Question: I would like to install a SolarEdge 3-phase revenue grade energy meter in a 480V system with a SolarEdge TRI Synergy 120kW inverter at the inverter location. The Inverter has 1/2 inch stud terminals for for L1,L2,L3 & N connections. I'm planning on a 200A 600V nonfusible safety switch as a PV system disconnect at the inverter as well. There will be a second fused safety switch at the other end near the point of interconnection. I would like to add the meter in an enclosure adjacent to the inverter and switch, on a DIN rail with 12AWG THHN for the meter L1,L2,L3,N voltage connections.Is there any issue with removing the mechanical lugs from the safety switch on either the line or load side, and landing the AC conductors on the lug stud/bolt using compression terminals, along with the 12AWG meter voltage conductors with similar compression terminals? I would install the CT's in the disconnect as well. The meter can be DIN rail mounted if I mount the rail in the switch.Alternatively, I could run the meter voltage leads to the inverter and land them via 1/2" Hole compression lugs, over the same studs for the 4/0 Line connections to the inverter. I could add midget fuses (like 2A or so) inline with the 10AWG meter voltage sense conductors if needed, either within the inverter enclosure, or on din rail fuseholders in the meter enclosure, but not sure that is necessary.Any thoughts?

Okay, let's break down your plan for installing the SolarEdge revenue-grade meter and address your concerns. Your goal is a safe and code-compliant installation.

Overall Approach & Safety Considerations Safety First

Always de-energize and lockout/tagout any electrical equipment before working on it. Double-check with a meter to confirm no voltage is present. Assume everything is live until proven otherwise.


National Electrical Code (NEC)

This is the governing document. Ensure your design and installation comply with all applicable sections.

Local Codes and AHJ (Authority Having Jurisdiction)

Local codes may be stricter than the NEC. The AHJ (inspector) has the final say. Get approval before starting the work.


Equipment Ratings

Verify that all components (switches, lugs, terminals, wire, CTs, meter) are rated for the voltage and current levels in your system.

Proper Grounding

Ensure a solid and continuous grounding system throughout the installation.

Analyzing Your Options


Here’s an analysis of your two proposed options

Option 1: Meter Voltage Connection in Safety Switch

Pros

Potentially simpler wiring within one enclosure (less conduit/wire pulling). Keeps meter voltage wiring separate from inverter internals.

Cons



Potential Code Violation: Replacing Listed Lugs

Replacing listed lugs with other terminals in a listed piece of equipment can violate the listing unless specifically approved by the equipment manufacturer (check with switch manufacturer). This is a significant concern.

Crowding

The safety switch enclosure can quickly become crowded, making installation and future maintenance difficult.


Torque Requirements

Properly torquing multiple conductors on a single stud can be challenging and prone to errors. Using a calibrated torque wrench is essential.

Lug Compatibility

Make sure the compression lugs you plan to use are rated for the specific stud size and material of the safety switch. Aluminum lugs on copper studs are a big no-no.


Access

the revenue grade meter would be exposed to the elements when the switch is opened during service.

Option 2: Meter Voltage Connection at Inverter Terminals
Pros

Avoids modifying the listed safety switch. Potentially less crowding in the safety switch.

Cons



Inverter Manufacturer Approval

Check with SolarEdge to ensure that adding additional conductors to the inverter's output terminals doesn't void the warranty or violate the inverter's listing. This is VERY important.


Internal Inverter Wiring

Requires running low-voltage wires into the inverter, which must be done carefully to avoid damage or interference with the inverter's internal components.

Wire Routing

Ensuring the meter voltage wires are neatly routed and adequately supported inside the inverter.


Physical Space

Confirm that there's enough physical space within the inverter's wiring compartment for the additional lugs and wiring.

Recommendations and Best Practices
1. Consult the Manufacturers



The most important step is to contact SolarEdge and the safety switch manufacturer.
Ask specifically about adding additional conductors to the inverter output terminals (Option 2) or replacing/adding conductors to the safety switch studs (Option 1). Get written confirmation. This will protect you from potential warranty issues or code violations.2. Best Approach (if approved by manufacturers)

I would lean slightly towards

Option 2 (meter voltage connection at inverter terminals),
IF and ONLY IF SolarEdge approves it in writing. Here's why: Preserves Safety Switch Listing

Avoids modifying the listed safety switch, which is a major advantage.


Neat Installation

With careful planning, the low-voltage wires can be neatly routed and secured within the inverter's wiring compartment.3.

Fuses



Option 2, Inverter Connection

YES, include midget fuses (2A is a good starting point; verify with meter and inverter documentation)
inline with the 12AWG meter voltage sense conductors. Install them in DIN rail fuse holders within the meter enclosure. These fuses provide a critical safety measure in case of a fault in the meter or its wiring. They protect the inverter from a potential short circuit.

Option 1, Safety Switch Connection

Similar fuse protection would be prudent here as well.4.

CT Placement

The CTs must be installed before any overcurrent protection devices (fuses or circuit breakers). This ensures that the meter accurately measures the current flowing through the entire system. Mount the CT's within the disconnect switch.5.

Wire Size

12AWG is likely adequate for the meter voltage connections, given the relatively short distance and low current. However, verify with the meter manufacturer's specifications and any applicable derating factors (ambient temperature, conduit fill, etc.). Ensure the wire insulation is rated for the voltage (600V).6.

Compression Lugs

Use appropriately sized and rated compression lugs for ALL connections. Verify the lugs are compatible with the conductor material (copper or aluminum). Use dual-rated lugs if needed. Use the correct crimping tool and die for the specific lug type. Apply an anti-oxidation compound (e.g., NOALOX) to aluminum conductors before crimping.7.

Torque

Torque all connections to the manufacturer's specified values using a calibrated torque wrench.8.

Documentation

Keep detailed records of all components used, wiring diagrams, torque values, and manufacturer approvals.9.

Inspection

Have the installation inspected by a qualified electrician and the AHJ.

Additional Tips
Enclosure Size

Select an appropriately sized enclosure for the meter, DIN rail, fuse holders, and wiring. Ensure adequate ventilation if required.


Layout

Plan the layout of the components carefully to ensure easy access for wiring and maintenance.

Wire Management

Use wire ties, cable trays, or other wire management methods to keep the wiring neat and organized.


Labeling

Clearly label all conductors and components.

In summary


Contact SolarEdge and the safety switch manufacturer for approval to modify their equipment.
2. If approved, Option 2 (connecting to the inverter terminals) is generally preferable to avoid modifying the safety switch.3. Include inline fuses on the meter voltage leads for safety.4. Install the CTs in the safety switch.5. Follow all applicable codes, use appropriately rated components, and torque all connections correctly.6. Document everything and have the installation inspected.

This is a complex installation. If you are not a qualified electrician with experience in PV systems, it is strongly recommended that you hire a professional. Mistakes can be dangerous and expensive. Good luck! Flag for review