Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: Feeders passing through sections of service switchboard

User: Tainted, Location: New York

Asked on: Friday, August 8, 2025 at 1:41 pm EDT
Answered on: Friday, August 8, 2025 at 1:41 pm EDT

Question: There is a service switchboard with 2 sections which has service switches.The bottom service switch in section 2 has feeders going into section 1 of the switchboard.Are feeders from section 2 allowed to pass through section 1?See below picture

Yes, feeders from Section 2 are allowed to pass through Section 1 to reach their intended destination, provided the following conditions are met: Proper Insulation and Support

The conductors must be properly insulated and supported throughout their entire run, including within Section 1. They should not come into contact with any energized parts or create a hazard.


Clear Identification

The feeders must be clearly identified as belonging to Section 2. This prevents confusion and ensures that anyone working on the switchboard knows where the conductors originate.

No Overcrowding

The addition of the Section 2 feeders must not create an overcrowding situation within Section 1. There should be adequate space for proper ventilation and access for maintenance.


Manufacturer's Instructions

The manufacturer's instructions for the switchboard should be reviewed to ensure that this type of configuration is permitted. Some switchboards may have specific limitations or requirements.

NEC Compliance

The installation must comply with all applicable requirements of the National Electrical Code (NEC). This includes rules related to conductor ampacity, overcurrent protection, grounding, and physical protection.

Why This Is Generally Acceptable

Switchboards are often designed with multiple sections that are interconnected. It is not uncommon for conductors from one section to pass through another to reach their final destination. As long as the conductors are properly installed and the necessary safety precautions are taken, this type of configuration is generally acceptable.

Important Considerations



Short Circuit Current Rating (SCCR)

The SCCR of the switchboard assembly must be adequate for the available fault current at the point where the feeders enter Section 1.

Heat Dissipation

Overcrowding can lead to overheating. Ensure adequate ventilation to dissipate heat generated by the conductors.


Accessibility

Make sure access for maintenance and troubleshooting is not compromised by the added feeders.

In Summary:


Feeders from Section 2 are allowed to pass through Section 1, provided they are properly installed, identified, and do not create any safety hazards or violate any applicable codes or manufacturer's instructions. It is essential to consult with a qualified electrical engineer or electrician to ensure that the installation meets all requirements. Flag for review