Question: I have a large project with exposed RMC that enter N3R enclosures with approved hubs the local Electrical inspector say I have to install drains on all conduits per Art 314.15.

Okay, let's break down this situation and address the electrical inspector's interpretation of NEC 314.15 regarding your RMC conduits entering NEMA 3R enclosures.

Understanding the Code: NEC 314.15 - Damp or Wet Locations

NEC 314.15 states:"In damp or wet locations, boxes, conduit bodies, and fittings shall be placed or equipped so as to prevent moisture from entering or accumulating within the box or conduit body. Boxes, conduit bodies, and fittings shall be listed for use in wet locations where installed in wet locations." Key Phrase 1: "Prevent moisture from entering or accumulating..." This is the heart of the matter. The code aims to prevent water from getting inside the enclosure and/or the conduit system. Key Phrase 2: "Listed for use in wet locations..." This emphasizes using appropriate equipment when in wet locationsNEMA 3R Enclosures: Rainproof, Not Waterproof

NEMA 3R enclosures are designed to provide a degree of protection against rain, sleet, snow, and dripping water. They are not intended to be continuously submerged or subjected to direct water spray from all directions. The code also calls for these to be installed such that water can drain.

RMC and Approved Hubs: Sealing Capabilities RMC Conduit

Rigid Metal Conduit, when properly installed with listed fittings, provides a robust and often weathertight raceway.


Approved Hubs (Specifically for Wet Locations)

Hubs listed for wet locations are designed to seal the connection between the conduit and the enclosure, preventing water ingress when properly installed.

This is crucial.
The Inspector's Stance (and Potential Challenges)

The inspector's interpretation seems to be that because you have RMC entering NEMA 3R enclosures in a damp or wet location, you automatically need to install drains. While it is true that NEMA 3R enclosures are required to be mounted in such a way that water drains out, the inspector's stance might be overly broad in a few ways:1. The Sealing of Approved Hubs

High quality, properly installed hubs listed for wet locations are designed to keep moisture out. So, while the enclosure must allow water to drain, the conduit system might not need it.2.

Is it truly a "wet location"

There's a difference between a location exposed to rain and one subjected to constant submersion or other extreme wet conditions.

Your Course of Action: A Phased Approach


Here's a recommended strategy for addressing this situation:1. Clarify the Definition of "Wet Location"

Talk to the inspector and get clarification about what criteria constitute a "wet location" in their interpretation. This helps determine if your specific installation genuinely falls under the wet location category.2.

Document Hub Listings and Installation

Gather documentation showing that the hubs you are using are indeed listed for wet locations and that they are installed according to the manufacturer's instructions. Present this information to the inspector.3.

Demonstrate Sealing Capabilities

If possible, provide evidence that the hubs, when properly installed with RMC, create a seal that prevents water from entering the enclosure. This could involve manufacturer specifications, testing data, or even a demonstration.4.

Propose an Alternative (If Appropriate)

If the inspector remains firm, propose an alternative solution that achieves the same level of protection without necessarily requiring drains on every conduit. This might involve: Using sealing locknuts on the inside of the enclosure. Ensuring proper conduit slope to allow any condensation to drain away from the enclosure. Using a sealant around the conduit entry point.5.

Seek a Second Opinion

If you are unable to reach an agreement with the inspector, consider seeking a second opinion from another qualified electrical inspector or a code expert. Sometimes, a different perspective can help resolve the issue.6.

Appeal the Decision

Most jurisdictions have a process for appealing an inspector's decision. If all other avenues fail, this may be your final option.

Important Considerations



Safety First

Always prioritize safety and compliance with the electrical code.

Documentation

Keep thorough records of all communications with the inspector, documentation of your equipment, and any alternative solutions you propose.


Manufacturer Support

Contact the manufacturer of your hubs and enclosures for technical support and documentation to support your case.

Example Communication with the Inspector

"Good morning/afternoon [Inspector's Name]. We're working on the [Project Name] project and appreciate your feedback on the RMC conduit entries into the NEMA 3R enclosures. We'd like to clarify a couple of points regarding NEC 314.15 and the requirement for drains on each conduit.First, could you clarify your definition of a "wet location" in the context of this project? We understand the intent is to prevent moisture from entering the enclosures.Second, the hubs we're using are specifically listed for wet locations and, when properly installed per the manufacturer's instructions, are designed to create a seal that prevents water ingress. We have documentation from [Manufacturer Name] confirming this [Provide documentation or a link to the documentation].We're open to discussing alternative solutions that ensure compliance with the code while minimizing the need for drains on every conduit, such as..."

In Summary


The inspector's interpretation could be valid, but it's essential to examine the specifics of your installation, the sealing capabilities of your hubs, and the actual conditions of the location. Approach the situation with clear communication, documentation, and a willingness to explore alternative solutions that meet the intent of the NEC. Remember, the goal is to ensure a safe and compliant installation. Flag for review