Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: Bonding of all normally non current carrying metal parts within 5’ of the edge of an indoor spa question

User: 2l84me1, Location: Florida

Asked on: Saturday, March 29, 2025 at 6:02 pm EDT
Answered on: Saturday, March 29, 2025 at 6:02 pm EDT

Question: I have a customer who wants power ran to a hot tub located in their screened in porch enclosure. The framing/flashing of the screened in porch & the roof is sheet metal.Would it be acceptable to bond these metal parts together then terminate it into the 50a sub panel feeding the spa?Thanks

Okay, this is a situation where a clear understanding of electrical codes and best practices is crucial. Here's a breakdown of the considerations and a possible approach

Key Concerns & Code Considerations
Bonding vs. Grounding

It's vital to differentiate between bonding and grounding.


Bonding

Connecting metallic parts to create an electrically conductive path with low impedance. The goal of bonding is to create an equipotential plane. During a fault, this helps ensure that all metallic parts in that area rise to the same voltage, minimizing the shock hazard.

Grounding

Connecting the electrical system to the earth. This helps to stabilize voltage and provide a path for fault current to flow back to the source, tripping the breaker/GFCI.


Hot Tub Requirements (NEC Article 680)

The National Electrical Code (NEC) Article 680 is very specific about hot tub installations. It covers bonding, grounding, GFCI protection, clearances, and more. You must adhere to Article 680.

Screened Enclosure as "Within the Vicinity of" the Hot Tub

Even though it's a screened enclosure, the screened-in porch surrounding a hot tub is typically considered "within the vicinity" of the hot tub. This triggers bonding requirements for metal parts within that area.


Sheet Metal Concerns

Sheet metal can be problematic for bonding.

Surface Area & Conductivity

Sheet metal, particularly if painted or coated, may not provide a reliable, low-impedance bonding path on its own. The connections must be mechanically strong and electrically sound.


Corrosion

Sheet metal is prone to corrosion, especially when exposed to moisture (common with hot tubs). Corrosion can quickly degrade bonding connections.

Subpanel Grounding

The 50A subpanel needs to be properly grounded back to the main service panel. This is usually done with a 4-wire feed (2 hots, 1 neutral, and 1 grounding conductor) from the main panel.

The grounding conductor must
not be connected to the neutral at the subpanel.
This is a very common error and a serious safety hazard. GFCI Protection

All 120 volt receptacles, all 120 and 240 volt hardwired equipment within 5 ft of the inside wall of the spa must be GFCI protected

Recommended Approach
1. Consult NEC Article 680 and Local Amendments

This is the absolute starting point. Read it carefully. Also, check with your local electrical inspector for any local amendments or interpretations of the code.2.

Bonding the Enclosure (with Caveats)

IF the screened enclosure is within the "vicinity" as defined by the NEC, you likely need to bond the metal components. However, the sheet metal construction requires careful consideration:

Direct Bonding

Use solid copper bonding conductors (typically #8 AWG) and approved bonding clamps or connectors
directly attached to the metal framing members of the enclosure.

Avoid Sheet Metal Screws

Do not rely solely on sheet metal screws to make the bonding connections. Screws can loosen or corrode.

Clean Metal

Remove paint or coatings at the bonding locations to ensure good metal-to-metal contact. Apply an anti-oxidant compound (like No-Ox-Id) to the cleaned surfaces before making the connection.


Bonding Grid (Possibly)

Depending on the size and complexity of the enclosure, it may be necessary to create a bonding grid using multiple bonding conductors interconnected throughout the enclosure.

Consider Alternatives

If the sheet metal is thin, heavily coated, or structurally questionable, consider running a separate, continuous copper bonding conductor along the inside of the enclosure and securely attaching it to the structural members. This provides a more reliable bonding path.3.

Connection to Subpanel



Bonding Terminal

Run the bonding conductor from the enclosure to the grounding terminal (equipment grounding bus) inside the 50A subpanel. Do not connect it to the neutral bus.

Subpanel Grounding

Ensure the subpanel itself is properly grounded back to the main service panel using a dedicated grounding conductor (typically #8 AWG or larger, depending on the feeder size).4.

Hot Tub Bonding Lug

Connect the bonding conductor(s) from the enclosure to the
external bonding lug on the hot tub itself. This is a critical requirement of Article 680. You will also need to bond the metal parts of the tub together. Pump housings, metal pipes, etc.
5.


GFCI Protection

The hot tub circuit must be protected by a GFCI breaker. Any 120V receptacles within a certain distance of the hot tub (check NEC for specific distances) must also be GFCI protected.

Important Considerations & Warnings



Electrical Permit & Inspection

Obtain an electrical permit and have the work inspected by a qualified electrical inspector. This is essential for safety and code compliance.

Qualified Electrician

This work should be performed by a licensed and experienced electrician familiar with NEC Article 680 and hot tub installations. Improper installation can be dangerous or even fatal.


Manufacturer's Instructions

Follow the hot tub manufacturer's installation instructions carefully.

Corrosion Protection

Use corrosion-resistant bonding connectors and apply anti-oxidant compounds to all connections to minimize corrosion.


Do Not Rely on the Screen Material

The screen mesh itself is not a reliable bonding conductor and should not be used as such.*

Potential for Stray Currents

If there are other metallic parts in the vicinity (e.g., metal fences, gas pipes), consider the potential for stray currents and consult with an electrician or engineer about proper bonding and grounding.

In Summary

Bonding the metal enclosure is likely necessary if it's considered within the vicinity of the hot tub. However, because the enclosure is sheet metal, it must be done carefully and correctly. Get the proper bonding clamps and connect to structural members. Run a copper bonding wire back to the grounding bus in the spa sub-panel. Ensure the spa subpanel is also ran with a separate ground wire to the grounding buss in your main electrical panel. The spa needs to have it's own GFCI breaker.

Disclaimer:
I am an AI chatbot and cannot provide professional electrical advice. The information above is for informational purposes only and should not be considered a substitute for the advice of a qualified electrician. You are responsible for ensuring that all electrical work is performed in accordance with applicable codes and regulations. Flag for review

Previous Question Next Question