Question: I have an interesting question that came up with some vendors equipment. It is a small wall mounted industrial control panel with a rotary disconnect operator mounted through the side. The question came up if there was a required distance between disconnect operator and an adjacent panel. My interpretation is that since the actual electrical disconnect is in the control panel and the door of the panel has the 110.26 required clearance that there is no specific clearance required for the operator. So the result was that enough space was needed to properly operate the disconnect and perform LOTO on it but 36" was not needed on the side.I am interested if anyone knows of something I missed or could cite any code to the contrary.

You've essentially hit the nail on the head with your assessment. There isn't a specific code requirement dictating a 36" clearance around a disconnect operator itself, especially when the actual disconnect is housed within a panel and the working clearances are maintained at the panel door.Here's a breakdown of why your interpretation is likely correct, and what to consider: NEC Focuses on Working Space at Equipment Requiring Examination, Adjustment, Servicing, or Maintenance (EASM)

NEC 110.26 is the key. It dictates working space requirements
around electrical equipment that is likely to require examination, adjustment, servicing, or maintenance while energized. The disconnect switch inside the enclosure falls under this category, and the clearance is necessary in front of the panel door when it's open.

Disconnect Operator is Primarily a Mechanical Actuator

The handle extending through the side of the enclosure is primarily a mechanical actuator. Its purpose is to remotely operate the disconnect. It's not considered equipment requiring EASM while energized itself. The 'work' (of opening/closing the disconnect) is happening inside the enclosure.

LOTO and Operability

You are correct to consider LOTO and operability. Sufficient space
must be available to operate the disconnect easily and safely, and to apply any necessary lockout/tagout devices. This is more of a practical consideration and OSHA requirement (29 CFR 1910.147) than a strictly NEC clearance requirement. The amount of space needed might depend on the size of the operator handle, the type of LOTO device used, and the dexterity required. But this operability distance is likely much less than 36".

Manufacturer's Instructions

Always check the manufacturer's instructions for the disconnect switch and the control panel. They might have specific recommendations regarding clearances around the operator, although this is rare.

Possible Scenarios Where Clearances Might Be an Issue (but are less likely)



If the disconnect operator is also a visual indicator of the disconnect's state (e.g., a window showing the position of the switch contacts)

In this
specific case, one could argue that someone might need to examine the operator to determine the disconnect's status. However, even here, I'd still argue that the clearance is primarily for LOTO and operability, not a full 110.26 clearance. The code is intended for energized work, and viewing a switch position isn't energized work.

Local Amendments

While unlikely, check for any local amendments to the NEC that might specifically address clearances around disconnect operators.

Accessibility for Persons with Disabilities

While not a pure electrical code issue, consider accessibility requirements (ADA) if the equipment is in a publicly accessible location.

In summary

You're correct to focus on the working clearances at the panel door (per 110.26) and to prioritize sufficient space for safe and convenient operation and LOTO of the disconnect. A blanket 36" clearance around the
operator* itself is not generally required by the NEC. Document your assessment, especially the rationale for sufficient operability and LOTO space, and retain the manufacturer's instructions.

Disclaimer:
This is an interpretation based on the information provided. A final determination rests with the Authority Having Jurisdiction (AHJ) on your specific project. Always consult with the AHJ for definitive rulings. Flag for review