Question: If there is a 200' run from gear to equipment and they want you to intercept the run at the 150' point(remainder of 50' run being demolished)and reroute the wire down to new equipment how would you pull put that 50' of wire so you can reroute if there's no pull box? We would have to put a pull box to install new conduit drops to the new equipment but before that point we need to pull out the 50' of wire. It's #500's.
Okay, this is a challenging scenario. Pulling 50' of 500 MCM cable through a 200' run, without a pull box and with one end fixed, is going to be tough. Here's a breakdown of how you might approach it, along with the challenges
Understanding the Problem:
500 MCM Cable
This is large, heavy, and has a large bend radius. Pulling it through conduit generates a LOT of friction.
200' Run
A long run significantly increases the friction and makes pulling incredibly difficult.
No Pull Box
This is the biggest impediment. Pull boxes are designed to break up long runs and reduce pull tension.
Fixed End
The equipment end is presumably terminated, meaning you can't just pull from both ends.
Demolition
The fact the 50' section is slated for demolition is slightly helpful; we can be a little less concerned about damaging it within reason.
Here's a potential strategy, breaking it down into steps
1. Assess the Conduit
Material
Is it rigid metal conduit (RMC), intermediate metal conduit (IMC), electrical metallic tubing (EMT), or PVC? RMC and IMC will generally be easier to pull through than EMT (because of couplings) or PVC.
Number of Bends
How many bends are in the 200' run? Each bend significantly increases friction. Note the radius of the bends. Small radius bends will be almost impossible to pull through.
Conduit Size
Is the conduit sized appropriately for 500 MCM? If it's undersized, you're fighting an uphill battle. Check the NEC or local codes for conduit fill requirements.
Conduit Condition
Is there any visible damage or corrosion inside the conduit? This can greatly increase friction.
2. Lubrication is KEY
Use a High-Quality Cable Lubricant
This is essential. Use a cable lubricant specifically designed for heavy cable pulls. Silicone-based lubricants are often a good choice. Apply it liberally to the cable as you attempt to pull. Lubricate as much of the cable as you can reach.
3. Attempt to Pull (with Caution)
Attach a Pulling Head
Use a properly sized and secured pulling head to the cable at the 150' mark (where you plan to cut). Make sure the pulling head is rated for the expected pulling force.
Use a Strong Pulling Device
You'll need a powerful pulling device. Consider these options:
Powered Cable Puller
These are specifically designed for pulling heavy cables. Rent one if you don't have access to one. A capstan winch can also be used to pull cables.
Come-Along (Hand Winch)
A heavy-duty come-along can provide some leverage, but be cautious not to exceed its load rating or damage the cable.
Monitor Pulling Tension
Very important! Use a dynamometer (tension meter) to monitor the pulling force. Exceeding the cable's maximum pulling tension will damage it. Consult the cable manufacturer's specifications for the maximum pulling tension. If the force required is too high, STOP. You risk damaging the cable or the conduit.
Pull Slowly and Steadily
Avoid jerky movements. Jerking puts excessive stress on the cable.
Communicate Clearly
If you're using multiple people, ensure clear communication.
Feed Lubricant
Have someone continuously feed lubricant into the conduit entrance as you pull.
"Rocking" Technique
If the cable is stuck, try gently "rocking" it back and forth. This can help break the friction. Do not force it.
4. If the Pull Fails (Most Likely Scenario)
This is where things get more complicated. If you can't pull the 50' of cable, you have a few options, none of which are ideal:
Cut the Cable and Abandon
This is often the most practical solution, especially given the demolition. Cut the cable at the 150' point. Install your pull box. Pull new cable from the gear to the new pull box. Pull new cable from the pull box to the new equipment location. Terminate everything properly.
Important
If you abandon the remaining 150' of cable in the conduit, ensure it is properly capped off and labeled as abandoned to prevent future hazards.
Try to Pull from the Other End (Requires Disconnection)
This is only an option if you can safely disconnect the cable at the gear end. If so, you might be able to push or pull the cable back the 150' to install the pull box and then reroute the wire.
Consider Using a Wire-Pulling Snake (Fish Tape) with Lubricant
This can sometimes help to clear obstructions or break the friction, especially if the conduit is relatively straight.
Important Safety Considerations
De-energize and Lockout/Tagout
Absolutely crucial. Ensure the circuit is completely de-energized and properly locked out/tagged out before starting any work. Verify with a multimeter. Personal Protective Equipment (PPE)
Wear appropriate PPE, including safety glasses, gloves, and steel-toed boots.
Qualified Personnel
This work should only be performed by qualified electricians with experience working with heavy cable.
Confined Space
If the conduit run is in a confined space, follow all applicable confined space entry procedures.
In summary, pulling 50' of 500 MCM cable through a 200' run of conduit with no pull box and one end terminated is extremely difficult and likely to fail. The best approach is to assess the situation carefully, try lubrication and gentle pulling techniques, and be prepared to cut and abandon the cable if necessary. Prioritize safety above all else. Cutting and replacing sections with new cable is the most reliable and often the safest and most cost-effective solution.
Before attempting any of this, get approval from the engineer or project manager. Explain the challenges and the potential for damaging the existing cable. It's better to have a clear plan and agreement before starting the work. Flag for review