Topic: Pendant 48 in led

User: Fordean, Location: New Jersey

Asked on: Monday, January 27, 2025 at 7:53 pm EST
Answered on: Thursday, March 6, 2025 at 7:53 am EST

Question: 48 in led strip lights 16 in of jack chain pendant Mc is not allowed only a SJ cord I was always under this impression but i see many installs with Mc/bx Some 10 feet of chain and exit sign I viewed a job we are bidding And all i see in the building is mc kn hack chain My whole install in bid is sj to junction box Junction box in between 2 48 in strips making 2 SJ per box But at 400 fixtures this a lot more expensive than MC tywrap to jack

You're right to be concerned about the use of MC/BX in these applications, and your understanding of the code regarding flexible wiring methods is generally correct. Let's break down the situation

Why SJ Cord is (Likely) Your Best and Safest Bet (Even with the Cost)
Specific Application

SJ cord (or similar "hard service" cord) is specifically listed for pendant-style fixtures where you need flexibility and movement. It's designed to withstand the constant flexing and potential abrasion that a fixed cable like MC/BX simply isn't.


Pendant Support

Using MC/BX with jack chain requires the MC/BX itself to provide support and protect the conductors. It's rarely done correctly in the field because...

NEC Restrictions on MC/BX as Support

The NEC
heavily restricts MC/BX as a sole means of support, especially for luminaires. You'll typically need to add independent support (like the jack chain itself, properly installed) that bears the fixture's weight. The MC/BX merely provides electrical connection. Many installations you see using MC/BX and jack chain are likely not compliant, even if they passed inspection.

NEC 410.30(B): Luminaires as raceways.
You can't use MC cable (or any other wiring method) as a supporting raceway for another luminaire. Each luminaire needs its own independent support. Workmanship

Proper MC/BX termination on a moving pendant is also tricky. Vibration can loosen connectors over time.


Safety and Liability

If there's a failure (e.g., chafed conductors, loose connection, cable pulling out of a connector) and someone gets hurt, you'll be responsible for installing to code.

Why You See MC/BX in Some Installs (and Why It's Often Wrong)
Ignorance or Corner Cutting

The most common reason. Installers prioritize speed and cost over code compliance.


Misinterpretation of the Code

Some might try to argue that they're not using the MC/BX for support, just for electrical connection. However, this is a difficult argument to make if the jack chain is slack and the MC/BX is bearing any weight.

Lazy Inspections

Inspectors, for various reasons, may miss violations. A passing inspection doesn't automatically validate a non-compliant install.


"That's How We've Always Done It"

Bad habit inherited from previous generations of installers.

Addressing the Cost Issue


You're right; using SJ cord and junction boxes for 400 fixtures is a significant expense. Here are some suggestions: Value Engineering

Present the cost difference transparently to the client. Explain
why you're using the more expensive method (code compliance, safety, longevity). Emphasize that the slightly higher initial investment will save money in the long run by ensuring compliance and reducing the risk of future problems.

Supplier Negotiation

Talk to your supplier about bulk discounts on SJ cord, junction boxes, and connectors. Negotiate aggressively.

Labor Efficiency

Analyze your installation process carefully. Can you streamline the wiring and termination to save time? Consider pre-assembling sections in your shop.


Alternative Fixture Options

Look at linear LED fixtures specifically designed for pendant mounting with integrated wiring solutions. Some manufacturers offer fixtures with pre-installed cords or quick-connect systems that reduce field wiring. Be sure they meet your required light levels/foot candles.



Design Optimization

If feasible, could you adjust the fixture layout to reduce the number of fixtures needed?


Justification in the Bid

In your bid, clearly state the code requirements you are meeting and why you are using the specific wiring methods. This will differentiate you from competitors who are cutting corners and potentially violating the NEC.

Key NEC Sections to Keep in Mind

NEC Article 400

Flexible Cords and Cables


NEC Article 410

Luminaires, Lampholders, and Lamps

NEC 300.11

Securing and Supporting Wiring Methods


NEC 314

Outlet, Device, Pull, and Junction Boxes; Conduit Bodies; Fittings; and Handhole Enclosures

The Exit Sign ExampleExit signs often do use MC/BX, but they're usually surface-mounted or supported directly to the building structure, not hung from a chain. Even then, the MC/BX needs to be properly supported and terminated. If you see an exit sign dangling from a chain with MC/BX as the sole support, that's likely a violation as well.

In SummaryWhile the initial cost might be higher, sticking with SJ cord and proper junction boxes is the correct and safest way to install these pendant LED strip lights. It minimizes your liability and ensures a code-compliant installation. By communicating the value of a code-compliant, safe installation to your client, and by optimizing your installation process, you can justify the higher cost and potentially win the bid. Always prioritize safety and compliance over cost-cutting measures. Flag for review