Topic: Estimating Damaged Units

User: mannyb, Location: Florida

Asked on: Sunday, October 5, 2025 at 12:06 pm EDT
Answered on: Sunday, October 5, 2025 at 12:07 pm EDT

Question: Whats best approach when bidding a fire damaged apartment units. 4 of 12 unit apartment complex were fire damaged. The city doesn't necessarily require all the wiring to be replaced as new only the damaged portions. The fire didnt damage all the units only the adjacent walls. The city is requiring the panels be updated to code. How would you approach a bid for something like this? Its possible inspector finds items not necessarily quoted but has to be updated.

Okay, bidding on fire-damaged apartment units is tricky, but here's a systematic approach, keeping in mind the unknowns and potential for change orders.1. Initial Site Visit and Assessment (Critical!) Thorough Inspection

Walk through each of the four units
and the main electrical room(s). Document everything with pictures and notes. Look for:

Extent of Fire/Smoke/Water Damage

How far did the fire actually reach? Smoke and water can travel far beyond visible burn damage. Check inside walls (if possible), in attics/crawlspaces above and below, and around HVAC systems.

Wiring Condition

Visually inspect all wiring, conduit, boxes, and devices in and around the damaged areas. Look for:
Melted insulation Charring Cracked or brittle wiring Water damage/corrosion Loose connections

Panel Condition

Assess the existing panels:
Age and condition (corrosion, rust, physical damage) Available space for new breakers Proper labeling Adequate grounding Compliance with current code requirements (AFCI/GFCI protection, etc.)

Other Electrical Systems

Check:
Smoke detectors (likely all need replacement) Carbon monoxide detectors (if required) Fire alarm system (if applicable – may need inspection/recertification) Emergency lighting (if applicable)

Accessibility

How easy is it to get materials and equipment into the building and to the units? Are there stairs, elevators, parking limitations?

Hazards

Are there any safety concerns (e.g., asbestos, mold, structural instability)?


Meet with the Property Owner/Manager

Understand their priorities (speed, budget, quality). Ask if they have any specific requirements or preferences. Confirm if they have insurance coverage for the electrical work. This can influence the budget and scope.

Clarify with the City Inspector

Don't rely solely on what you're told initially. Get it in writing if possible. Ask specifically about the requirements for: Panel upgrades (what codes are being enforced?) Wiring replacement (acceptable splicing methods, areas requiring full replacement) AFCI/GFCI protection Smoke/CO detector requirements Any other potential issues they foresee. Ask about the inspection process and what documentation they'll require.

2. Scope of Work (Detailed and Specific)
Itemize Everything

Don't just say "replace wiring." Be specific:
"Remove and replace X feet of 12/2 NM-B cable in Unit 1, from [location] to [location]." "Replace all receptacles and switches in Unit 2 due to smoke damage." "Install new 200A main panel with 42 circuits in the main electrical room. Include all necessary breakers, feeders, grounding, and labeling according to NEC [year] code." "Install AFCI breakers on all 120V branch circuits serving bedrooms in Units 1-4, as required by code." "Install interconnected smoke detectors in each bedroom and hallway of Units 1-4, as required by code."

Clearly Define "Damaged Portion"

Be very specific about what constitutes "damaged" wiring that requires replacement. This is crucial to avoid disputes later. For example:
"Any wiring with visible burn marks, melted insulation, or that has been exposed to direct flame will be replaced." "Any wiring exposed to heavy smoke or soot will be cleaned and tested. If testing indicates a reduction in insulation resistance, the wiring will be replaced." (This might require hiring a testing company)

Address Panel Upgrades

List the specific components of the panel upgrade (new panel, breakers, feeders, grounding, etc.). Confirm that the panel size is adequate for the existing load and any potential future load increases.

Include Demolition and Cleanup

Specify who is responsible for removing debris, patching walls after wiring, etc.


Address Existing Issues

If you notice any pre-existing code violations or electrical problems (unrelated to the fire), point them out and include them as separate line items in the bid. Give the owner the option to address them during the fire repair.

3. Pricing and Labor
Material Costs

Get accurate quotes from suppliers for all materials. Factor in potential price increases.


Labor Costs

Estimate the labor hours required for each task. Consider the difficulty of the work, accessibility, and potential delays. Add a contingency for unexpected issues.

Overhead and Profit

Add your standard overhead and profit margins.


Permit Fees

Include the cost of all necessary permits.

Contingency

This is
essential for fire damage work. Include a line item for "Contingency for unforeseen conditions" (e.g., additional wiring replacement, hidden damage, code changes). A reasonable contingency is 10-15% of the total bid. Clearly state in your proposal how this contingency will be used and how it will be documented (e.g., with photos and change order requests).

Change Order Process

Outline your process for handling change orders. Specify how they will be documented, priced, and approved before the work is performed.

4. Assumptions and Exclusions (Very Important!)
Assumptions

List all assumptions you're making in your bid. For example:
"This bid assumes that the existing electrical service to the building is adequate to handle the new panel and load." "This bid assumes that there are no hazardous materials (asbestos, lead paint) present in the work area." "This bid assumes that the existing wiring is copper. Aluminum wiring will require a different approach and will be priced separately."

Exclusions

List any work that is
not included in your bid. For example: "This bid does not include repair or replacement of fire alarm system components." "This bid does not include patching or painting of walls after wiring." "This bid does not include mold remediation." "This bid does not include overtime work."

5. Payment Schedule
Structure your payment schedule to reflect the progress of the work. Consider: Initial deposit (for materials and mobilization) Progress payments (based on completed work milestones) Final payment (upon completion and inspection)6. Warranty State the warranty on your workmanship and materials.

Example of Contingency Clause

"This proposal includes a contingency of 10% of the total project cost to cover unforeseen conditions that may arise during the course of the work. Examples of unforeseen conditions include, but are not limited to: additional wiring damage discovered after demolition, code changes required by the inspector that were not initially identified, and unexpected structural issues that impede the electrical work. Any use of the contingency funds will be documented with photographs and a written change order request, which must be approved by the property owner before the work is performed. Any unused contingency funds will be credited back to the owner upon completion of the project."

Key Considerations for Success



Communication

Maintain open and frequent communication with the property owner/manager and the city inspector throughout the project.


Documentation

Document everything! Take photos of the work before, during, and after. Keep detailed records of all materials used and labor hours spent.

Flexibility

Be prepared to adapt to changing conditions and unexpected challenges.


Professionalism

Present yourself and your company in a professional manner. Be responsive, reliable, and committed to delivering high-quality work.*

Insurance:
Ensure your business insurance is up to date and covers fire-related electrical work.By following this approach, you'll create a comprehensive bid that protects your interests, minimizes the risk of disputes, and helps you win the project. Good luck! Flag for review