Topic: Equipotential bonding around pool

User: JoeNorm, Location: WA

Asked on: Wednesday, September 3, 2025 at 10:09 am EDT
Answered on: Wednesday, September 3, 2025 at 1:42 pm EDT

Question: I have completed the bonding grid around a new pool with a combination of rebar and #8 solid wire. There are already (3) #8 stranded and insulated wires coming into light niches from the supply panel.My final wiring to complete is at the cover motor area, I have a #8 solid exposed here that is part of the grid. There are a few raceways back to the panel.Do I need to bring another stranded #8 here? Or is the #12 EGC that will come with the cover motor wiring enough? I can't imagine I should bring a solid wire all the way here but it would not be impossible.thanks for the suggestions

Okay, let's break down the bonding requirements for your pool cover motor and how it interacts with your existing bonding grid. This is crucial for safety and needs to be done according to the National Electrical Code (NEC).

Understanding the Requirements Bonding Grid

The purpose of your bonding grid (rebar and #8 solid wire) is to create an equipotential plane around the pool. This minimizes voltage differences and reduces the risk of electric shock.


Equipment Bonding Conductor (EGC)

The EGC (likely the #12 wire included with your cover motor) is a separate wire that runs with the circuit conductors (power and neutral) to provide a low-impedance fault current path back to the panel. This allows a breaker to trip quickly in the event of a fault.

Purpose of Bonding to Motor



Supplemental Bonding

NEC 680.26(C) requires all metal parts of the pool structure, including electrical equipment associated with the pool, to be bonded to the equipotential bonding grid.

Analysis of Your Situation
1. Existing Bonding Grid

You have a proper bonding grid constructed with rebar and #8 solid copper wire.2.

Light Niches

You have (3) #8 stranded and insulated wires coming into the light niches. These are likely being used for additional bonding (confirm per your local inspection authority).3.

Cover Motor

Here's where the question arises.

EGC with Motor Wiring

The #12 EGC that comes with the cover motor wiring is primarily for fault current protection, but does play a role in bringing voltage potential to ground in the event of a failure.


Bonding to Grid

The critical question is, is the cover motor considered part of the "pool structure" and is it likely to become energized? Typically the answer is yes, especially if any part of the motor is within 5 feet of the inside wall of the pool.

Here's how to proceed



Preferred Method (and Likely Required): Supplemental Bonding Jumper
1. Connect to the Bonding Grid

The #8 solid copper wire that's part of your bonding grid
must be connected to the cover motor's metal parts. Use an appropriate bonding lug that is listed for direct burial.2.

Connection to Motor

Most motors have a bonding lug provided for this purpose. Connect the lug to the #8 solid wire.3.

Stranded is OK for Jumper

It
is perfectly acceptable, and often preferred, to transition from the solid #8 to a stranded #8 for this final connection to the motor. It provides more flexibility and reduces stress on the connections. Use a suitable connector to splice the solid to the stranded #8 wire.

Important Considerations



NEC 680.26(C)

Re-read this section of the NEC carefully. It spells out which metal parts must be bonded to the grid. Local interpretations can vary slightly.


Direct Burial Connectors

Use connectors that are listed and approved for direct burial.

Why the #12 EGC Alone is Insufficient

While the #12 EGC provides a fault current path, it is not a substitute for the equipotential bonding grid. The grid is about preventing voltage differences in the first place, not just clearing faults.* The bonding grid creates a low-impedance path that is far more effective at equalizing potential than relying solely on the EGC through the raceway.

In summary



You should bring a #8 copper conductor, ideally stranded, and use it as a bonding jumper between the #8 grid wire and the motor's bonding lug.