Question: Hi Everyone,We had a project for a 3-story building a few years ago. Client now wants to expand the building with another smaller 3 story building connected by outdoor hallways in each level. Do I need to provide a grounding system in first floor electrical room, or can be bonded to the existing main electrical room grounding system?Thank you.

Okay, let's break down the grounding requirements for your building expansion. Here's a structured approach to figure out what you need to do, considering code requirements and best practices

Key Considerations:
National Electrical Code (NEC) Compliance

The NEC is your primary guide. We'll refer to specific sections to help you understand the requirements. (This is assuming you're in the USA. If you're in another country, replace NEC with your local electrical code.)


Separately Derived System (SDS) vs. Expansion of Existing System

This is the crux of the matter. Is the new building being fed by a separate service/transformer, or is it a direct extension of the existing system?

Grounding Electrode System (GES)

This is the network of grounding electrodes (ground rods, building steel, etc.) that provides a low-impedance path to earth.


Bonding

Connecting different metallic parts together to create an electrically conductive path, ensuring they are at the same potential.

Safety

The primary goal of grounding and bonding is safety – to protect people and equipment from electrical shock and fire hazards.

Here's a step-by-step approach to determine your grounding needs


Determine the Power Source for the New Building



Is the New Building Fed Directly from the Existing Electrical Service/Distribution Panel?
If yes, then it's likely considered an expansion of the existing system, not a separately derived system. Is the New Building Fed by a Separate Service Entrance or a New Transformer (Separately Derived System)? If yes, then you will need a grounding electrode system at the new building.2. If Fed Directly from the Existing System (Likely Scenario)



Bonding is Key

Since you're feeding the new building from the existing system, the focus is on proper bonding between the two buildings. This ensures a low-impedance fault current path back to the source.

NEC 250.32 (Buildings or Structures Supplied by a Feeder(s) or Branch Circuit(s))

This section applies when you are supplying a building from another building.


NEC 250.32(B) (Grounded Systems)

This is the relevant section for most situations. It states that the grounding electrode system (GES) of the original building is sufficient for the new building. You DO NOT need to establish a new GES in the new building.

Grounding Electrode Conductor (GEC)

Run a grounding electrode conductor (sized per NEC Table 250.66) from the grounding bus in the first disconnect of the new building to the grounding electrode system (GES) of the existing building. This ensures the new building is effectively grounded.


Equipment Grounding Conductor (EGC)

A properly sized equipment grounding conductor must be run with the feeder or branch circuit conductors from the existing building to the new building. This provides a fault current path to trip the overcurrent protective device in the event of a fault. The EGC must be sized according to NEC Table 250.122.

Metal Raceways/Conduit

All metal raceways (conduit, cable trays, etc.) that connect the buildings must be properly bonded to the grounding system. This helps maintain a low-impedance fault current path.


Outdoor Hallways

The metal structure of the outdoor hallways, as well as any exposed non-current-carrying metal parts in the hallways (light fixtures, etc.), should be bonded to the grounding system.3.

If Fed by a Separate Service or Transformer (Separately Derived System)



NEC 250.30 (Grounding Separately Derived AC Systems)

This section applies.


Grounding Electrode System (GES)

You must establish a grounding electrode system at the new building. This typically includes:

Ground Rods

Driven into the earth.


Building Steel

If the building has a metal frame, it can be used as a grounding electrode.

Concrete-Encased Electrode (Ufer Ground)

If the building has a concrete foundation, a Ufer ground can be used.


Other Approved Electrodes

As per NEC 250.52.

Grounding Electrode Conductor (GEC)

Connect the neutral point (usually the X0 terminal of the transformer) to the grounding electrode system with a properly sized GEC (per NEC Table 250.66).


System Bonding Jumper (SBJ)

Bond the neutral point of the transformer to the equipment grounding bus in the first disconnecting means.

Equipment Grounding

All equipment must be properly grounded back to the grounding bus.

Important Considerations for Outdoor Hallways



Exposed Metal

Pay close attention to any exposed metal parts in the outdoor hallways. These must be bonded to the grounding system to prevent shock hazards. This includes: Metal frames of the hallways Light fixtures Handrails Any other metallic components

Weather Protection

Use grounding and bonding connectors that are suitable for outdoor use (rated for wet locations).

Recommendations



Consult with a Licensed Electrical Engineer

This is highly recommended. A qualified engineer can perform a thorough evaluation of your existing system, assess the new building's electrical needs, and design a grounding and bonding system that meets all applicable codes and standards. They can also provide stamped drawings for permitting.

Pull Permits

Obtain all necessary electrical permits before starting any work. This ensures that your installation is inspected and approved by the local authorities.


Document Everything

Keep detailed records of all grounding and bonding connections, including conductor sizes, locations, and inspection results.

Ground Resistance Testing

Consider performing ground resistance testing to verify the effectiveness of your grounding electrode system (especially if you are installing a new GES).

In summary



Likely Scenario (Fed from Existing System)

Focus on proper bonding between the two buildings using a correctly sized grounding electrode conductor and equipment grounding conductor. Ensure all metal parts are bonded.*

Separate Service/Transformer

A new grounding electrode system is required at the new building.

Disclaimer:
I am an AI Chatbot. This information is for general guidance only and does not constitute professional engineering advice. Always consult with a qualified and licensed electrical engineer for specific design and installation requirements. You are responsible for complying with all applicable codes and regulations. Flag for review