Question: LIttle late to ask after I submitted my bid and got approval lol- but first solar project got a question..........Alright I got a 400 amp service outdoor remote to home about 50 feet. Asphalt--- from that meter its also 150' to the metal non dwelling shed were the array will be mounted. Want to put in a Franklin 2a down in shed---- Reason is incase of a fire its not in the home- I am installing a Franklin apower 2 battery system with a Franklin Agate.I was reading that the a gate can't be outside- and the distance that the apower2 from gate way is 164 feetSo my problem is - I was going to build a shed at the meter and put the Franklin in there but then my service disconnects are in the home so was pondering that, --- but then I realized I have to transfer the entire home and not just the 200 amps the 1 agate I have is rated for.---------How can I fix my mess up....... do I need another agate and can they interlink?
Okay, this is a tricky situation, but let's break it down. It sounds like you have a good understanding of the individual components, but the system design and placement are presenting a challenge. Here's a breakdown of the issues and potential solutions
Issues as I understand them:
1. Agate Placement
The Franklin Agate (the gateway) cannot be installed outdoors. You were planning to house it in a shed at the meter, but that's not an option now.2.
Agate Distance
The Franklin A-Power 2 battery system must be within 164 feet of the Agate. Your array location (the metal shed) is approximately 150 feet from the meter, meaning it's potentially further than 164 feet from where you would put the agate.3.
Whole-Home Backup vs. Limited Backup
The single Agate you have is only rated for 200A transfer. Your 400A service means you need to transfer the entire home's load in case of grid outage, not just a 200A portion.4.
Service Disconnect Location
Your existing service disconnects are in the house, which makes moving the entire system to the shed at the meter complex and potentially costly.5.
Fire Safety
You correctly identified that keeping the battery system away from the house is safer in the event of a fire.
Possible Solutions and Considerations
1. Two Agates
Can Agates Interlink? YES, multiple Franklin Agates can be used together and linked to a single FranklinWH ecosystem. This is designed precisely for situations where a single Agate doesn't provide sufficient backup capacity or where physical separation is required. This is likely your best solution. Pros
Whole-Home Backup: Two Agates can provide the necessary 400A transfer capability. Maintains Fire Safety: You can still keep the batteries in the shed, away from the house. Flexibility: You can place one Agate closer to the batteries and the other closer to the home's load center.
Cons
Cost: Requires purchasing a second Franklin Agate, which is a significant expense. Complexity: Requires careful planning and coordination of the two Agates within the system.
2. Move Everything Closer to the House
Pros
Simplifies wiring and reduces distances. Eliminates the need for a second Agate.
Cons
Loss of Fire Safety: The battery system would be adjacent to the house. Significant Wiring Changes: You would need to run heavy gauge conductors from the array to the new location, and potentially move your main service disconnects.
3. Subpanel Approach (Less Recommended)
Idea
Run a subpanel from your main service into the metal shed. This subpanel would be rated for the maximum output of the A-Power 2 system and backfeed into the main service through the single Agate.
Pros
Potentially cheaper than two Agates. Maintains fire safety.
Cons
Limited Backup: You are still limited to the 200A transfer capacity of the single Agate, which would not provide whole-home backup. Code Compliance: This approach is complex and requires careful adherence to NEC (National Electrical Code) requirements for backfeeding and overcurrent protection. You'll need to ensure all breakers are properly sized and that backfeed protection is in place to prevent energizing the grid during an outage. System Imbalance: It's generally not advisable to have a significant load backfeeding into a main panel unless the system is specifically designed for that purpose.
Recommendation
I strongly recommend pursuing the
two Agate solution. While it's the most expensive upfront, it provides the best combination of: Whole-Home Backup
This is crucial for a truly reliable backup system.
Fire Safety
Keeping the batteries in a separate structure is a wise decision.
System Performance
Proper sizing and capacity ensure the system operates as intended.
Steps to Take Now
Contact FranklinWH Immediately
Explain your situation to FranklinWH technical support. They can provide detailed guidance on using multiple Agates, system configuration, and compatibility. They can also help you ensure your design meets their specific requirements and warranty conditions.2.
Consult with a Qualified Electrician Familiar with Solar + Storage
This is absolutely essential. You need a professional who understands the complexities of NEC, battery systems, grid interconnection, and the specific requirements of the FranklinWH system. They can help you develop a detailed wiring diagram and ensure the installation is safe and code-compliant.3.
Confirm Distances
Accurately measure the distances between all key components: meter, shed, house, and potential Agate locations. Use these measurements to finalize the system layout.4.
Review Permit Requirements
Check with your local permitting authority to understand the requirements for adding a second Agate and modifying your electrical system.
Important Considerations
NEC (National Electrical Code)
All electrical work must comply with the latest edition of the NEC. Pay particular attention to: Conductor sizing (appropriate for ampacity and voltage drop). Overcurrent protection (fuses and breakers). Grounding and bonding. Disconnecting means. Backfeed protection (if using the subpanel approach).
Utility Interconnection
You will need to coordinate with your utility company to ensure the system is properly interconnected to the grid. They may have specific requirements for grid-tied solar + storage systems.*
Professional Installation: While you may be capable of doing some of the work yourself, I strongly recommend hiring a qualified electrician to handle the critical connections, wiring, and commissioning of the system. This will ensure safety and compliance with all applicable codes and regulations.Don't panic! This is a solvable problem. The key is to get expert advice and make informed decisions based on your specific needs and circumstances. Good luck! Flag for review