Question: Hello,I have done service upgrades before but with the code changes and PG&E changes of how they are processing service upgrades, I would like to know if this install would be ok. Would love to know other alternatives or suggestions. Others have brought up using a switch gear but I think it might be overkill for this application.https://flic.kr/p/2rdik4a
Okay, let's break down your service upgrade concerns, considering code changes, PG&E requirements, and potential alternatives. I'll do my best to give you actionable advice without seeing the details, since I can't physically inspect the project or see the photos.
Disclaimer
I am an AI assistant and cannot provide legally binding electrical advice. All advice is for informational purposes only and should be verified by a qualified, licensed electrician in your jurisdiction. Always adhere to local codes and regulations.
Assumptions
You are upgrading the service to increase the available amperage/power to the building. You are in PG&E territory (California). You have a basic understanding of electrical concepts like amperage, voltage, service conductors, etc.
General Considerations (Based on Common Code and PG&E Practices)
Permitting
PG&E requires a permit from the local jurisdiction before they will connect the new service. Don't skip this step!2.
NEC Compliance
The National Electrical Code (NEC) is the foundation. Your local jurisdiction likely uses a modified version of the NEC. You must comply with your local code. Key areas to consider:
Service Disconnect Rating
The overcurrent protection device (usually a breaker) at the main service disconnect must be rated appropriately for the calculated load.
Service Conductor Size
The conductors feeding the service disconnect must be sized according to the calculated load and meet NEC ampacity requirements, considering derating factors (temperature, number of conductors in a raceway, etc.).
Grounding and Bonding
Proper grounding is critical. This includes the grounding electrode system (ground rods, water pipe bond, etc.) and bonding of all metal enclosures, raceways, and equipment. Often the grounding electrode conductor is size by the size of the service entrance conductors.
Working Space
Adequate working space (clearance) in front of the service equipment is required. Check NEC 110.26.
Enclosure Types
The enclosures (meter socket, service panel) must be rated for the environment (indoor/outdoor, wet/dry).
Overcurrent Protection Coordination
The overcurrent protection devices (breakers or fuses) must be properly coordinated to ensure selective tripping. This means that a fault closer to the load should trip before the main service breaker.3.
PG&E Specific Requirements
PG&E has its own "Green Book" (or equivalent) that details their requirements for service connections. You must adhere to these rules. Key areas:
Meter Socket Approval
PG&E has a list of approved meter sockets. You can't just use any random meter socket.
Service Entrance Conductor Termination
PG&E specifies how the service conductors must be terminated at the meter socket.
Clearance Requirements
PG&E has specific clearance requirements for the meter socket and service conductors from the ground, building features, etc.
Disconnect Location
PG&E may dictate the location of the service disconnect. They may want it outside and readily accessible.
Inspection
PG&E will inspect the service before they connect it.
Possible Issues (Without Seeing Your Specific Plan)
Load Calculation
The most common mistake is underestimating the load. You must perform a thorough load calculation according to NEC Article 220. Consider: General lighting and receptacle loads Appliance loads (fixed appliances like water heaters, ranges, dryers, HVAC) Motor loads (motors require special calculations) Future expansion (it's always wise to add a buffer)
Conductor Sizing
Ensure that the service entrance conductors are sized appropriately for the calculated load and the overcurrent protection device. Don't forget derating factors. Aluminum conductors are often used for service entrances, but be sure to use appropriately rated connectors.
Grounding
Verify proper grounding and bonding throughout the system. Pay close attention to the grounding electrode system and the bonding of metal enclosures.
Service Disconnect Location
Is the location of the service disconnect acceptable to PG&E? They may require it to be outside.
Meter Socket
Is the meter socket PG&E-approved?
Short-Circuit Current Rating (SCCR)
All components in the service equipment (panel, meter socket, breakers) must have a short-circuit current rating (SCCR) equal to or greater than the available fault current at the service entrance. This is often overlooked.
Switchgear vs. Service Panel
The question of switchgear vs. service panel depends on:
Ampere Rating
Service panels typically top out at 400A. If you need a higher amperage rating (e.g., 600A, 800A, or more), you'll likely need switchgear.
Complexity
Switchgear is generally used for more complex systems with multiple feeders, metering, and protective devices.
Cost
Switchgear is significantly more expensive than a service panel.
Space
Switchgear takes up more space than a service panel.
When Switchgear Might Be Considered (But Perhaps Overkill)
Large Commercial or Industrial Buildings
These often require switchgear due to the high amperage requirements and complex distribution systems.
Multiple Tenants
If you have multiple tenants and need to separately meter their usage, switchgear with individual metering sections might be an option.
High Available Fault Current
If the available fault current at the service entrance is very high, switchgear might be necessary to meet the SCCR requirements.
Alternatives & Suggestions
Consult with PG&E
Talk to a PG&E engineer or representative before you start the project. They can provide valuable information about their requirements and help you avoid costly mistakes.2.
Engage a Qualified Electrical Engineer
For larger or more complex service upgrades, consider hiring a qualified electrical engineer to perform the load calculations, design the system, and ensure compliance with all applicable codes and regulations.3.
Submit Plans to the AHJ (Authority Having Jurisdiction)
Before starting the work, submit your plans to the local building department for review and approval. This will help you identify any potential issues early on.4.
Double-Check Everything
Before you request an inspection, double-check everything* to ensure it meets the code and PG&E requirements.5.
Consider Future Needs
When designing the service upgrade, consider future expansion. It's often more cost-effective to install a larger service now than to upgrade it again later.
In summary, ensure you have a solid load calculation, understand PG&E's requirements, comply with local codes, and properly size your conductors and equipment. When in doubt, consult with a qualified professional.
I'd be happy to provide more specific guidance if you can share more details about the existing service, the new load requirements, and your proposed plan.Good luck with your project! Flag for review