Question: Hi MikeEvery body talk about Romex can’t be use above a third floor in any building, but I don’t find anything like that on the NEC, I ask AI and said that is an old rule already removed. Would you please clarify that for me.Location Miami Florida

Okay, let's clarify the situation regarding Romex (NM cable) and its use in multi-story buildings, specifically in Miami, Florida.

The Key Issue: Building Codes vs. the NEC NEC (National Electrical Code)

The NEC is a widely adopted
model code. It sets the minimum standards for safe electrical installations. The NEC does address NM cable in high-rise buildings.

Local Building Codes (Like Miami-Dade County Code)

These are what matters in your specific location. Local jurisdictions adopt and amend the NEC to suit their local conditions, concerns, and priorities. They can add restrictions that are stricter than the NEC.

Understanding the NEC's Position on NM Cable


The NEC does allow NM cable to be used in certain types of multi-family dwellings, but with limitations: NEC 334.10(3)

This section of the 2023 NEC (and similar sections in previous editions) allows NM cable in Type III, IV, and V construction, which are generally buildings with some level of non-combustible elements,
but only in buildings not exceeding three stories above grade.

This is the basis for the "three-story" rule.
Key Considerations within the NEC



Type III, IV, and V Construction

These refer to the
fire resistance rating of the building's structural elements (walls, floors, etc.). Type V is typically the least fire-resistant and Type III slightly better. Type I and II are more robust and require noncombustible construction.

Smoke Detectors and Sprinklers

The presence of a fire sprinkler system often changes the allowance, and that is why you may see some exceptions.

Concealed vs. Exposed

NM cable is typically for concealed wiring within walls and ceilings.

Why the "Rumor" and Why It Persists


The "Romex above the third floor" rule is so persistent because:1. It
was a common restriction

Many older local codes
did have this restriction, and some still do. It was a way to address fire safety concerns in taller buildings by requiring more robust wiring methods.2.

It's a safe assumption

For many electricians, rather than researching the specific local code for
every job, they play it safe and assume Romex is not allowed above three stories unless proven otherwise.3.

General Safety Concern

Romex is inherently more vulnerable to physical damage and fire propagation compared to metallic conduit or cable types like MC cable.

Your Specific Situation: Miami, Florida (Miami-Dade County)
Crucially Important

You must consult the current Miami-Dade County Building Code (and any relevant amendments) to determine the actual restrictions on NM cable in your area.

How to Check



Miami-Dade County Building Department Website

This is the best place to start. Look for the adopted building code and any local amendments related to electrical work. Search for sections related to "wiring methods," "NM cable," "Romex," "multi-family dwellings," and "high-rise buildings."

Contact the Miami-Dade County Building Department

Call or visit the building department and ask them directly about the use of NM cable in multi-story residential buildings. They will be able to provide you with the most accurate and up-to-date information.


Consult a Local Electrical Inspector

An electrical inspector working in Miami-Dade County will know the local rules inside and out.*

Experienced Local Electrician

A licensed electrician who regularly works on multi-family projects in Miami will also be familiar with the current regulations.

In summary


AI can provide general guidance, but it cannot give you the specific requirements for your project in Miami. The NEC provides the foundation, but the local Miami-Dade County Building Code is the final authority. Always verify local codes before starting any electrical work. Flag for review