Topic: Add Holes to Panel?

User: blackmountain, Location: Northern California

Asked on: Wednesday, September 17, 2025 at 3:36 pm EDT
Answered on: Wednesday, September 17, 2025 at 3:41 pm EDT

Question: There shouldn't be any problem with punching a hole in the side of the meter main, right? I need to run some large feeders to the sub-panel to the left of it. I have to get three 3/0 wires from the panel on the right, to the one on the left, and using conduit bodies would be tight...even with 2". There are knockouts on the bottom that I can use, using the sides would be a lot cleaner (I think?)Thanks

Absolutely do not punch a hole in the side of your meter main. This is extremely dangerous and illegal for several critical reasons: Safety Hazard

The meter main is the point where utility power enters your home. It is always energized, even with the main breaker off. Punching a hole could create a short circuit, resulting in an arc flash, electrocution, fire, and/or significant damage to your electrical system and potentially your home. You could be severely injured or killed.


Violation of Electrical Codes

Electrical codes (like the NEC in the US) strictly prohibit unauthorized modifications to electrical equipment, especially the service entrance. The meter main is sealed by the utility company, and any alteration voids the warranty and creates liability issues.

Utility Company Property

The meter main is generally owned and maintained by the utility company, up to the load side of the meter (the point where your home's wiring begins). Modifying it is considered tampering and can lead to fines, service disconnection, and legal repercussions.

Here's how to properly run your 3/0 feeders to the subpanel


Use Existing Knockouts (Preferred)

You mentioned knockouts at the bottom. This is the most code-compliant and safest approach. Use the correct size knockout and a listed connector appropriate for the conduit type you choose.2.

Consult an Electrician



Seriously, call a qualified, licensed electrician.
This is not a DIY job. They have the experience and knowledge to handle service entrance wiring safely and in accordance with local codes. They can assess the situation, determine the best way to run the feeders, and ensure everything is properly grounded and protected. An electrician may recommend different methods of extending the wires to the subpanel.3. Conduit Considerations

Conduit Fill: The electrician will calculate the proper conduit size based on the number and size of conductors. This is crucial to avoid overheating and damage to the wires. Conduit Bodies: Yes, even with 2" conduit, conduit bodies can be tight. An electrician can assess how best to use them or consider other options. Larger LB condulet or pulling elbows may be needed.4.

Proper Grounding

The grounding conductor needs to be properly sized and connected to both panels. This is critical for safety.5.

Permits and Inspections

* Any work on the service entrance or subpanels will likely require permits and inspections by your local electrical authority. The electrician will handle this process.

In summary, punching a hole in your meter main is NEVER acceptable. Contact a licensed electrician to safely and legally handle your feeder installation.