Question: Hi,Im specifying an emergency generator with level 1 category per NFPA 110.The service is over 1000 A and over 150 volts line to ground.is it required to install the emergency equipment in a separate room per NFPA 110 article 7.2.2?is it also required that that room complies with the space requirements per NEC 70 article 700.10(D)?Any exceptions that allows you to install emergency equipment in the same space of normal equipment?thank you

Okay, let's break down the requirements for emergency generator installations per NFPA 110 and how they interact with the NEC.

NFPA 110: Standard for Emergency and Standby Power Systems 7.2.2 Location

This section generally requires emergency power supply (EPS) equipment to be in a separate room from the normal power supply. This requirement is driven by the need to protect the emergency equipment from hazards that could compromise its operation during an emergency.


Applicability

The need for a dedicated room is often triggered by the size and voltage of the service, and the nature of the facility. You've stated your service is over 1000A and over 150V line-to-ground, which typically falls into a category that would warrant careful consideration of separation. However, there are exceptions and further clarifications within NFPA 110 that need to be examined.

Key Considerations Regarding Separation



Hazards

The primary reason for the separate room is to protect the EPS from fire, flooding, physical damage, and other hazards that could disable the normal power supply. If the normal power equipment room presents a significant risk of these hazards, a separate room for the emergency equipment is crucial.

Enclosure Ratings

Instead of a dedicated room,
you might be able to use adequately rated enclosures for the emergency equipment to protect it from the potential hazards in the normal equipment room. This is often a cost-effective alternative. This is where consulting with a fire protection engineer or AHJ is critical.

NEC (National Electrical Code)
700.10(D) Space

This section of the NEC focuses on providing adequate working space around emergency equipment. It is separate from the physical separation requirement addressed in NFPA 110.

Addressing Your Specific Questions
1. Is a separate room required per NFPA 110 article 7.2.2? Likely, but Not Always

Given your service size (over 1000A and over 150V line-to-ground), it's
likely that a separate room will be required, especially if the normal power equipment room presents significant hazards.

However, the key is to assess the hazards in the normal power equipment room.
Enclosures as an Alternative

If the normal equipment room is relatively safe, or if you can mitigate the risks with appropriate enclosures (fire-rated, flood-proof, etc.), you might be able to avoid a separate room. This requires careful engineering judgment and approval from the Authority Having Jurisdiction (AHJ).2.

Is the room required to comply with NEC 700.10(D)?
Yes, absolutely. Regardless of whether you use a separate room or enclosures, the emergency equipment must have adequate working space around it, as defined in NEC 700.10(D). This is a fundamental safety requirement for maintenance and operation.3. Any exceptions that allow you to install emergency equipment in the same space as normal equipment? Yes, but Carefully Considered



Hazard Mitigation

If you can
demonstrate to the AHJ (and document in your design) that the hazards in the normal power equipment room are minimal or can be adequately mitigated with appropriate protection measures (e.g., fire-rated enclosures, flood barriers), then you might be able to install the emergency equipment in the same space.

Small Installations

Smaller emergency systems (those serving a small number of critical loads) sometimes have more flexibility, but this depends heavily on the specific application and AHJ interpretation.

Specific NFPA 110 Exceptions

Carefully review the specific exceptions within NFPA 110 itself. There might be exceptions related to specific types of facilities or loads being served.

Key Steps to Determine Requirements
1. Hazard Assessment

Perform a thorough hazard assessment of the normal power equipment room. Identify potential risks from fire, flooding, physical damage, etc. Document your findings.2.

Review NFPA 110 Thoroughly

Carefully read the entire Section 7.2 and any related annex material in NFPA 110. Pay close attention to any specific exceptions that might apply to your situation.
3.


Consult with the AHJ

The most important step is to consult with the Authority Having Jurisdiction (AHJ). Present your hazard assessment, your proposed design (including enclosure ratings, if applicable), and ask for their interpretation of the requirements. Get their approval in writing if you plan to deviate from the separate room requirement.4.

Engage a Qualified Engineer

Work with a qualified electrical engineer who is experienced with emergency power systems and familiar with NFPA 110 and the NEC. They can help you navigate the complexities of the code and ensure that your design meets all applicable requirements.5.

Fire Protection Engineer

Consider consulting with a fire protection engineer to evaluate fire risks and recommend appropriate fire-rated enclosures or other fire protection measures.

In Summary


While a separate room is often required for emergency equipment with services over 1000A and over 150V line-to-ground, it is not always mandatory. The key is to evaluate the hazards, explore mitigation options (like enclosures), and
always* consult with the AHJ to get their approval. You must also comply with the working space requirements of the NEC, regardless of whether you have a separate room or not.Good luck with your project! Flag for review