Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: PE stamp fees

User: Andres Arias, Location: New York

Asked on: Sunday, February 16, 2025 at 3:10 pm EST
Answered on: Thursday, March 6, 2025 at 8:44 am EST

Question: Hello. I am reaching out to ask about $$ inquire.As a professional engineer, how much should I charge to stamp arquitectural and electrical plans for Photovoltaic residential projects?. My company is dealing with a little mnore than 50 residential deals a month, however we have not jumped into an arrangement to stamp those plans yet, but we'll do soon. As per your experience, and considering the amount of deals to stamp, which should a fair $$ agreement be under this context?Thanks in advance for your feedback

Okay, let's break down how to determine a fair rate for stamping architectural and electrical plans for residential PV projects, considering your situation.

Understanding the Factors Involved

Several factors influence the appropriate fee. It's not just about the stamp; it's about the professional liability and time investment. Complexity of Projects

Are these straightforward, cookie-cutter installations, or are there variations in roof types, system sizes, and electrical configurations? More complex projects demand more review time.


Your Experience and Reputation

An engineer with a long-standing reputation and specialized PV experience can command a higher fee.

Local Market Rates

What are other professional engineers in your area charging for similar services? Research is essential.


Legal Liability

Stamping a drawing means you're taking responsibility for its accuracy and safety. This is a significant liability. Your professional liability insurance premiums are directly related to this risk.

Review Time

How long does it
actually take you (or your team) to thoroughly review a set of plans? Factor in time for communication with the installer/designer if corrections are needed. Be realistic about this! Time = Money.

Software and Overhead

Do you need to invest in any specific software to review plans effectively? Consider your overhead costs (office space, insurance, etc.).

Volume Discount

Since your company is handling a large volume (50+ deals/month), you can offer a discounted rate compared to a one-off project. This encourages the company to stay with you, but it shouldn't undervalue your services.


Scope of Work

Be very clear about what you are reviewing and stamping. A well-defined scope of work will protect you from scope creep and prevent misunderstandings. Is it only the architectural and electrical drawings for PV, or are you also responsible for structural calculations, load analysis, and other engineering aspects? Make sure it's clearly defined in a contract.

Jurisdictional Requirements

Different municipalities or states might have specific requirements that increase the complexity of your review.

Possible Pricing Models


Here are a few pricing models you could consider:1. Per-Project Flat Fee



Pros

Simple to understand and administer. Predictable income for you and predictable cost for the company.

Cons

Doesn't account for project complexity. You might lose money on complicated projects and overcharge on simple ones.


Implementation

Establish different flat fees based on system size (e.g., under 5kW, 5-10kW, over 10kW) or project complexity (simple roof mount vs. integrated system on a complex roof). This is probably the most common approach.2.

Hourly Rate



Pros

Fairly compensates you for the actual time spent.


Cons

Difficult for the company to budget, as the cost can vary significantly. Requires detailed time tracking. Can be perceived as expensive.

Implementation

Set an hourly rate and track your time meticulously. Provide the company with regular updates on the hours spent on each project.3.

Tiered Pricing



Pros

Balances simplicity with flexibility.

Cons

Requires some initial effort to establish the tiers.


Implementation

Create tiers based on system size, roof complexity, and electrical complexity. Each tier has a fixed price.4.

Hybrid Model



Pros

Combines the benefits of different models.


Cons

Can be more complex to administer.

Implementation

A combination of hourly work for non-standard services and a fixed rate for standard services.

Determining a Fair Price Range


Because I don't know your location, experience level, or the specifics of the projects, I can't give you a precise number. However, here's a framework:1. Research Local Rates

Call or email other engineering firms in your area that offer similar services. Ask for a quote for stamping residential PV plans. This will give you a good starting point. Use online directories like the National Society of Professional Engineers (NSPE) or the American Council of Engineering Companies (ACEC) to find local firms. Look for firms that specialize in electrical or renewable energy.2.

Estimate Your Time

Do a time study. Review a few typical plans from this company and meticulously track how long it takes you to complete the review and stamping process. Factor in time for communication with the installer.3.

Calculate Your Costs

Hourly Rate: Let's say you need to earn $150/hour to cover your salary, benefits, and overhead. Assume each project takes 2 hours (this is just an example – your time study will provide a more accurate number). Your base cost per project is $300. Add a percentage for profit (e.g., 20%): $300 + $60 = $360. Therefore, you might start with a flat fee of $360 per project.4.

Adjust for Volume

Since you have a high volume, you can offer a discount. Maybe reduce the flat fee by 10-20%.5.

Consider Liability

Make sure your professional liability insurance covers this type of work. Factor the cost of insurance into your rate.

Example Scenario

Local market rate for stamping residential PV plans: $300 - $600 per project. Your estimated review time: 2 hours per project. Your desired hourly rate: $150/hour. Volume discount (15%): Possible flat fee per project: $150/hour 2 hours = $300. $300 - 15% =

$255 per project.
Important Considerations



Contract

Have a clear written contract with the company outlining the scope of work, your responsibilities, the payment terms, and liability limitations. Have the contract reviewed by an attorney specializing in engineering contracts.


Insurance

Ensure you have adequate professional liability insurance (errors and omissions insurance) to cover PV projects. Discuss the scope of your work with your insurance provider.

Delegation

If you delegate any of the review work to other engineers in your company, ensure they are qualified and properly supervised. You are still ultimately responsible for the stamped drawings.


Documentation

Keep meticulous records of your reviews, including checklists, notes, and communications with the installer. This documentation can be crucial in case of a future dispute.*

Ongoing Monitoring

Regularly review your pricing and adjust it as needed based on changes in market conditions, project complexity, or your costs.

Actionable Steps


Research local rates.
2. Conduct a time study on sample plans.3. Calculate your costs (hourly rate, overhead, insurance).4. Determine a pricing model (flat fee, hourly, tiered).5. Offer a volume discount.6. Draft a clear contract.7. Consult with an attorney and your insurance provider.

By carefully considering these factors and following these steps, you can determine a fair and sustainable price for your services. Good luck! Flag for review

Previous Question Next Question