Question: Hi,I am working on a project where some HVAC equipment's are being replaced. The client's electrical equipment, including main switchboard, disconnects, etc does not have any Arc Flash labels on it. The original drawings are from around 50 years ago and it looks like they had some changes on their panels around 10-20 years ago so I am not sure why there isn't any Arc Flash labels on it. I believe there is some requirement by NFPA 70E that Arc Flash has to be updated every 5 years or when major upgrades happen. I am not sure if replacing Hvac equipment's is considered "major upgrade" but is the 5 years thing only applicable when there is an existing study already done? If there was no Arc Flash analysis done during the original installation, does the code (NEC or NFPA) require that an Arc Flash analysis be performed if we are doing any work on the panel (adding breaker, swapping a breaker to different rating, etc)? I'd like to ask for reference from the code in order to justify the Arc Flash requirement to the owner, if this is something they should be doing.

You're right to be concerned about Arc Flash labeling and the associated analysis. Here's a breakdown of the requirements and how to justify it to the client, with code references

Key Takeaways:
Arc Flash hazard assessment is a continuous requirement, triggered by changes and by time. Even without "major upgrades," the 5-year review necessitates an assessment. Working on energized equipment always requires an assessment. Adding or changing breakers absolutely falls under this. The employer (client in this case) is ultimately responsible. They need to understand their legal and ethical obligations.

Here's the breakdown, with code references



1. The Core Requirement: Arc Flash Hazard Assessment
NFPA 70E Article 110.1(G)

“The employer shall perform an arc flash hazard risk assessment before an employee is exposed to an electrical hazard. The arc flash hazard risk assessment shall determine if an arc flash hazard exists, and if so, the assessment shall determine the appropriate arc flash PPE and working distance.”



Translation

This is the core of it. Before
any work is done on or near energized equipment, an Arc Flash hazard risk assessment must be performed. This assessment must determine the required PPE and safe working distance.

NFPA 70E Article 130.5(C) Labels

“Electrical equipment such as switchboards, panelboards, industrial control panels, meter socket enclosures, and motor control centers that are in other than dwelling units and that are likely to require examination, adjustment, servicing, or maintenance while energized shall be field-marked with a label containing all the following information:…”

Translation

This mandates Arc Flash labels on specific equipment, which must show the Hazard/Risk Category, PPE requirements, and/or the available incident energy. If it's likely to be worked on energized, it
needs a label.

2. The 5-Year Review/Update



NFPA 70E Article 130.5(D)

“The arc flash hazard risk assessment shall be reviewed and updated when a major modification or renovation takes place. It shall be reviewed periodically, at intervals not to exceed 5 years.”

Translation



Major Modifications/Renovations

Replacing HVAC equipment could be considered a major modification, especially if it impacts the electrical load on the system significantly. It's arguable, but you could certainly present it that way.

Periodic Review

Regardless of modifications, the Arc Flash hazard risk assessment
must be reviewed at least every 5 years. Since there are no existing labels, the owner is already in violation of the 5-year rule.

3. The "Trigger" for Assessment: Any Work Requiring Energized Access
NFPA 70E Article 130.2(A)(4)

“Energized electrical work shall be permitted where the following conditions are met:a. Infeasibility. Energized work is permitted because of infeasibility due to design of equipment or operational limitations.b. Increased or Additional Hazards. Energized work is permitted because de-energizing introduces additional or increased hazards.c. Less than 50 Volts. Energized work is permitted where the voltage is less than 50V.”



NFPA 70E Article 130.2(B)(1)(a)

“If energized work is permitted, the qualified person shall perform a risk assessment.”

Translation

If you're adding or modifying breakers, or otherwise working on energized equipment, you're required to justify why you cannot de-energize the equipment, and you MUST perform a Risk Assessment, including Arc Flash.

4. NEC (National Electrical Code)

While the NEC doesn't explicitly mandate Arc Flash studies, it implicitly supports them through its emphasis on safety and proper installation. Many jurisdictions require compliance with NFPA 70E as part of their electrical codes. Therefore, even if the NEC isn't direct, local codes might enforce it.

5. Justification to the Client

Here's how to explain it to the client, emphasizing their responsibility:

Legal and Regulatory Compliance

"OSHA and NFPA 70E require employers to protect employees from electrical hazards, including Arc Flash. We are obligated to follow these regulations. Non-compliance can result in significant fines and legal liability." "The existing electrical system hasn't been assessed for Arc Flash hazards, and it's past the 5-year review deadline set by NFPA 70E. We are already non-compliant"

Employee Safety

"Our priority is the safety of our workers. An Arc Flash study will identify the potential hazards and provide the information necessary to protect our staff with the correct PPE and safe work practices."

Liability Mitigation

"By performing an Arc Flash study and implementing its recommendations, we are taking proactive steps to mitigate the risk of electrical incidents and reduce potential liability in case of an accident."

Equipment Protection

"The Arc Flash study may reveal weaknesses in the electrical system that could lead to equipment failure. Addressing these issues can improve system reliability and prevent costly downtime."

Future Work

"Whenever any electrical work is performed on the panel, we are required to do an arc flash risk assessment."

How to present this to the client


Start with Safety

Emphasize that this is about protecting people.2.

Explain the Law

Clearly state that regulations require them to do this.3.

Outline the Scope

Explain what an Arc Flash study involves and what they will get (labeled equipment, PPE recommendations, and safe work practices).4.

Explain the Consequences of not Doing It

Fines, liability, and, most importantly, the risk of serious injury or death.5.

Offer Solutions

Provide them with options for performing the Arc Flash study and implementing the findings.

Example Conversation Starters

"During our review of the electrical system for the HVAC replacement, we discovered that the existing switchboard lacks Arc Flash labels. OSHA and NFPA 70E require us to perform an Arc Flash hazard assessment before any work is done on or near energized equipment." "To ensure compliance with regulations and protect our staff, we recommend conducting an Arc Flash study of the electrical system. This will involve analyzing the system, calculating Arc Flash incident energy levels, and providing recommendations for PPE and safe work practices." "The Arc Flash study will provide us with the information we need to properly label the equipment, train our employees, and implement safe work practices to prevent electrical incidents."

In summary, you have a strong case for recommending an Arc Flash study. It's not just about replacing the HVAC equipment; it's about overall electrical safety and compliance. Focus on the legal obligations, the safety benefits, and the potential cost savings of preventing accidents.
Flag for review

Previous Question Next Question