Mike Dolt Enterprises Logo Mike Dolt Enterprises

Topic: Residential Estimating - Tracking What's Used

User: Travisb6989, Location: FL

Asked on: Monday, September 29, 2025 at 7:48 am EDT
Answered on: Monday, September 29, 2025 at 7:49 am EDT

Question: I have owned a high end automation company for 15 years and about 3 years we started doing high voltage for the custom homes we are already in doing all the LV and AV. Unlike LV where things are more predictable what BOM is needed, electrical has thousands of parts and nearly impossible to predict or estimate what a job will need. From conduit fittings, mud rings, straps, plates, etc. I am struggling how to track all of that. Maybe I am being to detailed with tracking every piece?I have an idea of parking a stocked trailer on jobs to increase efficiency and stop all the supply house trips, but I also don't want guys just grabbing stuff they need with no way to track any of it.Again, maybe I am overthinking this. Its just a different animal with LV where things are refined and specific.If you don't have anything positive say, just keep scrolling...

Okay, let's tackle this challenge of managing electrical materials for your high-end automation business. It's a legitimate pain point, moving from the structured world of LV/AV to the more variable realm of high voltage. You're absolutely right, electrical has a HUGE BOM potential! Here's a breakdown of ideas and strategies, focusing on finding a balance between control and efficiency

Understanding the Core Issue:

You're experiencing a common problem: the sheer number of SKUs in electrical, coupled with the variability of construction. You want: Accurate Estimates

To bid competitively and profitably.


Inventory Control

To minimize waste, prevent theft, and understand material costs per job.

Increased Efficiency

Less trips to the supply house, more time spent on actual installation.


Accountability

Knowing where materials are going and that they're being used properly.

Strategies to Consider


Refine Your Estimating Process



Standard Packages/Assemblies

Break down common tasks (e.g., "Recessed Lighting Installation," "GFCI Outlet Addition") into pre-defined material packages. Over time, you'll refine these packages based on actual usage data. Think of it like creating modular assemblies in your LV/AV world. This is a HUGE time saver.


Percent Contingency

Include a percentage (5-10%) in your estimates specifically for "incidentals" – those small parts you inevitably need. Track how often you actually use this contingency and adjust it accordingly.

Use a Dedicated Estimating Software

Consider software like Accubid, Trimble, or similar estimating solutions specifically designed for electrical contractors. They have extensive databases and allow for easier pricing updates.


Detailed Walk-Throughs

Before bidding, do very detailed walk-throughs with the client and your team. Identify potential challenges, unusual circumstances, and anything that might deviate from your standard packages.

Phased Estimates

For very large projects, consider breaking down the estimate into phases (e.g., rough-in, trim-out). This allows for adjustments as you progress and learn more about the specific project.2.

Material Management Strategies (Including the Trailer Idea)



The "Job Box/Trailer" Concept (Refined)

Your trailer idea is good, but needs structure.

Stocked with Common Items

Focus on high-usage items: wire connectors, common outlet boxes, conduit fittings, basic screws and fasteners, wire staples, basic hand tools (that are consumables).


Color-Coded Bins/Organization

Make it EASY to find things quickly.

Checkout System (Crucial)

This is the key to tracking. Here are a few options:

Simple Log Sheet

Each item in the trailer has a code (e.g., "Connector-Blue"). When someone takes something, they write: Date, Job Name, Item Code, Quantity, Initials. Low-tech but better than nothing.

QR Code/Spreadsheet System

Create QR codes for each item. Techs scan the QR code with their phone, which opens a simple Google Sheet where they enter the date, job name, and quantity.


Dedicated Inventory App

There are apps (e.g., Sortly, Inventory Now) that can handle this, allowing for scanning, tracking, and even setting reorder points.

Restocking Protocol

Assign someone to regularly check the trailer inventory and restock it based on the checkout logs.


Trailer Security

Obviously, secure the trailer to prevent theft.

Central Warehouse (If Feasible)

If you have enough projects going, consider a small central warehouse where you can store larger quantities of materials and pre-build some assemblies.


"Staging" Areas

For larger jobs, designate a specific area on the job site for material deliveries. This keeps things organized and reduces clutter.

Supplier Relationships

Build strong relationships with your electrical supply houses. Negotiate pricing, early delivery, and potentially even consignment arrangements for larger projects.3.

Leverage Technology



BIM (Building Information Modeling)

If you're working on large, complex custom homes, consider using BIM software. It allows for accurate material takeoffs and can help identify potential conflicts early on.

Project Management Software

Use software like Buildertrend, CoConstruct, or similar platforms to track project schedules, budgets, and material costs. Many offer integrations with accounting software.4.

Training and Accountability



Train Your Team

Educate your electricians on the importance of proper material management and the procedures you've put in place.

Hold People Accountable

If you're consistently seeing discrepancies between estimated and actual material costs, address it with the team. Don't be punitive, but emphasize the importance of accuracy and responsible material usage.


Feedback Loops

Encourage your electricians to provide feedback on the accuracy of your estimates and the effectiveness of your material management processes. They're the ones on the front lines and can offer valuable insights.

Addressing Your Specific Concerns



"Too Detailed Tracking?"
Yes, tracking every single screw is overkill. Focus on the items that represent the biggest cost and usage. For the very small parts, consider a "petty stock" system – a small bin where they can grab a handful without formally checking it out. "Guys Grabbing Stuff with No Tracking?" This is precisely what you want to avoid. The key is to make the checkout system easy and convenient. If it's a hassle, they won't do it.

Pilot Program

Before implementing any of these strategies company-wide, start with a pilot program on one or two projects. This will allow you to test your processes, identify any weaknesses, and refine your approach before rolling it out to the entire team.

The Bottom Line:


You're not overthinking it. Material management in electrical is complex. But by implementing a combination of refined estimating, structured material management, and leveraging technology, you can gain control, improve efficiency, and ultimately increase your profitability. Good luck! Flag for review

Previous Question Next Question