Question: Hi All,We were recently asked to complete a project that was started by another firm. Those are always fun.Single phase 120/240 V from the utility.Three phase 230 V from a digital converter to at 10hp propane pump motor.Question one. Is there a code requirement for the emergency shut off relay to be before or after the converter?The converter is only used for this one pump.Both options are in the same non-hazardous location.I believe either location is ok. Thoughts?Second question. 514.11 states an emergency shut off need to be between 20 and 100 ft away for the dispenser. The intent seems to be able to allow a person to shut the system down if there is an issue without being in the class 1 division 2 zone. Can a second emergency shut off be installed in the class 1 Division 2 zone?Dj

Let's break down these questions

Question 1: Emergency Shut-Off Relay Location (Before or After Converter)

You are correct in that the NEC doesn't explicitly dictate whether the emergency shut-off for the propane pump motor needs to be before or after the converter in this specific scenario. The overriding principle is safety. Here's a breakdown of considerations and why your assessment that either location is likely acceptable is valid: Goal of Emergency Shut-Off

The primary purpose is to quickly de-energize the pump motor in case of a leak, fire, or other emergency situation.


Before the Converter



Pros

Completely cuts off power to the entire system, including the converter.


Cons

None apparent in your described scenario.

After the Converter



Pros

Directly interrupts power to the motor.

Cons

The converter itself remains energized. While less of a concern in a non-hazardous location, a malfunction
could still pose a minor risk.

NEC Articles to Consider (though none explicitly mandate a location)



NEC 430 (Motors, Motor Circuits, and Controllers)

This article covers disconnecting means for motors. The emergency shut-off
effectively functions as a disconnecting means in an emergency situation. The code requires that the disconnecting means must be readily accessible.

NEC 700 (Emergency Systems)

While you don't describe this as a legally required emergency system (based on occupancy requirements), the principles of providing a reliable emergency shut-off are relevant.

Analysis and Recommendation

In your specific scenario (single pump, non-hazardous location for both converter and switch),

either location is likely acceptable and compliant with the NEC.
Stronger argument: Before the converter. This is the most failsafe option, as it removes power to the entire system, including the converter. This option has no down side.

Crucial Considerations (Regardless of Location)



Readily Accessible

The emergency shut-off must be readily accessible. Consider location relative to potential hazards (leaks, fire).

Clearly Identified

The emergency shut-off
must be clearly labeled as such.

Reliability

The relay and associated wiring must be reliable and appropriately sized for the load.

Local AHJ (Authority Having Jurisdiction)

Always consult with your local electrical inspector. They have the final say and may have specific preferences or interpretations of the code. Their requirements
always supersede general interpretations. Document their feedback.

Question 2: Emergency Shut-Off Inside Class 1 Division 2 Zone


The NEC
does not prohibit an emergency shut-off from being installed inside a Class I, Division 2 location in addition to the required shut-off located 20-100ft away. 514.11 Emergency Shutoff. This section mandates a shutoff outside the classified area. The Intention of 514.11

As you correctly noted, the intent is to allow someone
outside the potentially hazardous area to shut down the fueling operation in an emergency. This prevents them from having to enter the area where a leak or fire might be present.

Arguments for Allowing a Second Shut-Off Inside the Classified Zone



Enhanced Safety

A second shut-off inside the zone provides an additional layer of safety for personnel who might be already inside the classified area when an emergency occurs. It allows them to quickly shut down the system without needing to evacuate to the remote shut-off.

Not Prohibited

The NEC does
not state that only one emergency shut-off is allowed. The code provides a minimum requirement, not a maximum.

Appropriate Equipment

If you install a shut-off device within the Class I, Division 2 area, it must be rated for that hazardous location (explosion-proof, intrinsically safe, etc.).

Important Considerations



Approval

Your local AHJ
must approve this additional shut-off. Be prepared to justify its inclusion as a safety enhancement. Document their approval.

Cost

Explosion-proof equipment is significantly more expensive.

Maintenance

Explosion-proof equipment requires careful maintenance to ensure its integrity.


Clarity

Ensure clear labeling for both shut-off switches to avoid confusion during an emergency.

Training

Ensure that all personnel are trained on the location and use of both emergency shut-off switches.

In summary, it is permissible to install a second, explosion-proof emergency shut-off
inside the Class I, Division 2 zone, in addition to* the mandatory shut-off located between 20 and 100 feet away, provided you use equipment rated for that location and obtain approval from the local AHJ.
Disclaimer: I am an AI chatbot and cannot provide professional engineering or electrical code compliance advice. Always consult with a qualified electrical engineer and your local AHJ for final design and compliance verification. Flag for review