Question: Hello,July 25. 2025 NYS adopted the Uniform Fire Prevention and Building Code and State Energy Conservation and Construction Code -which is 10 documents. The building code, Chapter 27, references the 2023 NEC. The 10 documents are + or- 7,000 pages in addition to the NEC. They are supposed to be referenced before referring to the NEC.September 27th, it will be ratified with a few months for a company filing will be permitted to use the 2017 or 2026. December 31. 2025 will most likely be the day when filing will be to 2026 only. We are only 3 years behind!!!To set this straight, there is a confusing portion to this if one is not accustomed to Regulatory ways. NY state referenced the 2024 ICC as reference. BUT the NYS documents are referenced as 2025, including the building code is NYS 2025. Do not reference the NYS 2020 documents after December 31. 2025
Okay, let's break down the information you've provided to clarify the timeline and code requirements for construction projects in New York State
Key Takeaways:
NYS Adoption
On July 25, 2025, New York State adopted the Uniform Fire Prevention and Building Code and the State Energy Conservation and Construction Code (a set of 10 documents).
Reference to ICC
While the NYS documents are referenced as 2025, they likely use the 2024 International Code Council (ICC) codes as their basis.
Chapter 27 and NEC
Chapter 27 of the NYS Building Code specifically references the 2023 National Electrical Code (NEC).
Hierarchy
The NYS adopted codes (the 10 documents, approximately 7,000 pages) are primary. You must consult and adhere to them before referring to the NEC.
Transition Period
After the ratification date (likely September 27th, 2025), there's a transition period.
Grandfathering of 2017 / 2020 / 2023 NEC
During the transition period, project filings may be permitted to use either the 2017, 2020, or 2023 NEC. After December 31, 2025, project filings will only be permitted to use the
2026 NEC (presumptively). Important note
Even during the transition period, compliance with the NYS Building Code (the 2025 documents referencing the 2024 ICC codes) is still mandatory.
No more 2020
After December 31, 2025, the NYS 2020 documents will no longer be valid for project filings.
In simpler terms
Consult the NYS 2025 Codes FIRST
These are the 10 documents that make up the Uniform Fire Prevention and Building Code and the State Energy Conservation and Construction Code. These are based on the 2024 ICC.2.
Electrical Work: Refer to the 2023 NEC
Chapter 27 of the NYS Building Code will reference the 2023 NEC for electrical work.3.
Deadlines
After December 31, 2025, you MUST use the NYS 2025 Codes AND the 2026 NEC for all new project filings. There is a transition period where companies can choose to use the 2017, 2020, or 2023 NEC - until December 31, 2025.
Important Considerations
Verify Ratification Date
Confirm the exact ratification date (September 27th, 2025 as per your information). This starts the transition period.
Local Amendments
Be aware that individual municipalities or jurisdictions within New York State may have their own amendments or additions to the state codes. Always check with the local building department for any local variations.
Training
With the adoption of new codes, training on the changes is highly recommended for all involved in the construction industry.
Official Documents
Always rely on the official published documents from the New York State Department of State and the ICC, not just summaries or interpretations.
Example Scenario
Let's say you're filing for a building permit in November 2025. During the transition period. You might be able to file using the 2017, 2020, or 2023 NEC for the electrical aspects of your project. Regardless of which NEC edition you use, you must still comply with all other requirements of the NYS 2025 Building Code and Energy Code.
Disclaimer: I am an AI chatbot and cannot provide legal or professional advice. Always consult with qualified building code officials, architects, engineers, and legal professionals for project-specific guidance. Flag for review