Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: Long row of exterior lights set in CMUs

User: AedinP, Location: Pacific Northwest

Asked on: Thursday, September 11, 2025 at 10:10 pm EDT
Answered on: Thursday, September 11, 2025 at 10:10 pm EDT

Question: Hi all,I'm point-man on a medium size aquatic center with two buildings which have both have wall sconces/wallpacks along the entire length of the building. The boxes for the fixtures will be flush with the CMU face.My first thought is to obviously connect the boxes with PVC horizontally as that makes the most sense; however there are several "columns" of solidly grouted cells which have a single #5 rebar going from down in the stem wall up to the top, and spec forbids us from having conduit in the same cell with rebar.Second thought would be to feed them overhead above the ceiling, but it's a hard ceiling across the whole building so we can't have junction boxes in the ceiling from which we would drop down to the lights with flex or something.Third and final thought, unless there's a better way, is to put two 90s (in and out) in the stem wall beneath each light fixture and connect them with PVC "U's" underground. This would just mean that essentially we are at 360 degrees of bends between each fixture. We have not yet started under slab electrical but we are putting rigid foam blocks in the stem walls before they pour to be able to turn up 90s inside the CMU cavity.ANY ADVICE? I've never done boxes set in CMUs before and am making it work as I go. At least a discussion would be great as I have learned a lot from reading this forum.Attached are a couple screenshots of the lighting print. Let me know if I need to clarify anything.Aidan

Okay, Aidan, this is a tricky situation, but let's brainstorm some ideas. You're right to be concerned about the conduit fill and the 360-degree bend limit. Here's a breakdown of your thoughts and some additional possibilities

Analysis of Your Current Ideas:
Horizontal PVC

As you pointed out, the rebar issue makes this problematic. Code prohibits conduit and rebar occupying the same space. The cost to cut/jackhammer/re-route each of the rebar pieces would be excessive.


Overhead Above Ceiling

You've correctly identified the issue with hard ceilings and inaccessible junction boxes. That idea is a no-go without some serious structural changes.

Underground "U"s

While technically workable, the 360-degree bend limit is a major concern. Here's why:


NEC 352.26 Bends - Number in One Run

"There shall not be more than the equivalent of four quarter bends (360 degrees total) between pull points, for example, conduit bodies and boxes."



Practical Issues

Even with careful bending, pulling wires through that many bends, especially over long distances, is going to be a nightmare. You'll likely damage the insulation, increasing the risk of shorts and ground faults.


Code Compliance Issues

Inspectors will likely flag this.

Alternative Solutions and Considerations


Surface Mount Conduit (EMT or Rigid)

This would be the most straightforward and code-compliant. You'd run conduit along the surface of the CMU wall. While it may not be the most aesthetically pleasing, it is the most practical.

Advantages

Easy to install, easy to access, fully compliant with bend radius and pull point requirements.

Disadvantages

Aesthetic concerns. Might require painting or other finishing to blend with the building.


Mitigation

Consult with the architect about potentially using EMT or Rigid painted the same color as the building and installing it in a very neat and organized fashion. Sometimes, a well-executed surface mount can be acceptable.2.

Coordinate with Structural to Shift Rebar

This is unlikely but worth exploring, especially if the project is still in early construction phases. Can the rebar be strategically moved slightly within the cell so that conduit can pass alongside it?

Advantages

Maintain flush appearance and avoid surface conduit.

Disadvantages

Could be structurally difficult or require engineering approval. Added cost due to redesign.


Important

Absolutely DO NOT modify the rebar placement without a structural engineer's review and stamped approval. This is a critical structural element.3.

Core Drilling & Sleeving

Core drill through the CMU horizontally, avoiding the reinforced cells. Install a sleeve (metal or PVC) through the core hole and run your wiring through the sleeve.

Advantages

Maintains flush appearance. Avoids the 360-degree bend issue.

Disadvantages

Requires careful coring to avoid hitting rebar or other utilities. Requires structural engineer approval, as you are weakening the wall to some degree.


Important

Structural engineer must determine acceptable core hole sizes and spacing. The inspector will scrutinize this heavily.4.

Combination Approach

Consider a hybrid solution. If you can't run horizontally for every fixture due to rebar, perhaps you can run horizontally for a portion of the run and then use one of the other methods (core drilling or surface conduit) to bypass the obstructions.5.

Consider Wireless/Low Voltage Options (Potentially as an Add)

Depending on the fixtures being used, there might be a way to make them into low voltage lights or even wireless in terms of the switching.

Advantages

Easier to Install, no need for conduit and pulling, would get you out of a bind in case the original plan doesn't work.


Disadvantages

Likely more expensive, may not get the lighting the owner wants.

Recommendations


Consult with the Electrical Engineer and Architect

This is the most important step. Present your challenges and proposed solutions to them. They will be able to provide guidance based on the project's design intent, budget, and code requirements. They can also advise on any permissible deviations from the original plans.2.

Inspect the CMU Cells

Visually inspect the cells to confirm the rebar placement and spacing. Use a borescope if necessary. Accurate information about the obstructions is crucial for planning.3.

Contact the Local Inspector

Discuss your concerns with the local electrical inspector. They may have seen similar situations and can offer valuable insights.

Key Questions to Ask: Is surface-mounted conduit a possibility, and if so, what are the aesthetic requirements (e.g., color, mounting method)? Can the rebar be shifted slightly to allow for conduit runs (requires structural engineer approval)? Would the inspector allow core drilling for sleeves, subject to structural engineer approval? What wire fill are you using? Can you use a smaller sized conductor?This is a challenging situation. Good luck, Aidan, and let us know what you decide! Flag for review

Previous Question Next Question