand

The purpose of service sizing is to ensure adequate capacity for the
peak demand. Underestimating peak demand can lead to overloads, voltage drops, and potential equipment damage. A boiler drawing close to its rated current for extended periods will certainly contribute significantly to peak demand.

Manufacturer Data

Boiler manufacturers provide important data about operating characteristics. Look at:

Locked Rotor Amperage (LRA)

For any motors included (pumps, fans, etc.). While LRA only applies during startup, it needs to be accounted for.


Full Load Amperage (FLA)

For any motors.

Maximum Current Draw

This is critical. It represents the maximum current the
entire boiler can draw when all elements are operating as designed. This is the starting point for your calculations.

Code Interpretation

While 220.82 might seem applicable on the surface, the intention of demand factors is to account for the diversity of load usage across different appliances. A boiler is a single, concentrated load dedicated to a specific purpose (heating), not a diverse mix of appliances.

How to Properly Size the Service for a Large Electric Boiler


NEC Sections to Consider



Article 220: Branch-Circuit, Feeder, and Service Calculations

This is the overarching guide.


220.3: General Requirements

Start here! It sets the foundation.

220.10(A): Continuous Loads

This is VERY important. A load is considered continuous if it operates at maximum current for 3 hours or more. Electric boilers often qualify as continuous loads, or at least approach it, so they are rated at 125%.


220.50: Appliances

This is where specific demand factors for appliances might be found.

220.80-220.87 Optional Feeder or Service Load Calculations

This is for a dwelling unit or existing installations not new.


Article 424: Fixed Electric Space-Heating Equipment

This article provides specific requirements for space heating equipment, including electric boilers.

Article 430: Motors, Motor Circuits, and Controllers

If the boiler has motors (e.g., for pumps), you must apply the motor rules (especially for starting current).2.

Gather Data



Boiler Nameplate

Record all relevant information, especially voltage, phase, maximum current draw, power rating (kW or kVA), and motor horsepower (if applicable).

Manufacturer's Specifications

Obtain detailed spec sheets, wiring diagrams, and installation instructions. These often contain crucial information not on the nameplate.3.

Calculate the Load



Heating Load

The maximum current draw of the boiler is the starting point. You'll need to convert the power rating (kW) to current (Amps) using the appropriate formula for your voltage and phase.

Motor Loads (if any)

Calculate the branch-circuit and feeder/service requirements for any motors associated with the boiler (pumps, etc.) according to Article 430. Include LRA for motor starting.


Continuous Load Consideration

If the boiler is likely to operate at or near its maximum load for 3 hours or more continuously, treat it as a continuous load and multiply its current by 125% (220.10(A)).

Diversity (Apply Carefully)



Generally, avoid applying demand factors unless you have solid, documented evidence from the specific installation site that the boiler never operates near its full capacity for extended periods.
If diversity is truly justifiable (e.g., a very large system with multiple boilers where a control system actively manages load shedding), thoroughly document the basis for your diversity factor. Get this in writing from the engineer or building owner. Consider the worst-case scenario: What happens if the load shedding system fails? The service must still be able to handle the load. Local codes may have additional requirements and restrictions on demand factors.4. Calculate Total Service Load

Add the boiler load (with any applicable continuous load factor and motor loads) to all other anticipated loads on the service. This includes lighting, receptacles, HVAC, and other equipment. Apply appropriate demand factors to the other loads (lighting, receptacles, etc.) only if justified by their usage patterns.5.

Select Service Equipment

Choose service entrance conductors, overcurrent protection, and other equipment rated to handle the calculated total service load with appropriate safety margins (based on NEC requirements for ampacity, voltage drop, and interrupting ratings).

Example (Illustrative)

Let's say you have a 480V, 3-phase electric boiler with a nameplate rating of 100 kVA and a maximum current draw of 120 Amps. It has a circulating pump motor rated at 5 HP. The total calculated connected general load for the facility is 50A.1.

Boiler Load

120 Amps. Assume it's a continuous load, so 120A 1.25 = 150A2.

Motor Load

Apply Article 430 rules to determine the motor branch-circuit and feeder/service requirements. Let's assume this results in an additional 20A for the motor.3.

General Load

50A
1.0 = 50A4.

Total Service Load (Simplified)

150A + 20A + 50A = 220AIn this example, the electric boiler dominates the load calculation. Using a 40% demand factor on the 100A of boiler load above 10k would drastically underestimate the actual demand.

Key Takeaways:
Err on the side of caution when sizing for large electric boilers. It's better to have excess capacity than to risk overloads and equipment failure. Prioritize the nameplate information and manufacturer's specifications. Carefully consider whether the boiler is a continuous load. Document your calculations and the basis for any demand factors you apply. Consult with a qualified electrical engineer or inspector if you have any doubts. Adhere strictly to all applicable codes and standards.In conclusion, while section 220.82 might seem applicable at first glance, the characteristics of large electric boilers usually demand a more rigorous and conservative approach to service sizing. Consider them a continuous load (125%) unless you have compelling data that proves otherwise. Pay close attention to the manufacturer's specifications, and prioritize safety and reliability. Flag for review