Question: Has anyone interconnected enphase in two different locations on one electric service? Like one in the main panel and one in the sub panel in the detached garage that is 50ish feet away? I believe the NEC is silent on the number of interconnections on one service, so long as you maintain the 120% rule, which I will. One major concern is whether I need an extra gateway/envoy or will the PLC be strong enough to capture the micros on the detached garage sub panel. (No other solar in the neighborhood.) Trenching in the yard will be very expensive in this situation.

You're asking a good question about a situation that requires careful consideration of both electrical code and system performance. Here's a breakdown of the key factors and considerations

NEC Compliance and Interconnection:
120% Rule

As you mentioned, the 120% rule is a primary concern. You need to ensure the combined output of
all inverters connected to your service, whether at the main panel or the sub-panel, doesn't exceed 120% of the busbar rating to which they're connected. This rule is in place to prevent overloading the panel.

Crucially, this applies to BOTH the main panel AND the subpanel.
Multiple Interconnections

The NEC generally doesn't explicitly forbid multiple points of interconnection on a single service, provided you adhere to the 120% rule, conductor sizing, overcurrent protection, and all other relevant code requirements. This is where a thorough load calculation and single line diagram are essential.

Local AHJ

This is
extremely important.

Always consult your local Authority Having Jurisdiction (AHJ) (i.e., your city/county building department/electrical inspector)
before proceeding.
They may have local interpretations or amendments to the NEC that could affect your plans. They are the ultimate authority on whether your proposed installation is permissible. Tell them about your proposed setup before you start. Backfeed Protection

Ensure proper backfeed protection is in place for both the main and sub panels. This may involve specific breaker types, transfer switches, or other measures depending on your location's requirements and your overall system design.

Enphase System Considerations



Envoy/Gateway

This is the critical point. Enphase microinverters communicate with the Envoy (now called Gateway) using PLC (Power Line Communication).

Whether a single Envoy can reliably communicate with microinverters in a detached garage 50 feet away depends on several factors



PLC Signal Strength

PLC uses your electrical wiring as a communication medium. Signal strength can be significantly affected by:

Distance

50 feet is a potentially significant distance for PLC.


Wiring Quality

The type and condition of your wiring can impact PLC signal quality. Old or poorly installed wiring can attenuate the signal.

Electrical Noise

Other appliances and devices on your electrical system can generate noise that interferes with PLC communication. Think about motors, lights, and electronic devices.


Metal Conduit

Running the wiring in metal conduit can significantly attenuate the PLC signal.

Number of Branch Circuits

The PLC signal needs to traverse from the microinverter, to the branch circuit, to the panel, to the feeder cable connecting main and subpanels. The more branch circuits it travels, the greater signal loss.


Number of Microinverters

The number of microinverters at the garage sub-panel may also play a role. A larger array might provide a slightly stronger signal.

Phase Balancing

The distance and configuration of your electrical system can affect phase balancing. Imbalances can impact PLC performance.


Solution - Most Likely: Additional Gateway/Envoy

The most reliable and recommended solution is likely to install a second Enphase Gateway at the detached garage. This ensures a strong, dedicated PLC connection for the microinverters in that location. While it adds cost, it avoids potential communication problems and data loss.

Alternatives to Consider (Less Reliable)



Enphase Wireless Communications Kit

Enphase offers a wireless communications kit that could potentially extend the range of the Gateway's communication to the microinverters in the garage. However, the reliability of a wireless solution is highly dependent on environmental factors and potential interference. This is not PLC based.

Enphase IQ System Controller 2

This device, designed for backup scenarios and storage, also supports communications with Envoy and may be an option to centralize your monitoring. (You'll still probably need an additional Envoy at the garage).


PLC Repeaters/Extenders (Generally Not Recommended for Enphase)

In theory, some PLC extenders could boost the signal. However, compatibility with the specific PLC protocol used by Enphase is not guaranteed, and they may not work reliably. Enphase typically doesn't recommend third-party PLC extenders.

Recommendations


Consult with a Qualified Enphase Installer

The best course of action is to consult with a licensed and experienced Enphase installer. They can assess your specific site conditions, perform signal strength testing, and recommend the optimal configuration. They will also be familiar with local codes and permitting requirements.2.

Load Calculations and Single-Line Diagram

Ensure you have accurate load calculations for both your main panel and sub-panel. A single-line diagram is essential for visualizing the entire electrical system and ensuring it meets code requirements.3.

AHJ Consultation

Discuss your proposed system with your local AHJ before starting any work. Get their approval and any specific requirements they may have.4.

Thorough Testing

If you decide to try using a single Envoy, perform thorough testing after installation to verify reliable communication between the Envoy and all microinverters. Monitor the system for data gaps or communication errors. Be prepared to add a second Envoy if necessary.5.

Cost-Benefit Analysis

Carefully weigh the cost of trenching versus the cost of an additional Envoy and the potential for communication issues with a single Envoy. In many cases, the reliability and peace of mind offered by a second Envoy is worth the extra expense.

In summary, while technically possible to interconnect in multiple locations, the reliability of the Enphase PLC communication over a 50-foot distance to a detached garage is questionable. A second Envoy at the garage is the most reliable solution. Always consult with a qualified installer and your local AHJ before proceeding.